Loading...
HomeMy WebLinkAbout1991 10 28 Regular 19/28/91 16:39 Z 497 339 9639 t'.tll October 28, 1991 r Mr. Kipton Lockcuff, P.E. Utility Director winter Springs Water and Sewer 1 North Fairfax Winter Springs, FL 32708 Re: Central Winds Park Reclaimed Water Connection CPH Project No. W0421.00 Gentlemen: After our meeting on Wednesday, October 23, 1991, you directed us to prepare a sketch showing the eight inch reclaimed water line connection from S.R. 434 back to the proposed pump location. This was chosen as the best solution out of the alternatives discussed. r" We have enclosed three (3) copies of a marked up print showing the reclaimed water line through the part as discussed. The line consists of approx.lma~ely 1, 600 ~'liJjeal.' tee.t . of 8'~ PVC and 50 lineal feet restrained joint ductile ,iron pipe in' ,the casing. It also includes three valves, two ~5 degree bends, and one 22-1/2 degree bend. The estimated construction'cost is $35,650. ~ . , Pressure testing of the line should meet the same criteria as the water line. The City should check with CSX Railroad that nothing further is required to slip the new line through the 16" casing. We were informed by the contractor that the middle casing is the 16" casinq. By using restrained joint ductile iron pipe in the line, there is very little clearance available in the pipe and proper blocking should be used so that the pipe is not supported on the joints alone. If we can be ot further assistance, please call. Sincerely, ,/"""' PORTER AND HOLMES ENGINEERS, INC. TZ/tlb Enclosure 10281tr1.tlb -