Loading...
HomeMy WebLinkAboutTLBD Secondary Road SignageT.L.B.D.A.C. SECONDARY ROAD SIGNAGE N RTHERN WAY ENECA VI T WI LA R OD T C RA R E RIAR H L C K R YON ET ND STOP 8 STREET 35 12 6 3 4 7 2 12 4 4 gTOp 15 8 4 1 4 5 1 STREET 4 SPEED LIMIT 16 5 4 2 6 2 2 1 1 PEDESTRIAN 1 1 6 2 1 1 DIRECTION 2 4 2 3 8 NO TRUCK8 1 4 SEMINOLE TRAIL 2 2 NO PARKING 6 2 2 FIRE 2 WEIGHT LIMIT 2 ~a sTREEr I FIRE s~ $ 1,100.00 s s7,9oo.00 4z s +te,wo. ~ ~ -51700.00 3s $ s5o.oo s 30,800.00 ~~ 12,750.00 21 ~ 17,0. 4 $ a75.oo $ 2,700.00 ~ 3 2,700. 39 $ 675.00 $ 26325.00 16 `$ 10,800.00 23 $ 15,525.00 12 19 5 4 10 2 2 ^- ---^ r--_~-, - -- --- -- T.L.B.D.A.C. SECONDARY ROAD SIGNAGE N RTHERN WAY ENECA VISTAWIL TROTW D T RA NBRI H L C E E N Y N LAND STOP 8 STREET 35 12 6 3 4 7 2 12 4 4 STOP 15 6 4 1 4 5 1 STREET 4 SPEED LIMIT 16 5 4 2 6 2 2 1 1 PEDESTRIAN 1 1 6 2 1 1 DIRECTION 2 4 2 3 8 NO TRUCKS 1 4 SEMINOLE TRAIL 2 2 NO PARKING 6 2 2 FlRE 2 WEIGHT LIMIT 2 (SPEED LIMIT I INO TRUCKS I NO PARKING FlRE r /1LL ~ ~1 89 S 1,100.00 $ 97,900.00 35 $ 38,St10.fl0 54 # x,400.00 ~ $ 850.00 $ 30,600.00 15 ~ t2,75fl.oo 21 s 1~s50.oo 4 $ 675.00 $ 2,700.00 ; 4 s 2, .oo 39 $ 675.00 $ 26,325.00 16 $ 10,800.00 23 $ 15,525.00 is 19 5 4 10 2 2 $ 157,525.00 $ 95,475.00