March 22, 1999 MGR 0EPT jJ'y
Meeting Authorization
REQUEST: Public Works Department Requesting Authorization to Expend Funds to
Convert Existing Overhead Electric Crossings to Underground on S.R. 434
from 17-92 to S.R. 419
PURPOSE: The purpose of this Board item is to request authorization from the City
Commission to Enter into a Authorization Agreement with Florida Power
Corporation and Time Warner Communications, Inc. to Convert the Existing
Overhead Crossings on S.R. 434 from 17-92 to S.R. 419 to Underground
Crossings at a cost of$138,323.21.
CONSIDERATIONS:
This work is needed to continue the process of eliminating overhead utility
crossings on S.R. 434, which will enhance the appearance of the corridor. Florida Power
has provided us a cost of $1 08,623.21 to convert the existing overhead electric crossings
from 17-92 to S.R. 419. This does not include the transmission lines west of Belle
Avenue. Time Warner Communications has also provided a cost of$29,700 to eliminate
the cable crossings from 17-92 to S.R. 419. Bellsouth and Sprint do not have any
crossings in this area.
FUNDING:
The $138,323.21 will be available from the 1999 Revenue Improvement Bond.
Consent Agenda Item E
March 22, 1999
Page 2
RECOMMENDATION:
It is recommended that authorization be given to Enter into a
Authorization Agreement with Florida Power Corporation and Time Warner
Communications at a cost of$108,623.21 and $29,700, respectively, to convert
the Existing Overhead Crossings on S.R. 434 from 17-92 to S.R. 419 to
Underground Crossings payable from the 1999 Revenue Improvements Bond
proceeds. Funds will be expended within thirty days of the bond receipts.
IMPLEMENTATION SCHEDULE:
The crossings will be scheduled for construction as soon as Florida Power
Corporation and Time Warner Communications receives payment. DOT permits are
already received. Both utilities should be complete within 90 days of the execution of the
authorization.
ATTACHMENTS:
1. Authorization and Agreement - FPC
2. Time Warner Communications, Inc. Quote
COMMISSION ACTION:
A TT ACHMENT NO. 1
...~..-
..~. ....
t- -~
.. ..
\- -,
,,!-'-~.,
....-
FLORIDA
POWER
AUTHORIZATION AND AGREEMENT
CORPORATION
~ WORK AUTHORIZATION
~JOB ORDER
J35-99-0138UG
INVOICE
NUMBER 99-0138
CUSTOMER.S NAME I TRADE NAME IREPRESENTATIVE'S NAME REPRESENTATIVE'S TITLE
CITY OF WINTER SPRINGS RON MCLEMORE CITY MANAGER
CITY STATE ZIP
1126 E. STATE ROAD 434 WINTER SPRINGS FL 32708
WORK DESCRIPTION
REIMBURSEMENT
OVERHEAD TO UNDERGROUND CONVERSION OF ALL ELECTRIC ROAD
CROSSINGS ON STATE ROAD 434 BETWEEN STATE ROAD 17/92 AND
STATE ROAD 419.
Florida Power Corporation is not responsible for damage to, or costs arising from unknown underground facilities,landscape or driveways in trench routes.
TERMS OF PAYMENT un or oe ore Other
BILLING METHOD 20 days after
!!IContract Price $ 108623.21 !!ICost DCost plus 15% !!J In advance o Date of invoice 0 Explain below
OTHER TERMS OF PAYMENT OWNERSHIP OF COMPLETED PROJECT IDATE CHECK RECEIVED
I!IFPC OCustomer
AGREEMENT
The Customer is responsible for the cost, repair or replacement of (1) any sOd,trees,shrubbery,or other plants damaged in the normal course of performing or gaining
access to the above work, and (2) any damage to non-FPC underground wires, conduit. pipes or other utility facilities that have not been staked or located by owner
of the facilities. Contract price and terms of payment become invalid if the signed Agreement is not received by FPC on or before ......... 30 DAYS
The undersigned hereby authorizes and employs Florida Power Corporation to perform the above work including all necessary labor. facilities, equipment and lor
materials to pay in accordance with the above terms of payment.
