HomeMy WebLinkAbout1997 08 25 Consent Item D
COMMISSION AGENDA
ITEM
D
REGULAR
CONSENT X
INFORMATIONAL
August 25. 1997
Meeting
MGR ~/DEPT jLj"
Authorization
REQUEST: Public Works Requesting Authorization to Enter Into a Contract
Agreement for the Replacement of the Moss Road Bridge
PURPOSE: The purpose of this Board item is to request authorization to enter into a contract
agreement with Prime Construction Group, Inc. for the replacement of the Moss
Road Bridge at a cost of $338,700.00 plus a 10% contingency.
CONSIDERA TIONS:
This project is needed to prevent the flooding of Moss Road at the Gee Creek
bridge during storm events. The project scope of work is for the replacement of the Moss
Road bridge over Gee Creek including the pedestrian walkway on both sides.
The roadway over the bridge has been frequently overtopped during storm events
the last several years which has resulted in a closure of this collector road. The road
closing creates traffic circulation problems and also limits the abilities of public safety
personnel to access some areas of the City during emergencies.
Bids for #97-025 were opened on August 13, 1997. The low bidder was Prime
Construction Group, Inc. of Orlando with a low bid of $338,700.00. Prime Construction
Group, Inc. has previously satisfactorily performed several stormwater and utility projects
for the City including the recently completed Hayes Road Bridge Replacement.
The scope of work for this project includes replacement of the triple 12'X6' box
culverts with a double span bridge made of prestressed concrete similar to the Hayes
August 25, 1997
Consent Agenda Item D
Page ..l.
Road bridge. The elevation of the road will be raised approximately three feet to
elevation 40.5. This will eliminate the road flooding up to the 25 year storm event which
raises the level service for this structure to acceptable level "C". The peak stage for the.
100 year event exce.eds the road elevation by only 0.2 feet although other portions of the
road system could have significantly higher flood depths. The finished floor elevations
of adjacent homes is at least one foot higher than the road elevation over the bridge.
FUNDING:
Funds are available in the Capital Projects line code of the Transportation Impact
Fee Fund for this project which was budgeted at $383,500. The bid cost is $338,700.00
which is below the engineer's estimate of $500,000. The funds for this project will be
expended within 180 days of issuance of the Notice To Proceed.
RECOMMENDA TION:
It is recommend that authorization be given to enter into a contract agreement
with Prime Construction Group, Inc. for the replacement of the Moss Road bridge at a
cost of $338,700.00 plus a 10% contingency to be funded from the Transportation Impact
Fee capital improvement line code (140-56310).
IMPLEMENTATION SCHEDULE:
This work will be completed within 180 days of issuance of a Notice To Proceed.
All permits have been received. Construction is anticipated to begin approximately
November 1, 1997. Moss Road at the bridge will be closed for up to 90 days. Signs will
be posted prior to closure and a detour route will be provided by the contractor.
August 25, 1997
Consent Agenda Item D
Page~
A TT ACHMENTS:
1. Agreement Form
2. City Clerk Bid #97-025 Tabulation
3. Consultants Recommendation
COMMISSION ACTION:
I
I
I
II
I
Attachment No. 1
SECTION 00500
AGREEMENT FORM
1. GENERAL
1.01 THIS AGREEMENT, made this _ day of , 199_, by and between
(1) the City of Winter Sorinas , hereinafter called the OWNER, and
(2) doing business as a
(3) , and hereinafter called the CONTRACTOR.
1.02 WHEREAS, the OWNER and the CONTRACTOR are desirous of entering into an Agreement for
construction of a by CONTRACTOR for OWNER.
II
II
I
II
II
I
II
I
I
II
I
II
I
I
NOW, THEREFORE, for and in consideration of the mutual promises hereinafter exchanged
the parties agree as follows:
1. Contract Documents - The Contract Documents consist of this Agreement; all Technical, General,
and Supplementary Conditions and Sections contained in the Project Manual; the Drawings as listed on the
Bid..Form and Index to Drawings; all Addenda issued prior to and all Change Orders issued after execution
of this Agreement. These form the Contract and all are as fully a part of the Contract as if attached to this
Agreement or repeated herein.
2. ScoDe of Work - The CONTRACTOR shall perform all work required by the Contract
Documents for the construction of Moss Road Bridae ImDrovements,
3. Contract Time - The CONTRACTOR shall begin work within ten (10) days after the issuance of
a written Notice to Proceed and shall complete the work within one hundred fifty (180) calendar days from
the date of the Notice to Proceed.
4. Liauidated Damages - OWNER and CONTRACTOR recognize that time is of the essence of this
Agreement and that OWNER will suffer financial loss if the Work is not substantially complete within the
time specified in Paragraph 3 above, plus any extensions thereof allowed in accordance with the General
Conditions. They also recognize the delays, expense, and difficulties Involved in proving in a legal
arbitration proceeding the actual loss suffered by OWNER if the Work is not substantially complete on time.
Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated
damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER $500,00 for each day that
expires after the time specified in Paragraph 3 for final completion until the work is finally complete.
5. Contract Price. LumD Sum Contract - The OWNER will pay the CONTRACTOR in current funds for
the performance of the work, subject to additions and deductions by Change Order, the Total Contract
Price of Dollars ($ ). Payments will be made to the
CONTRACTOR based on the Lump Sum Bid amount, the Schedule of Values, and subject to completion
of the work, in accordance with the Contract Documents.
