Loading...
HomeMy WebLinkAboutBruce McGonigal, Inc. Change Order No. Two -1998 03 13 c..l~;-,A. CONTRACT CHANGE ORDER Change Order No. Two Engineer Project No. #96-024 Project Title: Green&point Reclaimed Water Main Extension Drainage Improvements Contractor: Bruce McGoniaal, Inc. Reason for Change To bore and jack pipe under highwl\Y 434 to median for reclaimed water irrigation system Breakdown of Proposed Changes and Basis for Payment (Includes pertinent drawings, specifications, and documentation where necessary) Item No. and Description Change in Contract Cost +(-) 1 Jack & Bore 10 inch steel casing & insert 4 Inch ductile iron $4,670.00 pipe inside of casing. (1) Total Proposed Change in Contract +(-) $ (2) Original Contract Price $ (3) Total All Previous Change Orders(Change Order NO.1 thru..2....) $ 4,670.00 159,400.92 5,204.50 (4) New Contract Price(Total ofItem 1,2 & 3) $ 169.275.42 Accepted By Contractor: Date Accepted By Owner: ,;t ~ M ?tfI~ ~ Date sIn /" r /' , 3//r'8 / Recommended By Engineer: Date