Loading...
HomeMy WebLinkAboutArchitects Design Group Public Safety Facility - Additonal Services 1997 07 25 \(\c' G\(jJ.?' '9(\ , , eC~Q0~ ~C;~q1 ~~ ~s o ,?\0'0'0 0'0 '~ec's p...~c'(\\ ,I p...\,p... eS'" \;Zee'-J \,s'f.. ell1 plesid p...\p.... \;Zo'i\C;p0. ~e'-J\0 'dell1 !'JleS\ c '\1\ , t' ce r \jeo "I \;Zee W0~' \ swcv:. 'dell1 . pleSI \liCe ~",o0 \.- DO \ell'l '1lel COll110 ollce o p..sslJl 9\0 '?Joc QlJoli'i'l sel tol ot C S. s Oilec \\ C. . l'ViCe coo\?el ~iCol 5e ,~jo'l f \6cl'1 \"', 10\ Oilecto \.\e ?-,\'0 S p...'-Je0 o.'?Jo'f.. '\ ~00~\e ;,?-IQ'0 ? 'l. \;'\01'i0 <;:\0</:,.0 ;,;,-.J ,?01V-, ob 'l'l\0\61 b.l-'\1 b.'011 b fJfJ?-fJ \e\' ill bb.fJ- " b.'0 <;:0'" July 25, 1997 Mr. Don LeBlanc CITY OF WINTER SPRINGS 1126 E. State Road 434 Winter Springs, Florida 32708 Re: Winter Springs Public Safety Facility Additional Services - Security Hardware System ADG Project No. 534-93/2.1 Dear Don: As you are aware, we are currently engaged in the effort of developing an analysis of the specific needs of the Police Department in regards to the security hardware requirements. To date, we and our consultants, as well as yourself and others within the City staff, have spent quite a bit of time on this issue. Weare fully aware of the magnitude of importance these components are to the completion of the project and are prepared to provide the necessary design input, coordination, and supervision required for the completion of the security hardware system. At the beginning of our collaboration with the City on this project, the direction we were given was that the City had several of the integral consultants already under contract to provide services to the City (specifically, ADT, Motorola, and Omnicom). Subsequently, our consulting Engineer was directed to design a Security Conduit System that would enable the City's Security Consultant to have the means to wire the electronic components of the security hardware system of their design. The City's Security Consultant, ADT, has clearly stated their scope of services to include only the security camera system. It is unfortunate that this integral component to the funtionality of the facility was not a consideration under our scope at the beginning of the project. As I am sure the City will attest, this situation is not unlike that of the communications change order that resulted from similiar circumstances. Don, as I previously mentioned, we are fully prepared to complete the effort which has already begun, to ultimately bring this issue to closure in a manner that is satisfactory to all parties involved. The magnitude of the efforts required by ADG and our consulting Engineers to complete this endeavor requires us to submit this proposal to the City for additional service compensation at this time. Mr. Don LeBlanc CITY OF WINTER SPRINGS July 25, 1997 page two The Scope of Services shall include the following: Develop with the Police Department the requirements and needs of the Security Hardware System. Coordinate the design and integration of the Security Hardware System with the City's Communications Consultant. Coordinate with the General Contractor and the Security Hardware provider the individual components of the system. Supervision of the Installation. The hourly fee schedule that these Additional Services require is as follows: ADG Principal Project Manager 9 hrs. at $125.00 per hour.............................$1125.00 30 hrs. at $65.00 per hour...............................$1950.00 S u b- T otal.... ... ............ ........ ... ... ........... ...... ....... ... .... ...... .................. ................ ...... .....$3075.00 O.C.I. Consulting Engineers Project Engineer 10 hrs at $85.00 per hour................................$850.00 Total..... ..... ........................... ... ............... ....... .... ............ ... ..... ........ .................... ..... ....$3 925. 00 Don, as you are aware, we have already spent considerable effort in meetings with the consultants and the Police Department to resolve this issue. We have considered this our collaborative contribution to the success of this project. The magnitude and sophistication of the Security Hardware System, however, requires us to respectfully submit this proposal for the services previously outlined. Mr. Don LeBlanc CITY OF WINTER SPRINGS July 25, 1997 page three Don, we would appreciate the City's consideration of this proposal. We are prepared to immediately provide the time and effort required to complete the endeavor which has already begun. If you have any questions or require any further information, please contact either Keith Reeves or myself at your earliest convenience. If upon review this proposal is acceptable, please sign this document below and we will acknowledge this as our notice to proceed. I remain, sincerely, ~A.~ Ian A. Reeves Project Manager ~A.~ Ian A. Reeves Project Manager r. Ronald W. McLemore City Manager - City of Winter Springs, Florida cc: I.S.K. Reeves V, Terry Dawson - ADG Darius Adams - OCI Consulting Engineers July 30, 1997 To: City Clerk . ~ Land Development Coordinato~ From: Re: Architects Design Group Additional Service - Security Hardware System Attached for your records is that agreement, dated July 25, 1997, for additional services for the security hardware system for the public safety complex. ~