REQUEST: Public Works Department requesting authorization to enter into a
contractual agreement with Wal -Rose, Inc. for construction of The Solary
Canal Regional Stormwater Treatment Area (ITB #010- 09 -BF)
PURPOSE: The purpose of this agenda item is to request authorization to enter into a
contractual agreement with Wal -Rose, Inc. for construction of The Solary Canal
Regional Stormwater Treatment Area (ITB #010- 09 -BF) in the amount of
$1,465,739.80 plus a 10% contingency.
CONSIDERATIONS:
The Solary Canal project is a proposed regional Stormwater Treatment Area located on a
28.9 -acre property at 1900 DeLeon Street in the northeast corner of the City of Winter
Springs (see Exhibit A). Final Engineering for the project was approved by the City
Commission at the September 22, 2008 Commission meeting.
At the December 14, 2009 City Commission meeting, the Commission approved an
agreement with the St. Johns River Water Management District (SJRWMD) for funding
construction of the project by the City of Winter Springs. The construction funding
agreement provides a total maximum reimbursement of $1,700,000 from SJRWMD,
consisting of an initial authorization of $1,465,739.80, plus additional funding of up to
$234,260.20 to fund any required project contingencies and change orders. At the
December 14, 2009 meeting, the Commission also provided authorization to execute a
Quit Claim Deed from SJRWMD for the City's acquisition of the 28.9 acre property.
The Solary Canal project is planned as a partnership between SJRWMD, Seminole
County, the City of Oviedo, and the City of Winter Springs. SJRWMD will fund the
entire cost of construction, and the three local agencies (Winter Springs, Oviedo, and
Seminole County) are planning to equally share in the annual operation and maintenance
costs for the project.
January 11, 2010
Agenda Item #203
Page 2 of 3
An Interlocal Agreement between Winter Springs, Oviedo, and Seminole County for
operation and maintenance of the project and the property is currently being finalized and
is expected to be submitted for City Commission approval at the January 25, 2010
meeting.
Construction bids for Invitation to Bid #010 -09 -BF were opened on April 29, 2009, with
results as follows:
Bidder Base Bid Alternates 1-3 Total
The Briar Team $1,230,000.00 $129,200.00 $1,359,200.00
Wal -Rose, Inc. $1,311,698.80 $154,041.00 $1,465,739.80
Gibbs Register, Inc. $1,342,730.75 $90,000.00 $1,432,730.75
Gomez Construction Co. $1,398,172.09 $117,539.50 $1,515,711.59
P &S Paving, Inc. $1,402,588.41 $89,000.00 $1,491,588.41
Enviro -Tech Systems, Inc. $1,455,139.00 $37,672.14 $1,492,811.14
C.F.E. Corp. $1,473,915.13 $122,080.00 $1,595,995.13
Phillips and Jordan, Inc. $1,563,163.41 $103,786.00 $1,666,949.41
Close Construction, Inc. $1,596,522.60 $125,000.00 $1,721,522.60
Mercon Construction Co., Inc. $1,781,975.67 $142,523.00 $1,924,498.67
Eden Site Development, Inc. $1,818,308.10 $143,000.00 $1,961,308.10
Pospiech Contracting, Inc. $2,289,944.00 $185,000.00 $2,474,944.00
APEC, Inc. $2,933,670.00 $145,000.00 $3,078,670.00
Oklawaha Farms, Inc. $3,000,207.92 $140,000.00 $3,140,207.92
The Briar Team had the lowest base bid of $1.23 million. The Briar Team had previously
agreed to extend their bid to October 29, 2009 while the necessary paperwork was
processed with the District. However, they have declined to extend the bid an additional
90 day period and have withdrawn from the project. The second lowest base bid was
from Wal -Rose, Inc. in the amount of $1.31 million. Wal -Rose has agreed to extend their
bid price until at least January 31, 2010 and they are currently the lowest responsive
bidder.
The delay between the bid opening date of April 29, 2009 and the recommendation of
contract award with this agenda item was due to SJRWMD's delay in preparing the
construction funding agreement and the quit -claim deed, both of which were approved by
the City Commission at the December 14, 2009 meeting. Staff was not comfortable with
awarding the construction contract and proceeding with any work without having the
funding agreement in place. The City would likely have been responsible for any costs
incurred prior to executing the funding agreement.
