Loading...
HomeMy WebLinkAbout1987 11 16 Workshop 3 fD)~. re~: P~''l ~ rm fJ)~""?" '. :,~s., @ NOV 16 1987 - November 13, 1987 em Of WINTER SPRUiG<& IEIIWIAGER TO: City Manager Ci ty Engineer-r-- Corrected Estimated Costs for Road Construction in the Ranchlands FROM: SUBJECT: Due to an oversight Stoner Road was not included in the road construction cost estimate for the Ranchlands as presented in the memo dated October 14, 1987. The following represent an adjustment to the costs which includes Stoner Road between Hayes and Shore Road. ROAD CONSTRUCTION .-.. 12" SUb Base 6" Soil Cement Base Asphaltic Concrete 2 ft. Miami CUrb Earthwork (CUt & Fill) 22,427.50 563,180.70 349,77.50 300,437.50 515,832.50 STONER ROAD 1,012.50 25,425.00 16,875.00 9,618.75 23,287.50 TOTAL - 23,440.00 588,605.70 366,652.50 310,056.25 539,120.00 TOTAL 1,751,655.70 76,218.75 1,827,874.45 DRAINAGE Stormwater Inlet Basins 172,550.00 Piping (15 inch RCP) (An estimate of 65% of total road length) 495,652.00 8,700.00 18,125.00 22,376.25 518,028.25 TOTAL !599,278.25 COST OF LAND ACQUISITION (Retention/Detention Ponds) 200,000.00 TOTAL 89~_, 278 . ~~ St!RVEJING COST Sub Total 25,000.00 2 , 752 J..~?.:30 - ENGINEERING (5% of 2,752,152.70) 137,607.64 - MEMO City Manager November 13, 1987 Page 2 TOTAL ESTIMATED COST 2,889,760.34 Estimated Cost per Lineal Foot 2,889,760.34 - 46880 LF = $61.64 LF NOTE: Property owners on each side of the right-of-way would pay half of this cost or $30.82 or $31.00 LF. Imh cc: Finance Director . Director of Public Works Land Developnent Coordinator - .- - - -. z ~~~~rrwrr~ NOV 1987 November 13, 1987 CIlY. of WINTER SPRINGS CITY MANAGER TO: City Manager City Engineer ~ Estimated Costs for Road Construction for Selected Roads (Southern Section) in the Ranchlands - ---. FROM: SUBJECT : An evaluation has been made of determining estimated costs to construct the following roads in the Ranchlands: Fisher Road (Panama to the City Limits) , Williams Road (Morton Lane to Fisher Road), Morton Lane, Sunrise Road (Trade Winds Road to Williams Road) and Herrell Road (Morton Lane to Sunrise Avenue). Most of the streets in the Ranchlands have fifty (50) foot right-of-ways. According to Section 14-126 Land Developnent Code, these streets with these right-of-way widths would require curb (miami curb) and gutter. The roads that have right-of-ways of at least 60 ft., rural type roads could be built with swales. Bear in mind swales can be used in the 60 ft. right-of-way provided the flow of storrrwater in these swales do not exceed 2 fps; otherwise, curb and gutter will be required as per Section 14-123 Land Development Code. 'Therefore, the cost estimate for the road construction will be based on the conformance to the Land Developnent Code. The following are the cost estimates for road construction for the selected roads in the Ranchlands as previously designated. ROAD CONSTRUCTION 12" SUb Base 6" Soil Cement Base Asphaltic Concrete 2 ft. Miami CUrb Earth WOrk (cut & fill) 7,700.00 193,354.30 104,317.50 103,170.00 177,100.00 TOTAL 585,641.80 DRAINAGE Storrrwater Inlet Basins 59,450.00 Piping (15 inch RCP) (An Estimate of 65% of total road length) (15400 x 65% x $17/lf) 170,170.00 Cost of Land Acquisition (Retention/Detention Ponds) 100,000.00 TOTAL ~29, l?_2~00 Memo City Manager """-~ November 13, 1987 Page 2 Surveying Cost SUb Total ENGINEERING (5% of 925,261.80) TOTAL ESTIMATED COST ESTIMATED COST PER LINEAL FOOT 911,524.89 ~ 15,400 ft. = 10,000.00 925,261.80 46,263.09 971,524.89 63.09 L.F. NOTE: Property owners on ~ch side of the right-of-way would have to pay half this cost or ~31.54 L.F. .-, Imh cc: Finance Director Director of Public Works Land Developnent Coordinator ~ --. ~.. ~ - c.oMA.{ ,-., October 14, 1981 TO: Ci ty Manager 71/ ~ City Engineer )(:V Estimated Costs for Road Construction in the Ranchlands FROM: SUBJECT : Due to recent concerns by various citizens in the Ranchlands to have their ,-. roads paved, a review of estimated costs have been developed for providing the paving drainage, surveying and engineering costs. Most of the streets in the Ranchlands have fifty (50) foot right-of-ways. According to Section 14-126 Land Developnent Code, those streets with these right-of-way width would require curb (miami curb) and gutter. The roads that have right-of-ways of at least 60 ft., rural type roads could be built with swales. Bear in mind swales can be used in the 60 ft. right-of-way provided the flow of stormwater in these swales do not exceed 2 fps; othel'Wise, curb and gutter will be required as per Section 14-123 Land Development Code. Therefore, the cost estimate for the road construction will be based on the conformance to the Land Developnent Code. The following are the cost estimates for road construction of the Ranchlands ROAD CONSTRUCTION 12" SUb Base 22,421.50 ~~t~o\\~\t' \)\ OC\ 14 \9~1 'I'Ri ~GS 'J~ \\,\ \r.. i\ ~ C\1'< 0' l'A1\1'lI\G€.\< crt'l 6" Soil Cement Base 563,180.10 Asphaltic Concrete 349,111.50 ,-., 2 ft. Miami CUrb 300,431.50 Earth Work (CUt &: Fill) 515,832.50 TOTAL 1,151,655.10 . . . ,-. Memo Ci ty Manager Page 2 DRAINAGE Stormwater Inlet Basins 172,550.00 Piping (15 inch RCP; 495,652.00 (An Estimate of 65% of total road length ) Cost of Land Acquisition 200,000.00 (Retention/Detention Ponds) TOTAL 868,202.00 SUrveying Cost 25,000.00 SUb Total $2,644,857.70 Engineering (5% of $2,644,857.70) 132,242.89 .- TOTAL COST $2,777,100.59 Estimated Cost per Lineal Foot . $2,777,100.59 t 44855 ft. = $61.91 LF. or $62.00 LF. Note: Property owners on each side of the right-of-way would pay half this cost or $31.00 LF. /mh cc: Finance Director Director of Public WOrks Land Developnent Coordinator .- ~(?~~~t' ,t~~... , \D, \~~1 0(,\ 1.' ,,\ ;:;t~\~r;"S \',\\'1 0\ \~\'~~;~!\GtR c\i'( ,'-"" .;;..,,'--- >> '~'4~~ ~~" --" , . . . I" I, ., ,..-~. [. C ,'rotH' l'J 1:>"- ,~ I . ~"~~"" \ (,?s). o ~.~ ~J ~W · ,._t ~i S ~~'1 ~~.~ I-...J~ ~y~. ~ ~1~~ ..... ~-...J~ ~.~ '>:.~/ J.~'~::::y ~~\l.\. r I I . ....'" POULTRY ..,L,II . . ......... ......... ... ....... : ,-....