November 13, 1987
em Of WINTER SPRUiG<&
IEIIWIAGER
TO:
City Manager
Ci ty Engineer-r--
Corrected Estimated Costs for Road Construction in the Ranchlands
FROM:
SUBJECT:
Due to an oversight Stoner Road was not included in the road construction
cost estimate for the Ranchlands as presented in the memo dated October 14,
1987.
The following represent an adjustment to the costs which includes Stoner
Road between Hayes and Shore Road.
ROAD CONSTRUCTION
.-..
12" SUb Base
6" Soil Cement Base
Asphaltic Concrete
2 ft. Miami CUrb
Earthwork (CUt & Fill)
22,427.50
563,180.70
349,77.50
300,437.50
515,832.50
STONER ROAD
1,012.50
25,425.00
16,875.00
9,618.75
23,287.50
TOTAL
-
23,440.00
588,605.70
366,652.50
310,056.25
539,120.00
TOTAL
1,751,655.70
76,218.75
1,827,874.45
DRAINAGE
Stormwater Inlet Basins 172,550.00
Piping (15 inch RCP)
(An estimate of 65% of
total road length) 495,652.00
8,700.00
18,125.00
22,376.25
518,028.25
TOTAL
!599,278.25
COST OF LAND ACQUISITION
(Retention/Detention Ponds)
200,000.00
TOTAL
89~_, 278 . ~~
St!RVEJING COST
Sub Total
25,000.00
2 , 752 J..~?.:30
-
ENGINEERING
(5% of 2,752,152.70)
137,607.64
-
MEMO
City Manager
November 13, 1987
Page 2
TOTAL ESTIMATED COST
2,889,760.34
Estimated Cost per Lineal Foot
2,889,760.34 - 46880 LF = $61.64 LF
NOTE: Property owners on each side of the right-of-way would pay half of this
cost or $30.82 or $31.00 LF.
Imh
cc: Finance Director .
Director of Public Works
Land Developnent Coordinator
-
.-
-
-
-.
z
~~~~rrwrr~
NOV 1987
November 13, 1987
CIlY. of WINTER SPRINGS
CITY MANAGER
TO:
City Manager
City Engineer ~
Estimated Costs for Road Construction for Selected Roads (Southern
Section) in the Ranchlands
- ---.
FROM:
SUBJECT :
An evaluation has been made of determining estimated costs to construct
the following roads in the Ranchlands: Fisher Road (Panama to the City Limits) ,
Williams Road (Morton Lane to Fisher Road), Morton Lane, Sunrise Road (Trade
Winds Road to Williams Road) and Herrell Road (Morton Lane to Sunrise Avenue).
Most of the streets in the Ranchlands have fifty (50) foot right-of-ways.
According to Section 14-126 Land Developnent Code, these streets with these
right-of-way widths would require curb (miami curb) and gutter. The roads that
have right-of-ways of at least 60 ft., rural type roads could be built with
swales. Bear in mind swales can be used in the 60 ft. right-of-way provided
the flow of storrrwater in these swales do not exceed 2 fps; otherwise, curb and
gutter will be required as per Section 14-123 Land Development Code.
'Therefore, the cost estimate for the road construction will be based on the
conformance to the Land Developnent Code.
The following are the cost estimates for road construction for the
selected roads in the Ranchlands as previously designated.
ROAD CONSTRUCTION
12" SUb Base
6" Soil Cement Base
Asphaltic Concrete
2 ft. Miami CUrb
Earth WOrk (cut & fill)
7,700.00
193,354.30
104,317.50
103,170.00
177,100.00
TOTAL
585,641.80
DRAINAGE
Storrrwater Inlet Basins 59,450.00
Piping (15 inch RCP)
(An Estimate of 65% of
total road length)
(15400 x 65% x $17/lf) 170,170.00
Cost of Land Acquisition
(Retention/Detention Ponds) 100,000.00
TOTAL
~29, l?_2~00
Memo
City Manager
"""-~ November 13, 1987
Page 2
Surveying Cost
SUb Total
ENGINEERING
(5% of 925,261.80)
TOTAL ESTIMATED COST
ESTIMATED COST PER
LINEAL FOOT
911,524.89 ~ 15,400 ft. =
10,000.00
925,261.80
46,263.09
971,524.89
63.09 L.F.
NOTE: Property owners on ~ch side of the right-of-way would have to pay half
this cost or ~31.54 L.F.
.-,
Imh
cc: Finance Director
Director of Public Works
Land Developnent Coordinator
~
--. ~.. ~ -
c.oMA.{
,-.,
October 14, 1981
TO:
Ci ty Manager 71/ ~
City Engineer )(:V
Estimated Costs for Road Construction in the Ranchlands
FROM:
SUBJECT :
Due to recent concerns by various citizens in the Ranchlands to have their
,-. roads paved, a review of estimated costs have been developed for providing the
paving drainage, surveying and engineering costs.
Most of the streets in the Ranchlands have fifty (50) foot right-of-ways.
According to Section 14-126 Land Developnent Code, those streets with these
right-of-way width would require curb (miami curb) and gutter. The roads that
have right-of-ways of at least 60 ft., rural type roads could be built with
swales. Bear in mind swales can be used in the 60 ft. right-of-way provided
the flow of stormwater in these swales do not exceed 2 fps; othel'Wise, curb and
gutter will be required as per Section 14-123 Land Development Code.
Therefore, the cost estimate for the road construction will be based on the
conformance to the Land Developnent Code.
The following are the cost estimates for road construction of the
Ranchlands
ROAD CONSTRUCTION
12" SUb Base
22,421.50
~~t~o\\~\t'
\)\ OC\ 14 \9~1
'I'Ri ~GS
'J~ \\,\ \r.. i\ ~
C\1'< 0' l'A1\1'lI\G€.\<
crt'l
6" Soil Cement Base
563,180.10
Asphaltic Concrete
349,111.50
,-.,
2 ft. Miami CUrb
300,431.50
Earth Work (CUt &: Fill)
515,832.50
TOTAL
1,151,655.10
. . .
,-.
Memo
Ci ty Manager
Page 2
DRAINAGE
Stormwater Inlet Basins 172,550.00
Piping (15 inch RCP; 495,652.00
(An Estimate of 65% of
total road length )
Cost of Land Acquisition 200,000.00
(Retention/Detention Ponds)
TOTAL 868,202.00
SUrveying Cost 25,000.00
SUb Total
$2,644,857.70
Engineering
(5% of $2,644,857.70)
132,242.89
.-
TOTAL COST
$2,777,100.59
Estimated Cost per Lineal Foot
.
$2,777,100.59 t 44855 ft. = $61.91 LF.
or $62.00 LF.
Note: Property owners on each side of the right-of-way would pay half this
cost or $31.00 LF.
/mh
cc:
Finance Director
Director of Public WOrks
Land Developnent Coordinator
.-
~(?~~~t'
,t~~...
, \D, \~~1
0(,\ 1.'
,,\ ;:;t~\~r;"S
\',\\'1 0\ \~\'~~;~!\GtR
c\i'(
,'-""
.;;..,,'---
>>
'~'4~~
~~"
--"
, .
. .
I"
I, ., ,..-~.
[. C ,'rotH'
l'J 1:>"-
,~
I .
~"~~""
\ (,?s).
o ~.~
~J ~W
· ,._t ~i
S
~~'1
~~.~
I-...J~
~y~.
~ ~1~~
..... ~-...J~
~.~
'>:.~/
J.~'~::::y
~~\l.\.
r
I I
.
....'"
POULTRY
..,L,II
. .
......... ......... ... ....... :
,-....