REQUEST: The Parks and Recreation Department is requesting that the City
Commission consider addlitional street lighting in the Central Winds Park
Pavilion area that is not budgeted and would require new appropriation.
PURPOSE: To review three (3) lighting scenarios and receive direction from the City
Commission.
APPLICABLE LAW AND PUBLIC POLICY:
N/A
ISSUE ANALYSIS:
. There is presently no overhead night street lighting in the pavilion area at Central
Winds Park.
· The Parks and Recreation Department has received requests from the public regarding
how dark and possibly unsafe the area is after dark. Many events in the area continue
until dark and park patrons have difficulty going safely back to their vehicles.
· Night lighting in the pavilion area will make it available for night use rentals and
possibly other evening events.
Page 2
Agenda Item-CWP Pavilion Area Lighting
October 25, 1999
FUNDING:
This item is not budgeted and will requnre $4,994.30 for initial installation and $1,223.88
annual rental charges for a total of $6,218.18. Sufficient funding is not available for this
unbudgeted project in the Parks and Recreation budget. Another funding source is
needed.
RECOMMENDA nON:
The Parks and Recreation Department is recommending that all three (3)
scenarios be done for complete night lighting at the pavilion/parking area of
Central Winds Park.
IMPLEMENTATION SCHEDULE:
Work Order and Contrad
Estimated Completion by Florida Power Corporation
November 8,1999
January 1, 2000
ATTACHMENTS:
Attachment #1-
Staff Memorandum
Attachment #2-
Cost Scenario Spreadsheet
COMMISSION ACTION:
Agenda89
ATTACHMENT III
CITY OF WINTER SPRINGS, FLOR ' i
11 26 EAST STATE ROAD 434
WINTER SPRINGS, FLORIDA 32708-2 99
Telephone (407) 327-1800 OCT t 4 19991
Fax (407) 327.0018
Parks & Recreation Dept.
(;111'-,: ,
"~j-~~ S.P~JNGS
'~.iJ.-i :.7:..~~:~~~;~f
MEMORANDUM
TO:
Ron McLemore, City Manager
FROM:
Chuck Pula, Parks and Recreation Director
c.(?
SUBJECT: Lighting in Central Winds Park Pavilion Area
DATE: October 13, 1999
Commissioner Blake at the September 13, 1999 City Commission meeting spoke about
installing lights at "lower Central Winds Park" (where the pavilions are) because of
groups using the area after dark.
I contacted Florida Power Corporation and met with Mr. Jamie Seda on site, We
discussed three (3) scenarios, He sent me the three (3) scenarios with pricing and a
location map, which are attached,
Scenario #1 is as follows:
Four poles lighting from the passive area entrance to the restroom with a total cost of
$2,618,17 which is installation and one (1) year monthly rental.
Scenario #2 is as follows:
Two poles lighting up pavilion and parking area with a total cost of$1,463,56 which is
installation and one (1) year monthly rental.
Scenario #3 is as follows:
Three poles lighting up the back side of the parking area (exit road) with a total cost of
$2,136.45 which is installation and one (1) year monthly rental.
Page 2
October 13, 1999
Total cost for all three (3) scenarios is $6,218,18 which is installation and one (1) year
monthly rental.
The lighting of the passive area woods make it safer for groups who are still using the
area after dark. In fact, it would make available and encourage more night usage,
If I can be of further information, let me know.
/lmg
passivelighting.doc
OCT 04 '99 12:35PM FPC JAMESTOWN ENG
P.l
Florida
Power
CORPORATION
October 4,1999
Attn: Chuck Pula
City of Winter Springs
Parks and Recreation Director
RB: Streetlighting for passive area -Scenario #1
Dear Mr.Pula:
Thank you for your inquiry requesting Btreetlighting at the referenced site. Please see the
enclosed drawing showing the location for the proposed lights.
This proposal is for the installation of 4 CI-36 ISO-watt roadway fIXtures mounted on 4 35'
concrete poles, The cable will be fed undm-ground from exiati!lg facilities. We will have to
trench to each location. There will be an installation charge of 52,146.33 for trenching aDd
cabling. The estimated monthly rental charge for the proposed lights after installation is as
follows:
4 CI-36 150 watt Roadway fIXtures @ $6.31 ea
435' concrete poles @ $3.22 ea
Customer line billing
Total monthly rental (excluding taxes and! franchise fees)
$25 .24
$12.88
$ 1.20
$39.32
If this proposal meets with your approval, then please slgn and return the enclosed Lighting
Service Application fonn. Installation will not proceed until after the application has been
received, along with the payment. Please call me at 407-359.4443 should you have any funher
questions or if I may be of any fUrther assistance. Approximate in selVke date dependent upon
delivery of materials will be a minimum of eight weeks after receipt, of signed documents and
check (if applicable). '
Sincerely, ~~
~
Engineering Representative, Florida Powt:r Corporation
Florida Power Cmporation
GENERAL OFFICE: 3201 Thirty-fourth Streot South. P.O. Box 14042. St. Peterllburg. Fiorillo 33733 .1818) 886-5161
A Roride PrrJl/nIH CfJmp8ny
OCT-04-1999 12:42
407 646 8403
96%
P.01
OCT 04 '99 12:36PM FPC JAMESTOWN ENG
P.2
Florida
Power
eOfllPORATION
October 4,1999
Attn: Chuck Pula
City of Winter Springs
Parks and Rec1'eation Director
RE: Street1ighting for passive area -Scenario #2
Dear Mr.Pula~
Thank you for your inquiry requesting stJreetlighting at the :referenced site. Please see the
enclosed dIawing showing the location for the proposed lights.