(1) OWNER
(2) CONTRACTOR
(3) Sole Proprietor, Partnership, or Corporation
00500-1
ii'i
tT'II
6. Payments - The OWNER will make payments as provided in the General Conditions
and Supplementary Conditions.
n
7. Enaineer - The Project has been designed by Conklin, Porter & Holmes-Engineers, Inc., referred
to in the documents as the Engineer, whose authority during the progress of construction is defined in the
General Conditions and Supplementary Conditions.
fi
8. SQ..od - CONTRACTOR shall supply a materials, performance and payment bond{s) in accordance
with Florida law and to the satisfaction of OWNER.
ew.
9. MediationlVenue . The parties agree that should any dispute arise between them regarding the
terms or performance of this Agreement, both parties will participate in a mediation. The parties agree to
mutually select a mediator and in the event they cannot mutually agree upon a mediator, one will be
appointed by the American Arbitration Association. The parties agree to equally share the cost of the
mediator. Should the parties fail to resolve their differences through mediation, then any cause of action
filed hereunder shall be filed in the Circuit or County Court for Seminole County, Florida.
_t'li
10. CONTRACTOR warrants the Moss Road Bridae Imorovements will be fit for the City's intended
~. use and purpose and will comply with all Federal and State laws and regulations.
II!!!
!i~ 1 .03 I~ WITNESS WHEREOF, the parties hereto have executed this Agreement the day and year first above
written.
II
II
II
II
II
II
II
II
II
II
11\
IIi
CONTRACTOR:
Name of Firm
(Seal)
By (Signature and Title)
Attest
OWNER:
The Citv of Winter Sorinas
Name of Firm
(Seal)
By (Signature and Title) Ron McLemore, City Manager
Attest
END OF SECTION
00500a/winspgs/spec
00500-2
Attachment No. 2
~
CITY OF WINTER SPRINGS, FLORIDA
1126 EAST STATE ROAD 434
WINTER SPRINGS, FLORIDA 32708.2799
Telephone (407) 327-1800
Project Title: MOSS ROAD BRIDGE IMPROVEMENTS
Bid Number: 97-025
Bid Opening Date: AUGUST 13, 1997
The bid opening was called by: J.P. PETRENCSIK
Present as witness:
KIP LOCKCUFF, P.W./UTILlTY DIRECTOR
TERRY ZAUDTKE, CONSULTING ENGINEER
NANCY YOBORNIK, PURCHASING SECRETARY
Bid Opened:
Bid Closed:
2:05 P.M.
2:10 P.M.
Bid Bond Required: YES
Performance Bond Required: YES
four Bids Received:
I. PIPELINE INC. OF PINELLAS COUNTY, 5838 MASTERS BLVD., ORLANDO, Fl32819
IN THE AMOUNT OF $442,350.00.
2. TECHNICAL SPECIALTY CONSTRUCTORS, INC., P.O. BOX 5400, OCALA, Fl34478-5400
IN THE AMOUNT OF $419,150.00.
3. PRIME CONSTRUCTION GROUP, INC., P.O. BOX 590507, ORLANDO, Fl 32859-0507
IN THE AMOUNT OF $338,700.00.
4. STAGE DOOR II, 3208 OVERLAND ROAD, APOPKA, Fl32703
IN THE AMOUNT OF $348,486.00.
0r.A:
Martha Jenkins, Dep
cc:
Purchasing Department
City Manager
Public Works Dept.
Attachment No. 3
Conklin, ~orter and Holmes
@ ~ ENGINEERS, INC.
o 1104 E. ROBINSON STREET
ORLANDO, FLORIDA 32801.2092
TEL 407-425-0452
FAX #407-648-1036
August 14, 1997
Mr. Kipton Lockcuff, P.E.
Utilities Director
City of Winter Springs
110 N. Flamingo Road
Winter Springs, Florida 32708
RE: City of Winter Springs - ryIoss Road Bridge Improvements
Bid No. 97-025
CPH Project No. W0450.00
Dear Kip:
On Wednesday, August 13, 1997, the City received bids for the Moss Road Bridge
Improvements. Copies of the bids were provided to us for review.
The following is a summary of the bidders and their associated lump sum bid prices:
Contractor Base Bid
Price
Prime Construction Group $338,700.00
Stage Door II, Inc. $348,486.00
Technical Special Constructors, Inc. $419.,150.00
Pipeline, Inc. $442,350.00
Engineer's Estimate of Probable Construction $500,000.00
Cost
Prime Construction Group, Inc. has performed previous work for the City and CPH. Their
work has generally been above average and has been performed in a timely manner.
Specifically, Prime Construction Group constructed the Hayes Road Bridge for the City which
is very similar to this project. A review of references and other data reveals that they are a
capable and competent contractor and that they are able to perform the project work.
Conklin, ~rter and Holmes
@ ~ lrLJ ENGINEERS, INC.
In summary, we have no objection to the City I S award of this project to the Prime Construction
Group, Inc. based on available information and their base bid price of $338,700.00.
If you have any questions, please give me a call.
Sincerely,
CONKLIN, PORTER & HOLMES - ENGINEERS, INC.
~u t , P.E., DEE
Senior Vice President
TMZ/ja