Loading...
HomeMy WebLinkAboutBruce McGonigal, Inc. Change Order No. One -1998 01 30 ;",",0"'''''''_"'' """,,,~:~>,:,,;:~~.;.,::,. ,~c_ . ;"'~:?~Fi~Yf~<;]"r",~; ~~'~ - c Itrj(. CONTRACT CHANGE ORDER Change Order No. One Engineer Project No. W0467.01 Project Title: Contractor: Reason for Change: Greenspointe Reclaimed Water Main Extension Bruce McGoniflal. Inc. Existinfl water main locations different from contract drawinfls Breakdown of Proposed Chanfles and Basis for Payment (Includes pertinent drawings, specifications, and documentation where necessary) Item No. and Description Change in Contract Cost +(- ) 1. Change 80 LF of 12" pipe material at Wildwood Dr. and + $200.00 Tanglewood Road (Drawing #5) from C200 PYC at $ 19.50/LF to ductile iron at $22.00/LF. 2. Add one additional short single service at $150.00 EA and two + $530.00 additonal short double services at $190.00 EA, at Wildwood Dr. and Tanglewood Road. 3. Change 140 LF of6" pipe material at Anhinga Rd. and Nighthawk + $1,176.00 Circle (Drawing #6) from C200 PYC at $8.60/LF to ductile iron at $ 17.00/LF. + $2,798.50 4. Remove and replace sidewalk, curb and swale at Wildwood Dr. and Tanglewood Road due to revised alignment required by the lcoation of the existing 8" water main. 5. Additional labor required to repair 8" water main, remove + $500.00 installed 12" PYC and install 12" DIP at Wildwood Dr. and Tanglewood Rd. (44 Man Hours). (1) Total Proposed Change in Contract Cost +(-) (2) Original Contract Price (3) Total All Previous Change Orders (4) New Contract Price (Total ofItem 2 and Item 3) $ + 5.204.50 $ 159.400.92 $+ ~2nl.~ 0 Jp- $ 164.605.42 No Additional Contract Time Requested. Accepted By Owner: //~3/fB P'IJo Date: !/-St7/t('ff //1- Recommended By Engineer: Accepted By Contractor: W046701cha