HomeMy WebLinkAbout2008 11 10 Informational 100 Status of Various Current Planning ProjectsCOMMISSION AGENDA
ITEM 100
November 10, 2008
Meeting
CONSENT
INFORMATIONAL X
PUBLIC HEARING
REGULAR
MGR. ~~`~/DEPT
Authorization
REQUEST: Community Development Department is advising the City Commission of the
status of various current planning projects.
PURPOSE: This purpose of this agenda item is to update the Commission on the status of
current planning projects and any events/changes since the last City Commission meeting.
Those projects listed below have had some form of activity since the last City Commission
meeting. For a complete listing of all projects with the project's history, please go to the
Shared Drive at S: I City of Winter SpringslDocslltem 100 Maps and Project History and look
at the 2008 09 22 COMM Info 100 Development Review, Baseline 1 document. The number
to the left of the Project name corresponds to the number on the City Map showing the location
of the project. These maps are available on the electronic file link shown above. Items that
have changed since the last update are shown in bold type.
(1) SJRWMD(formerly Minter) Site -Staff review was held on August 25, 2008. The
site plan was reviewed at the September 3, 2008 P&Z Board meeting and the
conditional use was reviewed at the September 4, 2008 BOA meeting. Both site plan
and first reading for the rezoning were approved at the September 22, 2008
Commission meeting. The Conditional Use Permit and second reading/adoption of the
rezoning (Ord. No. 2008-12) were held at the October 13, 2008 City Commission
meeting.
(3A) Mann Site -Preliminary engineering plans for the 7,500 S.F. Ladybird Academy
Daycare were submitted on September 4 and were addressed at the September 16, 2008
staff review meeting. The project received a unanimous vote for approval at the
October 7, 2008 P&Z Board meeting and was approved, subject to conditions, at the
October 27, 2008 City Commission meeting.
(4A)South Seminole Christian Church -The 2.91 acre developed church site, adjacent
to the south side of Barrington Estates, has applied for annexation into the City. The
owner is requesting a Commercial future land use (FLU) designation and C-1 zoning.
Staff review was held on September 2, 2008. The site is located within the SR 434 New
October 27, 2008
Information Item 100
Page 2
Development Overlay Zoning District. Staff and the applicant area working to finalize
the annexation agreement language for this project. First reading of the annexation
ordinance was held at the September 8, 2008 Commission.
(S) Greenway Professional Plaza (East Coast Believer's Church Property) -First
reading of the annexation ordinance (Ord. No. 2008-17) was held on September 8,
2008. The second reading and adoption was held on September 22, 2008. The first
reading of the FLU amendment (Ord. No. 2008-18) to Commercial with a Conservation
Overlay and the first reading of the rezoning (Ord. No. 2008-19) to Greeneway were
held at the October 13, 2008 City Commission meeting and they were adopted at the
October 27, 2008 meeting.
(6) Jetta Point Park -The $9.5 million slated for construction of the Jetta Point Park
project was re-appropriated in the Seminole County budget to help cover general fund
shortfalls for the 08-09 fiscal year. There are on-going discussions about increasing the
County's Bed Tax by two cents to fund this project and the Solder's Creek project.
Seminole County staff contacted City staff to schedule apre-application meeting
for Tuesday, December 2, 2008.
• (8) Oviedo Marketplace -The latest plan for Section B of Parcel 14 is comprised of a
77 unit condominium project. Staff met again with the applicant's team for this project
on September 4, 2008 to review the site plan proposal. A revised concept plan was
submitted on September 25 and was reviewed at the October 21, 2008 staff review.
(8A)Tuscawilla Country Club(Tuskawilla Greens) -The PUD master plan
amendment, preliminary & final PUD, and site plan received recommendations of
approval at a special August 21, 2008 P&Z meeting and were approved (along with a
development agreement and 4`" amended settlement agreement) at the September 8,
2008 Commission meeting. Plans for the renovation /modification of the tennis courts
and country club parking area were received on August 1, 2008 and were reviewed at
the August 19, 2008 staff review. The applicant submitted a plan for the borrow pit
along Northern Way for the fill material to be used on this project. Both the tennis
courts and borrow pit were addressed at the October 21, 2008 staff review. The tennis
court site plan is scheduled for the November 5, 2008 P&Z Board meeting.
• (11) JDC Calhoun I. Construction continues. City records indicate the following
businesses are locating or have located in the JDC Calhoun Town Center:
Building 4 (combination 7,800 SF first floor retail and restaurant with second and
third floor residential condominiums with a fourth floor penthouse suite - 15
residential units) -work continues on the landscaping and lighting along the
building's Tuskawilla Road frontage and between Building 4 and Building 3.
