Loading...
HomeMy WebLinkAboutBruce McGonigal, Inc. Change Order No. Three -1998 07 22 ~."S'T~~~:~,?, CONTRACT CHANGE ORDER c / pI'/,. # - Change Order No. Three Engineer Project No. W0467F Project Title: Contractor: Reason for Change: Greenspointe Reclaimed Water Main Extension Bruce McGoniial. Inc. See Descriptions Below Breakdown of Proposed Chanies and Basis for Payment (Includes pertinent drawings, specifications, anddocumentation where necessary) Item No. and Description Change in Contract Cost +(-) 1. Additional 95 LF of 4" PVC @ $7.60ILF installed @ intersection of + $722.00 Nighthawk Circle & Anhinga Road due to relocation of the 6" road crossing. 2. Additional 400 LF of 6" PVC @ $8.60ILF installed @ golf course + $3,440.00 due to field quantities differing from contract quantities. 3. Two (2) additional short single services @ $150.00/EA@ Osprey + $300.00 Lane/Nighthawk Circle & Nighthawk Circle/Sheoah Blvd. 4. Additional 72 SY asphalt @ $28.00/SY installed @ Wildwood + $2,016.00 Drive due to revised alignment of pipe. 5. Change an additional 157 LF of 6" PVC to DIP at a difference of +$1,318.80 $8.40ILF @ Nighthawk Circle & Anhinga Road due to the location of the existing water main. 6. Change 50 LF of 10" casing to 12" casing @ a difference of + $850.00 $17.00ILF @jack and bore due to special order materials. 7. Delay of contract completion date of24 days @ $200.00/day -($4,800.00) liquidated damages per project Specification Section 00500, 1.020. Subtotal: $3,846.80 8. Additional bond payment @ 2.1 % for Change Order Nos. 1 thru 3. $288.15 (1) Total Proposed Change in Contract Cost +(-) $ 4.134.95 (2) Original Contract Price $ 159.400.92 (3) Total All Previous Change Orders (Change Order No.1 thru No.3) $ 14.009.45 (4) New Contract Price (Total ofItem 2 and Item 3) $ 173.410.37 No Additional Contract Time Requested. Accepted By Owner: Date: Accepted By Contractor: Date: 7 ) Z,D /'16 , . ~h!1cj /#' Recommended By Engineer: Date: