October 28, 1991
r
Mr. Kipton Lockcuff, P.E.
Utility Director
winter Springs Water and Sewer
1 North Fairfax
Winter Springs, FL 32708
Re: Central Winds Park Reclaimed Water Connection
CPH Project No. W0421.00
Gentlemen:
After our meeting on Wednesday, October 23, 1991, you directed us
to prepare a sketch showing the eight inch reclaimed water line
connection from S.R. 434 back to the proposed pump location. This
was chosen as the best solution out of the alternatives discussed.
r"
We have enclosed three (3) copies of a marked up print showing the
reclaimed water line through the part as discussed.
The line consists of approx.lma~ely 1, 600 ~'liJjeal.' tee.t . of 8'~ PVC and
50 lineal feet restrained joint ductile ,iron pipe in' ,the casing.
It also includes three valves, two ~5 degree bends, and one 22-1/2
degree bend. The estimated construction'cost is $35,650.
~ . ,
Pressure testing of the line should meet the same criteria as the
water line. The City should check with CSX Railroad that nothing
further is required to slip the new line through the 16" casing.
We were informed by the contractor that the middle casing is the
16" casinq. By using restrained joint ductile iron pipe in the
line, there is very little clearance available in the pipe and
proper blocking should be used so that the pipe is not supported on
the joints alone.
If we can be ot further assistance, please call.