HomeMy WebLinkAbout2009 08 10 Informational 102 Restoration of City Waterways at Five Locations Damaged during Tropical Storm FayCOMMISSION AGENDA
ITEM 102
CONSENT
INFORMATIONAL X
PUBLIC HEARING
REGULAR
MGR ~ /DEPT '
Au ust 10 2009 e~ i~
g
Meeting A thorization
REQUEST: Public Works Department informing the City Commission about the recently
completed restoration of City waterways at five locations damaged during
Tropical Storm Fay
PURPOSE: The purpose of this agenda item is to inform the City Commission about the
recently completed restoration of City waterways at five locations damaged
during Tropical Storm Fay
PROJECT SUMMARY:
• At the January 12, 2009 City Commission meeting, the Commission provided authorization
to enter into a Project Agreement with the Natural Resources Conservation Service
(MRCS) for the restoration of City waterways at five locations damaged during Tropical
Storm Fay. Federal funding was approved at a 75 percent construction cost share rate
(75% NRCS / 25% City).
• Construction contracts were approved by the City Commission on March 23, 2009 and all
construction work was complete by July 24, 2009.
• The construction work generally consisted of debris clearing, sediment removal, and creek
bank stabilization at five major creek crossings. The work was complicated by severe
storms that hit Winter Springs during late May which caused the water levels in the creeks
to rise well above normal levels for the time of year.
• The following before and after photos illustrate the work performed at each site.
August 10, 2009
Agenda Item #102
Page 2 of 7
Bear Creek at Winter Snrin~s Boulevard -repair erosion at north bridge
abutments; remove sediment islands and storm debris; fill scour holes
~,•~~'~'
x~
~~
--~
August 10, 2009
Agenda Item #102
Page 3 of 7
Howell Creek at Northern Way (south bride) -remove sediment islands and
storm debris; fill scour holes
August 10, 2009
Agenda Item #102
Page 4 of 7
No Name Creek at Power Easement -remove sediment islands and storm
debris; replace existing dual-culvert crossing; install new concrete headwalls
August 10, 2009
Agenda Item #102
Page 5 of 7
Gee Creek at Moss Road -remove sediment islands and repair erosion damage
at four bridge corners
August 10, 2009
Agenda Item #102
Page 6 of 7
Gee Creek at S. Edsemon Avenue -remove sediment islands and repair erosion
damage at southeast bridge corner
~,~""'~
~~:~.
.~ ~ `~..:
4~7~ ~~.
August 10, 2009
Agenda Item #102
Page 7 of 7
PROJECT COST SUMMARY:
The total cost of the project at completion including design, permitting, and construction
was $239,578.69, broken down as follows:
Phase
Cost Funding Source
NRCS City
Design $30,000 $24,943.43 $5,056.57
Permitting $10,031.25 $0 $10,031.25
Construction $199,547.42 $149,660.57 $49,886.85
Total $239,578.67 $174,604.00 $64,974.67
The City's share of the project was funded by the Stormwater Utility Fund.
FUNDING:
None
RECOMMENDATION: