HomeMy WebLinkAboutAdvance Construction Technology Change Order #1 -1998 05 12
CITY OF WINTER SPRINGS,
FLORIDA
CHANGE ORDER #1
TROTWOOD P ARK MULTI-PURPOSE BUILDING
BID NUMBER 98-017
CHANGE OF SCOPE:
1. Change slab to monolithic........................................................-$1,500.00
2. Credit for eliminating benches........ ......................................... .-$2,290.00
3. Provide CPVC in lieu of copper water pipes.............................-$ 200.00
4 . Value engineering..................................................................... -$3 ,200.00
a. Use all china fixtures
b. Use battery operated fixtures on lavatories and concealed
flush valves on water closets and urinals
c. Use woodard wall hydrant
d. Water closets to be wall hung with carrier
5. Eliminate water heater............................................................. -$ 200.00
DEDUCT TOTAL:
-$7,390.00
See attached quotation for change order #1 from Advanced Construction Technology.
SUMMARY:
Original Contract Amount...... ........... ....... ..... ...... .... .............. ......... .$75,999.00
Add Order... ......... .................................................................. ........... -0-
TOTAL....... ....... ..... ..................................... ..................................... .$7 5, 999 . 00
Deduct Change Order #1..................................................................$ 7,390.00
As of May 1, 1998 AMENDED TOTAL...........................................$68,609.00
Accepted:
Accepted:
:Ronald W. McLemore
City Manager
City of Winter Springs
Dale S. Jones
Vice President
Advance Construction Technology
Date: 5-4-98
Date:5-12-98