SIGNATURE OF ABOVE CUSTOMER OR REPRESENTATIVE DATE
AUTHORIZATION A__ J "I I J
REPORTING LOCATION RA CODE AUTHORIZING SUPERVISOR X~ DATES/;"/'fi
JAMESTOWN 562 R.B. MATTHEWS
ACCOUNTING INFORMATION I I
DATE (MONTH&YEAR) J,E.(MONTH&NUMBER) SEa ACTIVITY COMMENT
2 4 8 8 10 "" 3.
UNDERGROUND CONVERSION
CHARGES (DEBIT) CREDITS $ AMOUNT
PRIMARY PRIMARY I A~KJKA
ACCOUNT RA EAC ACTIVITY A CODE iACCOUNT RA EAC ACTIVITY CODE
40 43 4. 4. S5 40 43 46 4. 55
14220 562 364 562 809 AJ3519 48478W $1,358.92
14220 562 365 562 809 AJ3519 48478W $1,110.63
14220 562 367 562 809 AJ3519 48478W $3.16
14220 562 369 562 809 AJ3519 48478W $215.60
14220 562 562 811 AJ3519 48478X $105,934.90
TOTAL $108,623.21
TO: CONTROLLER'S DEPARTMENT
Please open Job Or,!er for accumulating costs.
~EaUESTEO 8'( CATE
I "CllVlTV I TASK ICOMI'LEHON DATE
Please close Job Ord(Jr 10
'. . .,.
WORK ORDER
NUMBER
7068029186
ORIGINAL PLANT ACCOUNTING/GENERAL ACCOUNTING COPIES TO P&DAD: DISTRICT OFFICE: CUSTOMER, ORIGINATING DEPARTMENT
\ i I \/. ./. i.:., ,,f
ATTACHMENT NO.2
{:, ;'1,. I ;,"jj!r! :.':',',,' ,.>//11
I;'i /1 I,~ .:":;" S!j.,',~
r~f\ ./f1";.(,:\',.I/t'J::
~ TIME WARNER
" COMMUNICATIONS
November 9, 1998
Mr. Kipton D. Lockcuff, P.E.
City of Winter Springs
1126 East S.R. 434
Winter Springs, Florida 32708
RE: State Road 434 Utility Conversion
(Phase I) Highway 17-92 to C.R. 419
(Phase II) C.R. 419 to Tuskawilla Road
Dear Mr. Lockcuff:
As requested, Time Warner Communications has completed its preliminary cost assessment to convert
overhead CATV crossings to underground along the above referenced corridor. It is our understanding that
your request is limited to that of removing our overhead facilities which currently cross over State Road
434. As previously discussed, this activity will necessitate the installation of a directional bore at each of
our existing overhead crossing locations.
The following cost is representative of all construction, splicing and overhead cable removal required to
accommodate the City of Winter Springs' request. Please note, schedules, dependent activities and
duration's of construction have not been assessed or identified as of this date.
Phase I - (State Road 434, from Highway 17-92 to c.R. 419)
Construct, splice and activate new underground CATV lateral crossings at (9) nine locations. Removal of
existing overhead crossings at (10) ten locations. Cost $29,700
Phase II - (State Road 434, from C.R. 419 to Tuskawilla Road)
Construct, splice and activate new underground CATV lateral crossings at (2) two locations. Removal of
existing overhead crossings at (3) three locations. Cost $6,600
Following your review of the aforementioned information, please do not hesitate to contact me if you
should have any questions or comments. I can be reached at (407) 654-0657.
Sincerely,
{I{~.~C)t .
Marvin L. Usry, Jr. '
Construction Supervisor
rr-, .-, or-- ;c: "":. fED
111'. '(':,', ", " '. . '.: '
cc: P.J. King, Time Warner Communications
~l n \j
:1 1998
Cl.~ -:. ;,,' ':';;'.:1INGS
......1 j'h; I '( '..)Ir<f:::r~:T,,);:{
, ;:1