This proposal is for the installation of 4 Cl-36 ISO-watt roadway fIXtures mounted on 235'
concrete poles. At these two locations the poles will have two fixtures per pole. The cable will
be fed underground from existing facilities. We will have to trench to each location. There will
be an installation charge of $1,069.00 for trenching and cabling. The estimated montbly rental
charge for the proposed lights after installation is as follows:
4 CI-36 ISO watt Roadway fixtute5 @ $6.31 ea
2 35' concrete poles @ $3,22 ea
Customer line billing
Total monthly rental (excluding taxes and franchise fees)
$25.24
$ 6.44
$ 1.20
$32.88
If this proposal meets with your approval, then please sign and return the enclosed Lighting
Service Application fOIm. Installation willI not proceed until after the application has been
received, along with the payment. Please call me at 407-359-4443 should you have any further
questions or if I may be of any further assistance. Approximate in service date dependent upon
delivery of materials will be a minimum of eight weeks after receipt of signed documents and
check (if applicable). ' ,
Sincerely, _ ~
~
EngIneering Representative, Florida Power Corporation
Florida Power Corporation
GENERAL OFFICE: n01 Thirty.fourth Strool Soulh" P.O. So)t 14042 . St. Petorsburg. Florida 33733 . (8181 868.&161
A FlOfldtJ flrOfJ'tJIJtJ CDmpe"y
OCT-04-1999 12:42
407 646 8403
96%
P.02
OCT 04 '99 12:36PM FPC JAMESTOWN ENG
P.3
Florida
Power
CORPORATION
October 4,1999
Attn: Chuck Pula
City of Winter Springs
Parks and Recreation Director
RB: Streetlighting for passive area -Scenario #3
Dear Mr.Pula:
lbank you for your inquiry requesting street1ighting at the referenced site. Please see the
enclosed drawing showing the location fmr the proposed lights.
This proposal is for the installation of 3 CI-36 ISO-watt roadway fixtures mounted on 3 35'
concrete poles. The cable will be fed underground from existing facilities. We will have to
trench to each location. There will be an installation charge of $1,778.97 for trenching and
cabling. The estimated monthly rental charge for the proposed lights after installation is as
follows:
3 Cl-36 ISO watt Roadway fixtures @ $6.31 ea
3 35' COJlCtete poles @ $3.22 ea
Customer line billing
Total monthly rental (excluding taxes and franchise fees)
$18.93
$ 9,66
$ 1.20
$29.79
If this proposal meets with your approval, then please sign and return the enclosed Lighting
Service Application form, Installation will not proceed until after the application has been
received, along with the payment. Please call me at 407-359-4443 should you have any further
questions or if I may be of any further assistance. Approximate in service date dependent upon
delivery of materials will be a minimum of eight weeks after receipt of signed documents and
check (if applicable).
Sr\L~
l;;;;:;eda -.. ~
BngiDeering Representative, Florida Power COIporation
Florida Power COlporation
GENERAL OFFICE: 3201 Thlny.tounh Street South. P'.O. Box 14042. SI. P1It9raburg. Florid. 33733. (8131 866-5151
A Fltlrlds Prvgl'fH/l1 CompBnv
OCT 11 '99 09:22AM FPC JAMESTOWN ENG
LL. ~fa I So 1LI A'i'\
3s' Sl"~OAe 0
UI'IO~fC bClou ^' [)
A" t:40/lJ A ~, tJ)( fu ( eS
C.lhlC fl~ iC. P ell eS
c. YU!~La
o
1
O~\S\l.L'D ~
\
.l
&~
v;
.
~:
I
~
f
I
P.2
1.
,
'. -e
,
,
,
~ //--
r:-e ---
,.
~x,~ flub
I ~ f'clZlFl{;:(.
p~,v~ ~""A L, bH-T,o&
~
~
o AoI200~~
PAulu.,ol'l ~ ----70
OCT-11-1999 09:29
407 646 8403
~
t'IJ
t::l
-
QJ
<z
~
\[}
97%
P.02
INSTALLTION CHARGES
Scenario #1
$2,146.33
Scenario #2
$1,069.00
Scenario #3
$1,778.97
TOTAL INSTALLATION CHARGES
FOR ALL THREE SCENARIOS:
$4,994.30
TOTAL:
$6.218.18 Needed
Central Winds Park
Passive Area Lighting
Cost Scenario Spreadsheet
ATTACHMENT 12
YEARLY RENTAL CHARGES
Scenario #1
$ 471.84
Scenario #2
$ 394.56
Scenario #3
$ 357.48
TOTAL YEARLY RENTAL
CHARGES FOR ALL THREE
SCENARIOS:
$1,223.88