Loading...
HomeMy WebLinkAbout1978 06 11 Site Plan Review Board Meeting Minutes CITY OF WINTER SPRINGS SITE PLAN REVIEW BOARD MINUTES OF MEETING OF JUNE 11, 1978. The meeting opened at 6:30 p.m. with the following representatives of the City in attendance: Jacqueline Koch, City Planner Carrie Weaver, Board of Adjustment The first site plan examined was that of the supermarket complex at SR 434 and Fairfax Avenue. Present on behalf of the proposed construction were: Endre Garam, Owner R. Belleville, Conway Construction Company After examination of the Consulting Engineer's report on the project and discussion of City requirements, the site plan for the Garam Building was approved unanimously, with the following stipulations: The maximum height of the free-standing sign designating the building shall be no more than.10_feet high. Signs affixed to the building shall not extend above the top of the building.