HomeMy WebLinkAbout1984 11 09 Site Plan Review Board Meeting Minutes
SITE PLAN REVIEW BOARD
MINUTES
Friday, November 9, 1984
The Site Plan Review Board convened at 9:00 a.m. to consider the
site plan for Project Engineering/Funeral Home.
PRESENT:
Department Heads: Sam Smith, Peter Cowell, Chuck Hassler, John Govoruhk,
Chuck Holzman
Developers: Gerald McCall and Don Pflueger
PROJECT ENGINEERING/FUNERAL HOME
The funeral home proposed by Project Engineering was reviewed this morning
and approved subject to the following conditions:
1. The Health Department and DER will have to send letters of approval
for the crematory and the septic tanks.
2. The pump for the well must be relocated 100 feet or more away from
the building.
3. The parking lot will be redesigned to allow for a cul-de-sac at the
end and be paved in turf block rather than mulch to leave natural
areas as much as possible.
4. An enclosed dumpster will be added to the site.
5. Street and parking lights will also be added to the design.
6. Presently there is no water for a fire hydrant. This will have to be
developed before the final site review.
7. Due to all the driveways, the nursery, the funeral home and the new
City Hall, DOT will need to specify road design for this area. Ingress,
egress, islands, lights, and/or a slowing of the speed limit are all
areas of concern. Chief Govoruhk should have this resolved Monday or
Tuesday of next week.
Vote: Hassler, aye; Holzman, aye; Govoruhk, aye; Cowell, aye; Smith, nay.
Motion carries.