HomeMy WebLinkAbout1981 05 28 Bid Opening
BID OPENING, May 28, 1981 - 2:30 p.m.
l2.5 KW LP Gas Engine Driven Stand By Electric Generating System
-
Present:
Richard Rozansky, City Manager
Charles L. Holzman, Eir~ Chief
Jan Braddock, Secretary to City Manager
.' -John T. Mapel .'
. )~ary T. Nort~n.~",C~ty Clerk
. ~ '.
The bid opening was called to order by City Manager Richard Rozansky at 2:38 p. m.
One bid was received from John T. Mapel Co. as follows:
Proposal for complete installation of a 12.5 KW LP gas engine driven
stand by electric generation system, as per specifications issued by
the City of 'Winter Springs.
This installation is to include 1 ONAN 12.5 RJC-3CR, 120/240 10 LP
generator set and all accessories as specified and all labor and
materials required for a complete installation with init!al start-up
by a factory engineer.*
Not included is the fuel storage tank and associated piping to the
set but this could be included as an alternate.
;
Total for this proposal $15,690.00.
.'-'"
*This proposal includes weatherproof enclosure not specified but required.
Generator set as specified with enclosure $10,850.00.
Labor and materials to install $4840.00.
The bid was turned over to the Fire Chief who will make a recommendation to the
City Manager. The City Manager will make a recommendation to City Council at the
June 23, 1981 Council Meeting.
Mary T. Norton,
City Clerk
.-..