Loading...
HomeMy WebLinkAbout1991 09 04 Bid Opening BID OPENING LIFT STATION ELECTRICAL CONTROL PANEL SEPTEMBER 4, 1991 The Bid Opening was called to order by Harry Martin, Finance Director. Present: Harry Martin, Finance Director Kip Lockcuff, Utilities Director Doug Taylor, Asst. Utility Director Four Bids were received as follows: First Bid opened was from Krieger Electric Inc., D.B.A. as New Electric Co., 1115 6th St. S.W., Winter Haven, FL 33880 in the amount of $5,490.00 Second Bid opened was from Hicks Electric, Inc., P.O. Box 160191, Altamonte Springs, FL 32716-0191, in the amount of $4,500.00. Third Bid opened was from Thompson Electric Co., P.O. Box 1478, Winter Park, FL 32790, in the amount of $6,800.00. Fourth Bid opened was from Electric Specialty, Inc., 1240 W. Landstreet Rd., Orlando, FL 32824, in the amount of $4,420.00. The Bids will be turned over to the Utilities Director for a recommendation to the City Manager. Bid Opening was closed 2:40 p. m. Mary T. Norton, City Clerk