January 11, 2010
Agenda Item #203
Page 3 of 3
Bid Alternates #1-3 consist of sheet pile retaining walls designed to protect existing trees
near the side slopes of the proposed wet detention pond. At this time Staff does not
consider Bid Alternates #1 -3 to be necessary and the existing trees can be avoided by
minor reshaping of the pond side slopes in the vicinity of the trees. Funding for Bid
Alternates #1 -3 has been authorized by SJRWMD; however, Bid Alternates #1 -3 are not
planned to be executed unless field conditions require the use of the sheet pile retaining
walls. On this basis, the recommendation of contract award to Wal -Rose, Inc. is based on
Wal -Rose having the lowest base bid price.
FUNDING:
The project construction is funded 100% by the St. Johns River Water Management
District. Under the terms of the construction funding agreement, the City will invoice the
District monthly during the construction period and the District will reimburse the City within 45
days of receipt of an approved invoice.
RECOMMENDATION:
Staff recommends that the City Commission approve Wal -Rose, Inc. for construction of
The Solary Canal Regional Stormwater Treatment Area (ITB #010- 09 -BF) in the amount of
$1,465,739.80 plus a 10% contingency funded by the St. Johns River Water Management
District and authorize the City Manager and City Attorney to prepare and execute any and all
applicable documents.
ATTACHMENTS:
1. Bid Tabulation for ITB #010 -09 -BF
COMMISSION ACTION:
CITY OF WINTER SPRINGS, FL
1126 EAST STATE ROAD 434
WINTER SPRINGS, FL 32708
407 327 -1800
SOLARY CANAL REGIONAL
STORMWATER TREATMENT AREA
ITB 010 /09/BF
Called By: Nancy Vobomik- Purchasing Coordinator
ITB Opened: 1:30 PM
ITB Closed 1:43 PM
Date: April 29, 2009
Witness: Brian Fields, Engineer
Gomez Construction Co
750 Jackson Ave
Winter Park, FL 32789
Base Bid 1,398,172.09
Bid Alternate 1 -3 117,539.50
Phillips and Jordan, Inc
8940 Gall Blvd
Zephyrhills, FL 33541
Base Bid 1,563,163.41
Bid Alternate 1 -3 103,786.00
Enviro -Tech Systems, Inc
102 Frances Circle
Altamonte Springs, FL 32701
Base Bid 1,455,139.00
Bid Alternate 1 -3 37,672.14
Oklawaha Farms, Inc
9200 South Dadeland Blvd
Suite 705
Miami, FL
Base Bid 3,000,207.92
Bid Alternate 1 -3 140,000.00
Page Two
P S Paving, Inc
3701 Olson Drive
Daytona Beach, FL 32124
Base Bid 1,402,588.41
Bid Alternate 1 -3 89,000.00
Close Construction, Inc Corp
301 NW 4 Avenue
Okeechobee, FL 34972
Base Bid $1,596,522.60
Bid Alternate 1 -3 125,000.00
American Persian Engineers Constructors, Inc
4436 Old Winter Garden Rd
Orlando, FL 32811
Base Bid 2,933,670.00
Bid Alternate 1 -3 145,000.00
Central Florida Environmental Corp
910 Belle Ave., Suite 1040
Winter Springs, FL 32708
Base Bid $1,473,915.13
Bid Alternate 1 -3 122,080.00
The Briar Team, LLC
4570 Orange Blvd.
Sanford, FL 32771
Base Bid 1,230,000.00
Bid Alternate 1 -3 129,200.00
Wal -Rose, Inc
PO Box 728
Sanford, FL 32772
Base Bid 1,311,698.80
Bid Alternate 1 -3 154,041.00
Eden Site Development, Inc
115 W. Pine Avenue
Longwood, FL 32750
Base Bid 1,818,308.10
Bid Alternate 1 -3 143,000.00
Pospiech Contracting, Inc.
201 S. Apopka Ave
Inverness, FL 34452
Base Bid 2,289,944.00
Bid Alternate 1 -3 185,000.00
Mercon Construction Company, Inc
133 E Pine Avenue
Longwood, FL 32730
Base Bid 1,781,975.67
Bid Alternate 1 -3 142,523.00
Page Three
Gibbs Register, Inc
232 South Dillard Street
Winter Garden, FL 34787
Base Bid 1,342,730.75
Bid Alternate 1 -3 90,000.00