REQUEST: Inform the Commission of Public Works intent to place flexible rubber sidewalks
on portions of Winter Springs Boulevard.
PURPOSE: The purpose of this Board item is to inform the Commission of Public Works
utilization of a product designed for use as flexible sidewalk where trees have
consistently buckled the concrete sidewalk.
CONSlDERA nONS:
The Public Works Department has spent considerable funds in the rehabilitation of the
roadway, underdrains and sidewalks on Winter Springs Boulevard. There are portions of
sidewalk on Winter Springs Boulevard, as well as other areas in the City, where tree roots
create challenges for repairs and replacement because of the nature of the tree growth and the
rigidity of concrete. The Public Works Department has researched and found a product
utilizing recycled tires that could be a valuable tool in addressing this maintenance issue that
we will be trying as a demonstration project. This will occur on Tuesday, October 14th from
1 0:30 to 12:00 near Tuscora Drive and Winter Springs Boulevard.
There is approximately 380 lineal feet of sidewalk between Tuscora and the Howell
Creek Bridge on the north side of the road where tree roots have heaved up the sidewalk. It is
our intent to utilize this product, "Flexi-Pave" in place of concrete. The cost of subcontracted
installed concrete sidewalk averages about $16.76 per lineal foot and the cost of the rubber
sidewalk is $23 .21 per lineal foot.
October 13, 2008
Informational Agenda Item 103
Page 2
FUNDING:
The funding for the installation of this product will be a part of the Winter Springs
Boulevard reconstruction project line code 115-65000-30020 at a total cost of$8,845.54. A
purchase order will be issued for this activity.
RECOMMENDATION:
It is recommended that Commission visit the site during the installation process and
see the product in an actual application.
IMPLEMENTATION SCHEDULE:
The Public Works Department will have the job completed by October 15, 2008.