HomeMy WebLinkAbout1989 10 09 Regular
October 4, 1989
TO: City Manager ~
FROM: Land Development coordinator~
RE: Agenda Item, Parcel 90
This is for approval/disapproval of Final Engineering for the above referenced.
The Staff Review was held on September 26, 1989.
Attached are the Staff Review Minutes, Department Head comments and a plat depicting
the project layout.
-,
DRL/gh
cc : Mayor
Commission
City Attorney w/o plat
City Clerk w/o plat
,,--
October 2, 1989
TO: City Manager
coordinato~
FROM: Land Development
RE: Parcel 90 Staff Review
The above referenced was held on September 26, 1989. G. Marvin and B. Austin
represented the project. Staff members present were Archer, Artman, Govoruhk,
Holzman, Hursh, Koch, Kozlov, LeBlanc and Taylor.
The developer is responsible for furnishing the Building ,Department with a copy
of the lighting plan when Florida Power designs it. He is also to furnish a
copy of the road cut approval which the County issued to the Police Department.
The Arbor Ordinance and permits were discussed.
Traffic and street signs will be installed by Public Works and the developer
will be billed for them.
~
There was discussion on the buffer between the project and Unit 6 - there will
be a 15' conservation and utility easement on the rear of those lots in Parcel
90.
~here was also discussion on the retention/detention'ponds in the middle of the
project. There will be a four (4) foot chain link fence around these. It was
suggested that either landscaping or green plaid vinyl be installed to provide
a visual buffer.
D~/~
cc: Staff
'J
\_-'
>~""*-
CITY OF WINTER SPRINGS, FLORIDA
1126 EAST STATE ROAD 434
WINTER SPRINGS, FLORIDA 32708
Telephone (407) 3.27-1800
September 19, 1989
Mr. Eddie L. Cox, P.E.
Fruland And Cox, Inc.
861 W. Morse Blvd., Suite 125
Winter Park, FL 32789
RE: Tuscawilla - Parcel 90, Perimeter Wall Design
Dear Mr. Cox:
On September 14, 1989, the City had received the revised' wind load calculations
and design specifications for the proposed perimeter wall of the above noted project.
After review of the submitted documentation all engineering was found to be satis-
factory.
If you have any further questions please contact this office.
,.......,
PH/gh
CCI City Manager
Land Development Coordinator
Building Department
Brian Austin, P.E.
l', '
PUBLIC WORKS DEPARTMENT
To: Land Developer Coordinator
From: G. E. Artman ~~~
Date: September 28, 1989
Subject: Parcel 90 Comments
=================================================================
--
Prior to our most recent staff review, same sUbJect, I conducted
a field inspectIon with Jim Martello and all aspects of the Arbor
Ordinance application were satisfied. He has not submItted this
document to the Building Department tor fInal approval at thIs
wr I t i ng .
During the staff review, I also discussed slgnage requirements
upon completion of infrastructure. It was also mentIoned that
the City requires a standard color coding scheme for all fire
hydrants. I also asked that the Developer coordInate all
underground utility installation at one time. This will preclude
undo stress on trees along rlght-af-way and possible damage to
sub-base and base of project streets.
cc: City ~anager
,
TO:
FROM:
DATE:
REF:
WIN T E R
S P R I N G S
POL ICE
D E PA R T MEN T
34-89
A review of Parcel 90 appears to meet standards as required by the Police Depart-
ment. However, as mentioned at Staff Review we have not been furnished with a
letter/permit or a copy of road plans for Tuscawilla as approved by Seminole
County Traffic.
JG/eds
$-
DON LEBLANC, LAND DEVELOPMENT COORDINATOR
John Govoruhk, Chief of Police
September 29, 1989
YOUR MEMO OF 27 SEPTEMBER 1989
W E
CARE AND
W E
S HOW
I T
MEMO:
9/27/89
TO:
LAND DEVELOPMENT COORDINATOR
BUILDING OFFICIAL ~
PARCEL 90 COMMENTS
FROM:
SUBJECT:
This Department is satisfied with the plan as presented. However, we
have not been furnished a copy of street lighting plan nor a copy of
transmittal showing it has been sent to Florida Power. Mr. Austin
assured me I would have this by early October.
