HomeMy WebLinkAbout1997 08 25 Consent Item E
COMMISSION AGENDA
---
ITEM E
REGULAR
CONSENT X
INFORMATIONAL
August 25. 1997
Meeting
MGR I~DEPT Jky
Authorization
REQUEST: Utility Department Requesting Authorization to Execute Supplement No.1 to
Amendment 36 for Consulting Engineering Services with Conklin, Porter &
Holmes Engineers, Inc.
PURPOSE: The purpose of this Board item is to request authorization for the execution of
Supplement No. 1 to Amendment 49 for Moss Road Bridge Construction
Administration Services with Conklin, Porter & Holmes Engineers, Inc. at a cost of
$10,500.00.
CONSIDERA TIONS:
This supplement is needed to provide construction administration services for the
Moss Road Bridge Replacement Project. The City does not have the staff for full
construction administration nor the expertise for bridge structural reviews and this service
has been historically contracted out. The scope of work includes preconstruction and
progress meetings, shop drawing review, periodic inspections, pay request processing,
record drawings, and SJRWMD certification of completion.
The design of this project was previously authorized at a cost of $23,650. The
project construction contract is recommended to be awarded to Prime Construction Group,
Inc. at a cost of $338,700. Construction is scheduled to begin on November 1, 1997 with the
road being closed for approximately 90 days. Signs will be posted notifying residents two
weeks prior to closure.
August 25, 1997
Consent Agenda Item E
Page ..2.
FUNDING:
The cost for Supplement No.1 to Amendment 49 is $10,500. The source of funds
would be the consulting services line code (140-53180) of the Transportation Impact Fee
Fund. Funds would be expended in 180 days.
RECOMMENDA TION:
It is recommended that authorization be given for the execution of Supplement No. 1 to
Amendment 36 for the Moss Road Bridge Replacement Construction Administration Services with
Conklin, Porter & Holmes Engineers, Inc. at a cost of $10,500.00 payable from the Transportation
Impact Fee Fund consulting engineering line code (140-53180).
IMPLEMENTA TION SCHEDULE:
The scope of services will be completed within 180 days of approval.
ATTACHMENTS:
1. Supplement No.1 to Amendment 36
COMMISSION ACTION:
Attachment No. 1
AMENDMENT NO. 36
SUPPLEMENT NO.1
CONSULTING ENGINEERING SERVICES
Construction Administration
Moss Road Bridge
This Supplement is made and entered into this day of 1996, by and
between the City of Winter Springs and Conklin, Porter and Holmes - Engineers, Inc.
WHEREAS, the CITY and ENGINEER have previously entered into an Agreement for
the ENGINEER'S professional services (Amendment No. 36); and
WHEREAS, the CITY and the ENGINEER shall refer to Amendment 36 herein, and
desire to have it incorporated by reference; and
WHEREAS, the CITY now wishes to authorize Section 3.5 of Amendment 36.
NOW THEREFORE, in consideration of the mutual promises and covenants contained
herein and given one to the other, the sufficiency of which is hereby acknowledged, the parties
agree as follows:
I SCOPE OF WORK
The scope of work has been agreed to by the parties, and is attached hereto and
incorporated herein, by reference, as Exhibit 1. Mr. Terry M. Zaudtke, P.E.,
Senior Vice President, has been designated as Project Manager for this project, by
the ENGINEER.
II FEE
The fee has been agreed to by the parties, and as attached hereto and incorporated
herein, by reference, as EXHIBIT II.
III. TERM
The term of this Supplement shall be for six (6) months from the date of final
execution by the City. .
IV. ENTIRE AGREEMENT
This Supplement supersedes aU previous authorizations, agreement, or
representations, either verbal or written, heretofore in effect between the CITY and
the ENGINEER that may have concerned the matters covered herein, except that
this Supplement shall in no way supersede or amend Amendment 36 or other
authorizations except as specifically provided herein. No additions, alterations, or
variations to the terms of this Supplement shall be valid, nor can the provisions of
this supplement be waived by either party, unless such additions, alternations, or
waivers are expressly set forth in writing in a document of import equal to
Amendment 36 or the Supplement, and duly executed.
IN WITNESS WHEREOF, the parties hereto have executed this Supplement No.1 on the
day and year first written above.
CITY OF WINTER SPRINGS, FLORIDA
BY:
DATE:
A TTEST AND SEAL:
City Clerk
CONKLIN, PORTER AND HOLMES
ENGINEERS, INC.
BY:
DATE:
A TTEST AND SEAL:
Linda M. Gardner
EXHIBIT I
SUPPLEMENT NO.1
SCOPE OF WORK
CONSTRUCTION ADMINISTRATION SERVICES
The provisions of Section 3.5 of Amendment 36 describe in detail the Scope of Services
for this Supplement.
EXHIBIT II
SUPPLEMENT NO.1 (AM. 36)
COST ANALYSIS
Construction Administration Services*
$10,500.00
$10,500.00
Subtotal (Supplement No.1)
Original Authorization
Am. 49 (Design, Permitting, Bidding) $23,650.00
Supplement No.1 Construction
Administration $10,500.00
Total Authorization $41,150.00
*As described in Section 6.1.1 of Amendment 36.