HomeMy WebLinkAbout1999 08 09 Regular Item B
COMMISSION AGENDA
ITEM
B
CONSENT
INFORMATIONAL
PUBLIC HEARING
REGULAR X
August 9, 1999
Meeting
MGR~ /DEPT ~
Authorization
REQUEST: Public Works Department Requesting Authorization for Construction
Administration Services with Starmer Ranaldi Planning and Architecture
Inc. for the Tuscawilla Lighting and Beautification District Entryway
Enhancement and Median Improvement Project
PURPOSE: The purpose of this Board item is to recommend that the City Commission
authorize the construction administration scope of services with SRI for the
Tuscawilla Lighting and Beautification District improvements at a not to exceed
cost of $28,000.
CONSIDERATIONS:
This agenda item is needed to provide professional construction administration
services for the TLBD improvement project including the disciplines of civil engineering,
landscape architecture, architecture, structural engineering, and electrical engineering.
SRI was previously approved as the top ranked architectural firm in response to RFP-
008-99-KL on March 22, 1999. They completed the design and bidding services for the
TLBD project at a cost of $139,600 which was $4,400 less than authorized.
The proposal for construction administration services from the architect is
attached. The scope of services includes periodic construction supervision, shop drawing
review, progress meetings, pay application review, and as-builts.
FUNDING:
The funding source for this expenditure of $28,000 will be TLBD Improvement
Fund.
TLBD Cons!. Admin,
August 9, 1999
Regular Agenda Item B
Page 2
RECOMMENDATION:
It is recommended that the City Commission authorize the construction
administration scope of services with SRl for the Tuscawilla Lighting and Beautification
District improvements at a not to exceed cost of $28,000 payable from the TLBD
Improvement Fund.
IMPLEMENT ATION SCHEDULE:
The scope of services will be completed over the 365-day construction period.
ATT ACHMENTS:
1. SRl Proposal for Construction Administration
COMMISSION ACTION:
TLBD Const. Admin.
A TT ACHMENT NO. 1
.
srI
17 Jun 99
Kip Lockcuff
Public Works Director
1126 East SR 434
Winter Springs, Florida 32708 - 2799
Re: TuscawiIla Lighting and Beautification District (TLBD)
Entryway Enhancement and Median Improvement Project
Proposal for Professional Design Services
Kip
We look forward to working with you on the above referenced project and offer the foIlowing proposal for
professional design services for your review and approval.
1. Scope of Project
A. Provide improvements to the entryways into the Tuscawiila residential community to enhance
existing conditions and create a new image that identifies the City of Winter SpriDgs as a
premiere residential community.
B. These improvements include lighting, landscaping, irrigation, hardscaping (swface pavers and
or walls), and signage. The locations for these improvements are briefly described as follows:
L '<Primary Entryway" enhancement at the main Tuscawilla entrance located at Winter
Springs Boulevard and Tuskawilla Road (estimated construction budget $ 870,000)
2. "Secondary Entryway" enhancements located at the intersection of Winter Springs
Boulevard and Seneca (estimated construction budget $ 60,000)
3. "Tertiary Entryway" enhancements located at the intersection of Tuskawilla Road and
Trotwood (estimated construction budget $ 130,000)
4. "Minor Entryway" enhanceme~ts located at approximately 6 minor intersections within
the TuscawilJa P.U.D. (estimated construction budget $ 220,000)
5. "Median Landscape" enhancements located along the entire length of Winter Springs
Boulevard within the City limits. (estinlated construction budget $ 990,000)
6. "Signage & Directional" enJtaI1cements at key locations throughout the Tuscawilla
P.U.D, (estimated construction budget $ 120,000)
II. Scope of Basic Services
sri shall provide complete professional construction administration services for this project
including the disciplines of civil engineering, landscape architecture, architecture, structural
engineering, and electrical engineering suitable assuring that the construction is performed in
accordance with the construction documents and stays on schedule, with the following tasks.
Slarmer Ranaldi Planning and Archileclure Inc, AA,002984
890 Northern Way Suile E,I Winler Springs, Florida 32703 Phone 407 977 1030 Fax 407 977 1019
A. Construction Administration (CA)
1. Assist owner with executing the construction contract
2. Chair pre-construction conference
3. Shop drawing review and approval
4. Hold bi-weekly job site meetings
5. Monitor contractors schedule
6. Field verification of improvement locations and layout
7. Contractor payment application review and approval
8. Periodic construction inspection
9. Periodic problem solving
10. Project close out procedures
a Identify date of substantial completion
b. Prepare [mal punch list and monitor completion
c. Obtain all warranty and maintenance & operation manuals
d Obtain "as-built" record documents
e. Recommend final payment application approval
11. Provide 1 tear warranty review inspection to identify any necessary
repairs prior to expiration of the 1 year warranty period
ill. Scope of Additional Services
2hrs
8hrs
60hrs
50hrs
8hrs
64hrs
24hrs
160hrs
40hrs
2hrs
8hrs
16hrs
8hrs
4hrs
16hrs
The following services are considered beyond the scope of basic services and can be provided by
sri upon confirmation of scope and written authorization of the client:
A. Boundary and topographical surveys
B. Geotechnical soils exploration
C. Public hearing and/or presentations
D. Expert witness I legal testimony
IV. Schedule of Fees
A At an average hourly rate of $75/hr the 470 hrs above would result in $ 35,250. We propose a
lump sum fee of $ 28,000.
B. Or we propose working on an hourly basis, mutually monitoring our time, at a reduced hourly
rate of $65/hr and the city can choose which services they really need
VI. Clarifications
A Fees quoted above are based on the scope of work stated herein and should tlle scope change
significantly, additional compensation shall be warranted.
B. The time involved with construction administration services herein are an estimate and can
very widely subject to project conditions, weather, and contractor's performance.
We trust tllis proposal will be well received, we look forward to helping you make tlllS exciting project a
great success, and upo your written authorization below we will begin work as soon as possible.
iA'" ,
tvV~er NC
President
Proposal Accepted
City of Winter Springs
Date