HomeMy WebLinkAbout1978 06 11 Site Plan Review Board Meeting Minutes
CITY OF WINTER SPRINGS
SITE PLAN REVIEW BOARD
MINUTES OF MEETING OF JUNE 11, 1978.
The meeting opened at 6:30 p.m. with the following representatives
of the City in attendance:
Jacqueline Koch, City Planner
Carrie Weaver, Board of Adjustment
The first site plan examined was that of the supermarket complex
at SR 434 and Fairfax Avenue. Present on behalf of the proposed
construction were:
Endre Garam, Owner
R. Belleville, Conway Construction Company
After examination of the Consulting Engineer's report on the project
and discussion of City requirements, the site plan for the Garam
Building was approved unanimously, with the following stipulations:
The maximum height of the free-standing sign designating the
building shall be no more than.10_feet high. Signs affixed to the
building shall not extend above the top of the building.