HomeMy WebLinkAboutAmerican Drilling, Inc. Change Order No. 3 -1997 04 07 CONTRACT CHANGE ORDER Change Order No. 3 Engineer Project No. W0446.01 Project Title: Water Supply Well No.6 Contractor: American Drilling, Inc. Reason for Change: Additional items are required due to unforeseen below surface conditions. Breakdown of Proposed Changes and Basis for Payment (Includes pertinent drawings, specifications, and documentation where necessary) Item No. and Description Change in Contract Cost + (-) Deletions: Item 4: Revise quantity to 2. Delete I @ $250.00 Item 7: Revise quantity to 52 ft. Delete 48 ft @ $83.00/ft. Item 8: Revise to 95 ft. Delete 15 feet @ $23.00/ft. Item 9: Revise quantity to 89 ft. Delete 121 ft @ $28.00/ft. Item 10: Revise quantity to 120 sacks. Delete 150 sacks at $12.00/sack Item 11: Revise quanity to 103 ft. Delete 117 ft @ $16.00/ft. ($250.00) (3,984.00) ($345.00) ($3,388.00) ($1,800.00) ($1,872.00) ($11,639.00) TOTAL DELETIONS: Additions: Item J. Geophysical Well Logging 16" Well Item K. Remobilization/demobilization of drill rig Item L. Mobilization of special grout equipment Item M. Backfill well for pressure grout, 8cy @ $50.00/cy Item N. Pressure grout well per SJRWMD. 120 sacks at $12.00/sack Item O. Drill out sand backfill - 129 ft @$10.00/ft. Item P. F & 110" casing - 170 ft @ $24.00/ft. Item Q. Cement 10" casing, 286 sacks @ $12.00/sack Item R. Drill a 9-7/8" open bore hole - 150 ft @ $15.00/ft. Item S. Provide left hand coupling and nipple Item T. Geophysical log of 10" well Item U. F & I and remove test pump. $ 2,000.00 9,000.00 5,000.00 400.00 1,440.00 1,290.00 4,080.00 3,432.00 2,250.00 1,500.00 2,000.00 1,800.00 TOTAL ADDITIONS: $34,192.00 New contract completion date of January 17, 1997. (1) Total Proposed Change in Contract Cost +(-) $ $ $ 22.553.00 (2) Original Contract Price 130.000.00 (3) Total All Previous Change Orders (Change Order No.1 thru 2) 9.269.10 Accepted By Owner: Date: $ 161.882.10 ///r/9?o /1/6/fh //-h -";'y ~ (4) New Contract Price (Total ofItem 1 & Item 4) Recommended By Engineer: Accepted By Contractor: Date: Date: