Loading...
HomeMy WebLinkAboutResolution 630 Design Building Contracts RESOLUTION NO. 630 A RESOLUTION OF THE CITY OF WINTER SPRINGS, FLORIDA, ADOPTING CERTAIN RULES AND PROCEDURES FOR THE AWARD OF DESIGN BUILD CONTRACTS; SEVERABILITY, CONFLICTS AND EFFECTIVE DATE. WHEREAS, the City Commission of the City of Winter Springs, Florida, is desirous of utilizing the design-build concept for the construc- tion of certain public Capital Improvements, and WHEREAS, Chapter 89-l58 Laws of Florida require that each state agency adopt rules for the award of design-build contracts. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF WINTER SPRINGS, FLORIDA: SECTION I: That the City Commission hereby adopts the "Rules for Award of Design-Build Contracts", attached, hereto marked as Appendix A and made a part hereto by reference. The purpose is to bring current the method by which the City awards design-build contracts into accordance with state law. SECTION II: That the adopted Rule for Award of Design-build Contracts shall remain in full force and effect until revised by subsequent resolutions of the City Commission of Winter Springs, Florida. SECTION III: This Resolution shal1 remain in force and effect until supplemented, amended, repealed or otherwise altered. SECTION IV: All resolutions or parts of resolutions in conflict with this Resolution are hereby repealed. SECTION V: This Resolution shall take immediate effect upon its passage and adoption. Passed and adopted this 8th day of January, 1990. CITY OF WINTER SPRINGS LEANNE M. GROVE, MAYOR ATTEST: MARY T. NORTON CITY CLERK CITY OF WINTER SPRINGS FLORIDA RULES FOR AWARD OF DESIGN-BUILD CONTRACTS Following are standards and procedures for the award of design build contracts. SELECTION OF DESIGN CRITERIA PROFESSIONAL 1. The design criteria package for a design-build project shall be prepared and sealed by a design criteria professional employed or retained by the City and selected in accordance with the Con- sultant's Competitive Negotiation Act (CCNA). The design criteria professional shall be utilized throughout the project for consul- tation for the evaluation of the responses on bids submitted by the design-build firm, the supervision or approval by the City of the detailed working drawings of the project, and for eval- uation of the compliance of the project construction with the design package. 2. The design-build firm shall be selected in the following manner: a. The City's standard notice to Professional Consultants shall be published in the local newspaper expressing the City's desire to obtain the services of a "design- build firm" for a specific project by a bid, a response to the City's request for a proposal, or to obtain the services through the Competitive Negotiation Act and negotiate a design-build contract. b. For projects utilizing the negotiated design-build concept the staff shall review and grade all proposals/brochures utilizing the standard evaluation form. The top seven shall be interviewed by the staff, utilizing the same form, with the resulting top three design-build firms being scheduled and interviewed by the City Commission. The Commission will grade and rank the three. They will then begin negotiations with the number one ranked firm utilizing the design criteria package and all other applicable cost, technical and design data. c. For projects "bid" utilizing the design criteria package the lowest bid received from a qualified design-build firm, meeting all requirements and specifications of the design criteria package (cost, technical and design) shall be awarded the project. However, the City reserves the right to reject any and all bids. 3. These rules may be amended as required. APPENDIX "A" RESOLUTION 630 STANDARD EVALUATION FORM Firm Number Firm Name A. Availability B. Staff experience and capabilities C. Firm experience in similar projects D. Length of time office in Central Florida has been in existence E. Number of Architectural and Engineering personnel in Central Florida F. Number, type and size of Central Florida municipal or county buildings designed by firm in past 15 years. G. Method of approach to the Winter Springs project. Instruction to Graders: The grade you give to each of the above seven categories is subjective. Some may think a large firm is ideal, others a small or medium size firm, etc. Grade each category from I to 10 with lO as a maximum or most desirable and I as the least desirable grade. Total the grades and place it below. Name of Grader Total Grade Comments: REVISED 12/89