HomeMy WebLinkAbout1982 02 09 Site Plan Review Board Meeting Minutes
TELEPHONE
(305) 327-1800
WINTER SPRINGS, FLORIDA
ZIP CODE 32708
Minutes of Site Plan Review Board
February 9, 1982
The City Planner called the meeting to order. Present were: Charles Holzman,
Ron Emery, John Govoruhk, Ray Bradshaw, Jack Cooper, Jacqueline Koch, and
Richard Rozansky.
BELGIAN WAFFLE BAKERY AT 10 SHERRY AVENUE - DETERMINATION OF BOARD REQUIREMENTS.
Mr. Larry Johnston, property owner, and Mr. Claude De Leu, bakery operator,
were present to speak on the Board's determination of the requirements regarding
the Belgian Waffle Bakery at 10 Sherry Avenue. The City Planner stated the
bakery was approved at this location by the Board of Adjustment on February 4,
1982. She stated there has been no formal site plan submitted. Mr. Johnston
stated they have no plans at this time to make any changes to the site or the
building. The Planner stated one condition in C-l parking is that it cannot be
within the front setback. The setback on that property is 25 feet so the appli-
cant cannot use the front yard for parking. Ms. Koch asked how many cars could
park in the driveway. Mr. Johnston stated two. Mr. De Leu stated the majority
of the business will be comprised of him delivering the waffles to the stores
himself. He will be using his own car for deliveries, and will park it beyond
the driveway alongside the house, so the two spaces in the driveway would
always be available to customers. The Planner asked if there was any activity
at the rear of the site which would require buffering. Mr. De Leu stated there
was not. He stated there is a chain-link fence at the rear of the property.
The Building Official stated he felt a plan should be presented for the Board's
approval and that the parking area should be stabilized to more than just sand.
The City Engineer informed the property owner the minute he starts tampering
with the exterior of the building (stabilizing the ground) he is going to be
required to put in a storm drainage retention pond. The City Planner asked
if the Board felt this site would satisfy the code which requires 1 parking
space for each 300 square feet of floor space. The Board unanimously agreed
that the three parking spaces as described and reviewed under the provisions
of Section 44.72 paragraph 27 would suffice. It was unanimously agreed that
the third parking space would not be required to be stabilized until it proved
otherwise. The City Engineer suggested that a maximum of one year for a re-
review subject to the Police Chief's determining whether or not a parking
problem has occurred prior to that and if so an immediate review upon his
determination. The Board unanimously agreed with the suggestion. The City
Planner stated this Board will review the operation on the site at the end of
one year. The applicant agreed to submit a copy of the sketch of survey showing
the parking spaces. The City Planner referred the applicant to Mr. Bradshaw
for licensing information and the Fire Chief for assistance with the fire codes.
Site Plan Reyiew Board Meeting
February 9, 1982
Page Two.
HUNT PROFESSIONAL OFFICE ON SOUTH MOSS ROAD - DETERMINATION OF COMPLIANCE WITH
CONDITIONS SET BY BOARD ON MARCH 6, 1980.
The City Planner stated regarding the Hunt Professional Office on South Moss Road
the owner was to place siding on the building, stained a neutral color. She
stated the point of the condition was that the building be upgraded in that it was
not a new structure. There was also provision for landscaping, which he made
several attempts at. Ms. Koch stated this was a year and a half ago. Mr. Hunt
was then sent to the Code Enforcement Board for noncompliance. He had six months
to put the refurbishing (siding) on the front of the building, which he did not
do. He was given an extension which he did not meet and was given another extension
by the Code Enforcement Board of six months to accomplish the refurbishing and
that six months expired January 27. She stated Mr. Hunt did alter the front of
the building in an effort to meet these conditions, and that the Board needs to
determine whether they find he has accomplished the purpose of the conditions,
which was to make that building fit into the residential neighborhood. The Building
Official stated when they had the review for the Code Enforcement Board it was
brought out that he would have to present a plan to the Site Plan Review Board for
approval and he has not presented a plan. The City Planner stated she recalled
this also, but that it was not listed as a condition in the minutes. Ms. Koch
asked the Board members for their opinions as to the satisfaction of the require-
ments. Mr. Emery stated he felt it looked as good as any of the other houses in
the area. He stated there are a variety of colors on the houses. Mr. Bradshaw
stated he did not agree. The wood on the office is a natural wood (no finish,
exterior yellow pine siding). He stated he did not feel it was going to hold up
very well tilted at an angle with no overhang. The Fire Chief stated he had no
problem with the building itself, but stated the surroundings could be improved.
Mr. Bradshaw stated the building was originally built as a temporary structure.
The City Planner stated the condition was to refurbish the front of the building
with siding stained a neutral color to be completed within six months. After
further discussion the Board agreed to have the City Planner write Mr. Hunt and
inquire as to his position on the refurbishing (whether it is complete at this
point and his future plans). The Planner will ask Mr. Hunt if and when he plans
to submit a plan so the Site Plan Review Board can determine whether or not he
has completed his refurbishing. The City Engineer suggested at such time as Mr.
Hunt is going to advise this Board whether he feels he has completed his work
that he be present so that they can question him further. The Board agreed with
this recommendation.
rf?if;;;;t
Recording Secretary.