~
,,"'-"
FIRE DEPARTMENT
102 NORTH MOSS ROAD
WINTER SPRINGS, FLORIDA 32708
TELEPHONE (305) 327-2332
FIRE AND
RESCUE
SERVICES
September 28, 1989
TO:
Land Development Coordinator
Fire Chief &',/
Staff Review - Parcel 90
FROM:
RE:
for
tomeH fire departments standards
The
phases to
place poles
determined
i :" .,' ).... ""'." ".
'.' ,,' i' ..~,. ",.' -:" . ,";, '. } .,/, .;., "", ""~'"
~() -D1?tli:?rdUritlg/deYeJ.bp~en't and cons truc t ion
hydrant..~B;re .,not damaged a.nd.that utilities do not
or"other.iobjectswithin six (6) Ifeet of them as
of the City Code .
-
~i"" '.
.;', ,~
/'-"
WINTER SPRIN GS WATER & SEWER
1 N. FAIRFAX AVENUE
WINTER SPRINGS. FLORIDA 32708
Telephone (305) 327-1641
October 3, 1989
MEMORANDUM
TO: Don LeBlanc
FROM: Doug Taylor ~~
RE: Tuscawilla Parcel 90
The water and sewer design meets the requirements of
Winter Springs Water & Sewer's specifications.
--
\
October 3, 1989
TO: Land Developnent Coordinator
SUBJECT: Tuscawilla Parcel 90 Final Engineering
The engineering plans and the landscaping and wall plans received August 1 for
this developnent include all the buffers requested at prior meetings except one
item, and this also now is resolved as described below.
There will be a six foot brick wall all along Tuscawilla Road and along the
rear lines of the end lots north and south to buffer against traffic view,
sound, and lights. The one road accessing Tuscawilla Road will have entry
feature walls and extensive landscaping. Trees and shrubs will also line the
right-of-way outside the perimeter wall.
-
On the eastern boundary adjacent to Unit 6 a 15 foot conservation easement will
be platted along the rear lines of the Parcel 90 lots. This natural area is
intended to be left undisturbed. To accomplish this, as the Deed Restrictions
should include a section prohibiting any vegetation removal other than minor
hand clearing in this easement.
Retention J;XJnds are enclosed by five foot chain link fence. To make this less
obtrusive, fence along the internal roadway is shown to be green Vinyl-clad.
It was suggested to the developer that it would be preferable to use the green
vinyl-clad fencing also around the J;XJnds where they are visible to the rear and
side of lots and to plant shrubbery around the fences where they are close in
to building lots. Al though the plans do no indicate so, the developer now has
agreed to include these improvements to the appearance of the chain link
fencing.
2-
Jacqueline Koch
Director of Administrative Services/
Canprehensi ve Plarming
.p-'
October 4, 1989
TO:
City Manager .
Land Development coordinator~
FROM:
RE:
Agenda Item, Tuscawilla Country Club Lighting Plan for Parking Lot
This is for approval/disapproval of the above referenced. The Final Engineering for
this project was approved by the Commission on November 28, 1989 with the stipulation
that a Certificate of Occupancy not be issued until a lighting plan for the parking
lot be approved by the Commission
Attached is the lighting plan and comments from the Building Official.
-
DRL/gh
cc: Mayor
Commission
City Attorney
City Clerk
-
--'"
MEMO:
9/26/89
TO:
FROM:
SUBJECT:
LAND DEVELOPMENT C~R
BUILDING OFFICIAL ----
LIGHTS FOR COUNTRY CLUB BUILDING
The latest reV1Slon (9/20/89) to the lighting plan for the Tuscawilla
Country Club parking lot has been reviewed and is considered more than
adequate. It consists of 12 lights on six (6) poles, 35 ft. high.
This should be scheduled for approval by the City Commission at the
earliest date so installation can be scheduled.
,-