The meeting was called to order by City Plarmer, Peter Cowell at 9:00 a.m.
PRESENT :
Steve Marquart, Dyer, Riddle, Mills & Precourt
Lucius Custnnan, Dyer, Riddle, Mills & Precourt
Robert D. Wisor, Plazmer-Van Horn & Wisor, Inc.
Dave Walker, Rick Swisher Architect
Rick Swisher, Rick Swisher Architect
Walt Freeman, Landscape Architect
Father Jom Bluett, Paster
STAFF PRESENT:
Peter Cowell, City Plazmer
Gil Artman, Director of Public Works
Len Kozlov, City Engineer
Jom Govorubk, Police Chief
Tim Lallathin, Assistant Fire Chief
Robert Raeder, Building Inspector
ST. STEPHENS CATHOLIC CHURCH:
Peter Cowell stated that the project is to be constructed into two phases. No line
on the plans showing sher Phase I and Phase II are. The Administration Classroom
Building designated as future, is that all to be future or is part of the parking
lot to be future or sane combination thereof?
Father Bluett stated what is going to happen as he sees it, and he thinks in the
next 10-15 years, have an office outside behind the church.
Rick Swis~r stated that Phase I will be developed carpletely now. It will include
part of the administration offices. The balance of the Administration Building and
Stmday School Classroans will be done in Phase II as well as the development of the
courtyards within that space. All of the site development including the site identi-
fication sign will be done in Phase I.
Peter Cowell stated that he does not have dimensions or floor area ratios for any of
the buildings. He doesn't have a preliminary landscape plan. He needs the square
footage of the building. When the square footage for the administration and class-
room buildings are detennined, the additional parking requireIIEI1ts for these buildings
will also need to be canplied with. If Mr. Swisher and Mr. Wisor can address these
issues to staff's satisfaction, the project will be recannended to the Planning and
Zoning Board. Tuscawilla Unit 6 ahutts the property and it is not shown where the
existing residential dwellings in Unit 6 are in relationship to the project. Sideyard
setbacks of 10' and that the two houses that ahutts the cul-de-sac on Gazell Trail are
very close to that. There is no architectural review and approval for the administra-
tion building. Rick Swisher stated that they are doing the skenatic and design
development.
Peter Cowell stated that IWS disposes of the solid waste and refuse for the City.
There is a concrete ~ster pad indicated that is not enclosed or gated. It will
need to be constructed along with Phase I. It may need to be relocated with Phase
II. Center identification sign needs an ARB approval. All of this can be approved
as one package or individually. The Engingeering will be required on this as well.
The Staff has not seen the Cotmty penni.tfor the road cuts. Rick Swisher stated that
they su1:Jnitted plans to the County for approval in order to put the trailer on the
site and before they could get the pennit, they had to have the curb cuts approved
by the Colmty or they could not get the penni ts .
Peter Cowell asked Tim Lallathin how high can we presently protect in a fire situ-
ation? 'lhe building is going to be built to a height of 60'. Tim Lallathin stated
that we have fire streams that can reach 60', but we don't have ladder capacity to
reach 60'. We have ladder capacity to reach 35'. Tim Lallathin also stated that
Staff Review Meeting Minutes
December 24, 1985
Page 2
in a staff meeting at the Fire Depart:m:mt, they discussed the height and have no
problem with the height. The only problem he sees is the fire hydrant not being
looped.
Rick Swisher stated that there will be a sprinkler system in the buildings.
Jom Govoruhk, stated that he has talked with the Country Traffic Engineering,
and they do have authorization for the two driveways caning and going. The pennit
for the two driveways has been issued by the Cotmty. He also stated that they need
to get together 0Il the arrow for the turn lane before you get onto Tuscawilla Road
for the final engineering. Also get with Florida Power Corporation and submit a
plan on the lighting system; and for final approval the final site plan lighting is
required.
Gil Artman stated that the City now has an Arbor Ordinance.
Peter Cowell stated that the streets will be limerock instead of soil cement. Gil
Artman stated that is is still up in the air as to what area is more applicable in
maintaining the roads.
Peter Cowell stated the only other concern is that this is the tallest building in
the City; and from the pla:nn.ing standpoint, he Carnlot recarmend on this. It would
be for the Ccmnission to decide. Even with the architectural approval, he said, he
thinks that the building is still too high. In a C-2 zone the maximum height is 50'.
It seemed the Staff and ARB believed the intent was for a steeple instead of a roof
line; therefore, when it canes time for the final develo'fXIleIlt plan, we will request
a full architectural, as well, so that the Ccmnission can see exactly what the
structure is going to look like before making a decision.
Rick Swisher stated that they would like the flexibility of 1:>eing able to IIDve the
church forward 20'. There is a large group of trees in the front that they would
like to save if they are given approval by the Carmission.. The flexibility would
also be given at this time.
Peter Cowell stated that he will need five copies of this with the doC1.lITeIltations
that have been asked for to be submitted, so that he can get the packages ready for
the Planning and Zoning Board Meeting on January 8, 1986. The last day to submit
these plans is January 2, 1986.
Respectfully submitted,