Loading...
HomeMy WebLinkAboutArchitects Design Group Public Safety Complex -1996 09 13 cJ.lQ, \{\G' rf}.9(\G\ ....Qe ~eG\" ~'C~\\q1 pJ'-G\7-' e~S o ?\o'0'0 0'0 \Wc\S NC'0 p,.\.p,.. es-..J , ~ee'-J \~f-: e0' p(eSl6 p,.\.p,.. ~O\1900' ,/ e'-J10 . 6e0' " o(eSI -..J\ ,rce r e'-JeS "I v.. ~e ':1-\00 . \ S\OG '6e0' . o(eSI \liCe r d0Ce oCO . p..ssu( 91o'i'> Qud\lt'Y sel o( 01 c~' '(ec' \\ C. ^/ices 01 coo?el' icdl sel . ~)o'/ fleC\10 . cW(o p,.. Ol(e \D~' . eS '0'0ge0' D serJIC seo0 1 Cp.. '(ecIO( 0 01 \!'lOIO .. \\e S. dge( ~oe tv\d0 O<<iCe ~s00 \.. DO \611'/ 'I\e( C00'(0 0e '\7-'\0 S p,.'-Je0 O. 'i'>o'i- v..00\IJ\e d '2>7-1q\J " . ~0,,'0 "r\OI\O '2>'2>'2> "OIV-, \p ..110\el t.1-'\1 \I' t.011 b <;:;f::;7-S \6\' ~ Ibt.S- .,J t.O "ro/' September 09, 1996 Mr. Don LeBlanc Land Management Specialist CITY OF WINTER SPRINGS 1126 East State Road 434 Winter Springs, Florida 32708 RE: Winter Springs Public Safety Complex A.D.G. Project No. 534-93 Dear Don, As per your request, we have reviewed the documents provided to us by Carl Gill, consultant to the City of Winter Springs, pertaining to the data and communication systems. We offer to provide the required Architectural Coordination services as outlined below. Construction Observation 16 Hrs. X $58.00/Hr. $928.00 (includes meetings, past and future) Project Architect 6 Hrs. X $65.00/Hr. $390.00 Computer Draftsman 6 Hrs. X $52.00/Hr. $312.00 Specification 4 Hrs. X $58.00/Hr. $216.00 Sub- Total = $1816.00 OCI Consulting Engineers, Inc. = $1800.00 (See attachment for hourly fee breakdown) Total = $3616.00 Mr. Don LeBlanc CITY OF WINTER SPRINGS RE: Winter Springs Public Safety Complex September 09, 1996 Page two These figures represent the Architectural Coordination services only. They do not include any "in-the- field" coordination as may be required at a later date. This figure also does not include the Coordination fee as pertaining to the disciplines of Mechanical, Electrical, and Fire Protection. A copy of our consultants proposal is included for your review. We, as well as our consultants, are prepared to begin coordinating the services required to accommodate the proposed communications systems layout and support functions. If you require any further information, please contact us at your earliest convenience. I remain, sincerely, ~N,4. ~ Ian A. Reeves Project Manager Accepted by: Date: R,j1A(~ 5t \~~~ 3 September 1996 CONSULTING ENGINEERS Mr. Keith Reeves Architects Design Group 333 N. Knowles Ave. Winter Park, FL 32789 Re: Additional Services Fee Proposal Winter Springs Public Safety Complex Dear Keith, We have based this proposal on the requirements of adding a wall in Room 148 for the Telecommunications Room, required security changes and for cable tray & data outlets. Our fee for the required mechanical, electrical and fire protection engineering will be One Thousand Eight Hundred Dollars ($1,800.00). An hourly breakdown ofthis fee is as follows: Mechanical Engineering 2 Hours x $90.00 $180.00 CAD 4 Hours x $45.00 $180.00 Electrical Engineering 12 Hours x $90.00 $1080.00 CAD 8 Hours x $45 00 $360 00 Total Fee $1800.00 Should you have any questions or comments, please do not hesitate to call. Accepted by /Z(/I~ 1V1~ r azeminia, P.E. President OCI Associates, Inc. ORLANDO 427 Whooping Loop, Suite 1825 . Altamonte Springs. FlOrida 32701 (407) 332-5110 Fax (407) 332-7704 FT PIERCE 2030 Harbonown Dr, Suite D . Fe Pierce, Florida 34946 (561) 466-1165 Fax (56l) 466-1164 WEST PALM BEACH 2669 Forest Hill Blvd, Suite 225 . West Palm Beach, FlOrida 33406 Phone/Fax (56l) 963-9800 September 30, 1996 To: City Clerk @, .. ",,--, Land Management S pecialis From: Re: Public Safety Complex Additional Contract with Architects Design Group (Add wall to Room 148, security changes and cable trays and data outlets) Attached for the permanent files of the Public Safety Complex is the above referenced additional contract with Architects Design Group in the amount of$3,616.00 dated September 9, 1996 and signed by the City Manager on September 13, 1996.