• Building 17 (a 26 unit residential condominium) - An all-out effort is on to begin
closing on the units in Building 17 by October 1, 2008. Conditional site acceptance
was granted at the September 22, 2008 Commission meeting. Staff met with the
applicant on October 2, 2008 regarding a list of items that must be accomplished
October 27, 2008
Information Item 100
Page 3
before a Certificate of Occupancy can be issued for the building. These items
included fire sprinkler systems, building unit finals, main building infrastructure,
and the main stairway life safety code violation. A meeting with the stair
manufacturer is scheduled during the week of October 6, 2008.
(13) Town Center Phase II -Staff met with IBEW and Stn / 3`a Bank representatives on
August 28, 2008 to discuss a possible lot split and the location of a branch bank on a
parcel located along the north side of SR 434, just east of the McDonald's. Staff met
Atwell-Hicks Development Consultants representatives on September 24, 2008 to
discuss lot split, infrastructure, and site design issues associated with the proposed
bank. A lay-out sketch was provided to staff on October 3, 2008. This sketch and
cursory staff comments have been forwarded to Dover Kohl and Partners for further
review.
(14) Artesian Park (formerly Lincoln Park) -The applicant is working to finalize the
Development Agreement language for this project. The Development Agreement is
undergoing review by the City Attorney.
(19) Grandeville at Town Center (f/k/a Villa Grande &. Grandville) -Staff is working
with the applicant to finalize revisions to the permit plans and to finalize the address
assignments for the units. Apre-construction meeting and permit issuance should be
forthcoming in the next few weeks. Staff met with the applicant on September 29,
2008 to finalize the methodology for building valuation to be used in assessing the
appropriate building permit fees. The applicant reports renegotiating materials
prices (in light of recent price declines) in preparation for submitting for a
construction permit to do the site/civil construction and obtaining building
permits.
• (20) Wagner's Curve Office/Retail (Pinch A-Penny) -The aesthetic review and final
engineering/site plan were approved, subject to working out details, at the September
22, 2008 Commission meeting. The building plans are currently being reviewed for the
design professional. Staff is awaiting submittal of a draft development agreement.
• (21) HSP Office (1.6 acre Wagner's Curve Commercial site) - Staff is continuing to
work with the applicant on certain minor site layout modifications and the aesthetic
review for these buildings. Staff is working with the applicant to finalize the aesthetic
review and signage package submittals.
• (23) Talis Crossing Subdivision -The plat was approved, subject to the City Attorney'
review, at the August 25, 2008, Commission. Up-dated title work was provided to the
City Attorney on September 8, 2008. The plat was recorded on September 19, 2008.
• (25) Bart Phillips/419 Auto & Metal -On September 8, 2008, the Commission
adopted Ord. No. 2008-11, which provided a restricted C-2 zoning for the 2 parcels
containing approximately 9.04 acres along SR 434. Staff is working with the applicant
to clarify the land use actions and to get the Consent to Zoning Restrictions document
executed. Staff met with the applicant on October 7, 2008 to discuss staff's comments
October 27, 2008
Information Item 100
Page 4
on the aesthetic review, site plan, and Ginger Lane/Old Sanford Oviedo Road ROW
vacation request.
• (26) Starlight Baptist Church -Staff met with the applicant for September 18, 2008 to
discuss building construction phasing. The applicant met with the Building Official on
October 14, 2008 to discuss modifications to the building plans necessary to implement
the phasing plan.
(27) Hayes Road Plaza -The City Attorney reported to the Commission on September
8, 2008 that the owner had conveyed property for the turn lane at the corner of SR 434
and Hayes Road. Building permit application is currently under review. The plans
were resubmitted within a week. The building permit plans are nearing the end of
the review and are being prepared for issuance.
BOARD OF ADJUSTMENT:
On September 19, American Civil Engineering submitted a waiver request on behalf of
Renae Hamilton, to allow a reduced front building setback for a daycare on 0.49 acre
Lot 5 of the Excelsior Business Park from 25 feet to 15 feet. At its October 2, 2008, the
BOA unanimously recommended approval. The item was approved at the October 27,
2008 Commission meeting.
PLANNING NEWS:
The City of Winter Springs was mentioned by Phil Laurien, Executive Director of the
East Central Florida Regional Planning Council, as being a good example of Smart
Growth policies as related to the Town Center implementation and the recently
completed Evaluation and Appraisal Report (EAR). This reference was made at a
presentation Planning for the "Heartlands "recently conducted in Daytona Beach.
• Internationally renowned land planner and St. Andrews scholar uses the City of Winter
Springs in his presentations as an example of "some people get it right" when it comes
to traditional neighborhood/mixed use development.