Loading...
HomeMy WebLinkAbout1999 04 27 Other Memo from Ron McLemore APRIL 27, 1999 HANDOUT FROM CITY MANAGER RON McLEMORE. ". ~\~]'J::-9, -S' (j/,~\ <h~:,. " ,,J",, .\~ .)../ . "\. ..>~ '1--.. \~ 1-1.' .,.. - /. . \ U' ',,-.j ICIJ , \ ",. I. \lncorplll'~i '.\, )/ """- 195Q:'j' ',t--2:0R\O~ Ronald W McLemore City Manager CITY OF WINTER SPRINGS, FLORIDA 1126 EAST STATE ROAD 434 WINTER SPRINGS, FLORIDA 32708-2799 Telephone (407) 327-1800 MEMORANDUM To: Tuscawilla Beautification and Lighting District Advisory Committee From: Ronald W. McLemore, City Manager v- Date: April 26, 1999 Subj: Comparison of Assessment District and Florida Power Corporation Lighting Cost Staff has completed its analysis of the cost of the proposed lighting system for the District, comparing the service being provided by a Florida Power Corporation owned system and an Assessment District owned system. In both scenarios, full replacement cost of the Capital Investment has been calculated. For the Assessment District option, staff used a replacement cost developed from combined 15 and 30 year and full 30-year life cycles. As we understand it F.P.C utilized a 7-year cost recovery system. Based upon an analysis the annual cost are as follows: Florida Power Corporation Owned Assessment District Owned $51,800 $71,371 Additionally, we tested to see what the cost would be if we utilized a full 3D-year capital cost recovery rather than a combined 15/30-year cost recovery. This option also demonstrated the F.P.C. option to be the least costly as follows: Florida Power Corporation Owned Assessment District Owned $51,800 $62,236 Therefore, I am at this time concluding that the F.P.C. alternative should be recommended to the City Commission. If the Committee can provide additional data that might change this conclusion I would certainly be willing to change my recommendation. ".. There are two alternative courses of action. 1. The Committee and staff agree on a recommendation. In this case the issue of the lighting provider will be included in your final report. 2. The Committee and staff do not agree on a recommendation. In this case the staff will place this issue on the May 1 0, 1999 agenda for final disposition by the City Commission. Ijp cc: Mayor and Commission Word/Memo/Apr99/District Comparison .' COMPARISON NET LIGHTING COST 30-YEAR BOND ISSUE 15/30 Yr. Life Cycle 30 Yr. Life Cycle Assessment Assessment Florida Power District District Corporation Total Cost $86,071 $76,936 $66,500 Less City 14,700 14,700 14,700 Contribution Net Cost $71.371 $62.236 $51 ,800 Parcels 4,468 4,468 4,468 Annual Assessment $15.97 $13.92 $11.59 ,r' ,- COMPARISON TOTAL ANNUAL LIGHTING COST 30-YEAR BOND ISSUE 15/30 Y r. Life Cycle 30 Yr. Life Cycle Assessment Assessment Florida Power District District Corporation Cost Electricity $4,500 $4,500 Maintenance Lamps/Fixtures $6,400 $6,400 Wiring $5,000 $5,000 Poles $1 .500 $1.500 Subtotal $12,900 $12,900 Insurance $500 $500 Replacement $26,001 $16,866 Administration Collections $2,200 $2,200 $2,200 Role Recertification $1 .500 $1 ,500 $1 ,500 Subtotal $3,700 $3,700 $3,700 Statutory Reserve $3,800 $3,800 $3,800 Debt Service $34,670 $34,670 Lease $59,000 TOTAL $86.071 $76.936 $66,500 ." ANAL YSIS DEBT SERVICE 30-YEAR BOND ISSUE Capital Cost Design Construction Lights Fixtures Poles Subtotal Wiring Wiring Conduit Subtotal TOTAL $20,000 $100,000 $130.000 $230,000 $154,000 $102,000 $256.000 $506.000 $34,670 Annual Debt Service ~ I ." ANAL YSIS REPLACEMENT COST 30-YEAR BOND ISSUE (15/30 Year Life Cycle) Cost Life Cycle Annualized Cost Design $20,000 30 $667 Design $10,000 15 $667 Lights Fixtures $100,000 15 $6,667 Poles $130,000 30 $4,333 Wiring Conduit $102,000 30 $3,400 Wire $154,000 15 $10.267 Subtotal $256,000 $13,667 TOTAL $516,000 $26.001 ASSUMPTIONS 1. 140 Light Installations. 2. Washington Pole w/Flagler Fixture. 3. is-year life cycle on wire. 4. is-year life cycle on fixtures. 5. 30-year life cycle poles and conduit. 6. Wire represents 60% of underground installation cost. 7. Conduit represents 40% of underground installation cost. J' J' ANAL YSIS REPLACEMENT COST 30-YEAR BOND ISSUE (30 Year Life Cycle) Cost Life Cycle Annualized Cost Design $20,000 30 $667 Lights Fixtures $100,000 30 $3,333 Poles $130,000 30 $4,333 Wiring Conduit $102,000 30 $3,400 Wire $154,000 30 $5,133 Subtotal $256,000 $8,533 TOTAL $506 , 000 $16.866 ASSUMPTIONS 1. 140 Light Installations. 2. Washington Pole w/Flagler Fixture. 3. 30-year life cycle on wire. 4. 30-year life cycle on fixtures. 5. 30-year life cycle poles and conduit. 6. Wire represents 60% of underground installation cost. 7. Conduit represents 40% of underground installation cost.