Loading...
HomeMy WebLinkAbout1985 04 04 Site Plan Review Board Meeting Minutes SITE PLAN REVIEW BOARD MINUTES Thursday, April 4, 1985 The Site Plan Review Board convened at 9:00 a.m. PRESENT: Department Heads: Sam Smith, Doug Taylor, John Govoruhk, Charles Holzman Chuck Hassler and Peter Cowell Applicant: Marta Garam GARAM OFFICE COMPLEX Mrs. Marta Garam has requested a Site Plan Review. The proposal is for a small office, residentially styled, complex on SR 434 at South Fairfax Avenue. Chief Govoruhk questioned the width of the entrance curb on SR 434. The developer will redraw the entrance at 14 feet with the appropriate 25 foot radius for ingress only. The egress will be on Fairfax. Wheel stops were also discussed and will be located 2 feet inside the 10 x 20 foot parking spaces that will be striped in white per DOT standards. Between the present market site and the proposed new building there will be a curb and a 4 foot hedge to stop utilization of the existing curb cut from the new building to SR 434. DOT must approve the drainage for storm water retention. The City Engineer will require a perk test be done for the exfiltration storm drainage system. Landscaping is excellent, however, a detail of the site where the palm and the sidewalk meet must be enlarged and a 5 foot sidewalk must be preserved. Concerns of the Building Official, not previously discussed, are the lights providing illumination for the parking lot. This is to be discussed with Florida Power. A second concern is the wall separating residential and commercial areas. To compensate the wall will run parallel with the building across the back and then extend across the lot up to the back wall of the building. The dumpster will also be enclosed with a wooden fence and a gate on the west side. Winter Springs Water & Sewer is waiting to put this on line with a 1,000 GPD agreement tenatively consumated. The utility needs to determine where the lines for water and sewer run from the adjacent property to the manhole on Fairfax Avenue. The appropriate linkage system and development tests will be done shortly. SITE PLAN REVIEW BOARD MINUTES Thursday, April 4, 1985 Page 2 The City Planner asked that the handicapped ramp be redesigned allowing for a wider space and a lesser slope to the ramp, and also that DCCR's are to be developed to ensure maintenance of the landscape, signage and parking. The center identification sign will be brought back as a separate item for a Site Plan Review Board to discuss at a later date and time. Motion to approve the Garam office complex was made by Mr. Cowell and seconded by Mr. Hassler. Vote: all aye Respectfully submitted JJa4 ~ d&M~ Dale Barnett