Loading...
HomeMy WebLinkAbout1981 05 28 Bid Opening BID OPENING, May 28, 1981 - 2:30 p.m. l2.5 KW LP Gas Engine Driven Stand By Electric Generating System - Present: Richard Rozansky, City Manager Charles L. Holzman, Eir~ Chief Jan Braddock, Secretary to City Manager .' -John T. Mapel .' . )~ary T. Nort~n.~",C~ty Clerk . ~ '. The bid opening was called to order by City Manager Richard Rozansky at 2:38 p. m. One bid was received from John T. Mapel Co. as follows: Proposal for complete installation of a 12.5 KW LP gas engine driven stand by electric generation system, as per specifications issued by the City of 'Winter Springs. This installation is to include 1 ONAN 12.5 RJC-3CR, 120/240 10 LP generator set and all accessories as specified and all labor and materials required for a complete installation with init!al start-up by a factory engineer.* Not included is the fuel storage tank and associated piping to the set but this could be included as an alternate. ; Total for this proposal $15,690.00. .'-'" *This proposal includes weatherproof enclosure not specified but required. Generator set as specified with enclosure $10,850.00. Labor and materials to install $4840.00. The bid was turned over to the Fire Chief who will make a recommendation to the City Manager. The City Manager will make a recommendation to City Council at the June 23, 1981 Council Meeting. Mary T. Norton, City Clerk .-..