SITE PLAN REVIEW BOARD
MINUTES
Thursday, December 6, 1984
The Site Plan Review Board convened at 10:00 a.m.
PRESENT:
Department Heads: Peter Cowell, Chuck Holzman, Chuck Hassler, and Doug
Taylor for WSWS
Developer: Dick Hillebrand, along with J. R. Ball, Civil Engineer; Ken
McIntosh, Attorney; Harvey Jacoby, Architect; and Bill Wilson
ASHLEY SQUARE
After examination of the issues through out the project, it was approved
unanimbusly with the following conditions:
1. Two additional hydrants will be added to the site at points prescribed
in the drawing.
2. A berm and wall will be maintained at 6 feet along Lake Talmo Drive.
3. A 2 inch pipe will be used for sanitary water throughout the project unless
other wise indicated.
4. A flow test will be required to insure 60 lbs. pressure on the line. The
Fire Department will assist with the test, coordination will be between
the Building Official and the Fire Marshal.
5. The DER and the St. Johns Water Management District will have to approve
the drainage of storm water into Lake Talmo.
6. An electrical schematic will have to be shown to the Building Official
upon his return.
All of these issues are predicated upon the project being able to be brought
on line for capacity for sewage disposal and the ability to take back the
effluent. To this extent it will be a decision of the City Commission and the
City Manager and Attorney to settle this agreement.
Presently as no CO's can be pulled for building, Mr. Jacoby wanted to know
if he could begin to clear the land. As the Building Department was not
present this issue would be taken up with the City Manager.
Presently the pond proposed by the developer will go before the City Commission
for public hearing on December 11, 1984 and the Board of Adjustment on January
3, 1985.
The developer was assured of receiving any assistance the City could give.