Loading...
HomeMy WebLinkAbout1990 11 14 Special . . . November 26. 1990 TO: Land Development Coordinator FROM: City Engineer ,,((~ SUBJECT: Error in the typed Minutes of the P & Z Special Workshop dated November 14. 1990 On page 2. third paragraph. there is an error regarding the information provided the Board on the 100 year flood zone. Mr. McLeod inquired about the issue of the 100 year flood elevation that was not provided on the preliminary engineering. As the City Engineer. I told Mr. McLeod that there was only a note on the engineering stating the project was not in the flood zone. He was told that the Code requires that the distance and location of the 100 year flood elevation be provided. which the engineer-of-record did not do. Mr. McLeod was told that the preliminary engineering did not meet the City Code. Mr. McLeod asked Mr. Chancellor why this information was not provided. and Mr. Chancellor mentioned a surveyor would be needed to determine this information. I told Mr. McLeod that all the engineer-of-record (Mr. McBriarty) would need would be to use a FEMA map; measure the information off this map and place it on the preliminary engineering. Mr. McLeod told Mr. Chancellor that it was his responsibility to provide that information. The preceding is a representation of events regarding the 100 year flood plain issue. ffg cc: Asst. City Clerk