HomeMy WebLinkAboutBergeron Land Development, Inc. Change Order 4 -1998 01 22
CONTRACT CHANGE ORDER
Change Order No.
4
Engineer Project No.
#97-017
Project Title: Hayes Road, Moss, and Panama Roads Pavinq and Drainaqe
Improvements
Contractor:
Berqeron Land Development, Inc.
Reason for Change Add casinqs for future water services, extend
Hayes Road driveway culvert, modify concrete driveway apron. and lower
Stoner Road culvert.
Breakdown of Proposed Chanqes and Basis for Payment
(Includes pertinent drawings, specifications, and documentation where
necessary)
Item No. and Description
Change in Contract
Cost +(-)
1. Install additional water service casings
for future services.
$2,451.15
2. Extend driveway culvert on Hayes Road
$612.80
3. Replace/install 6" concrete driveways
$1,312.38
4. Lower Stoner Road culvert.
$2,341. 79
(1) Total Proposed Change in Contract +(-)
(2) Original Contract Price
(3) Total Previous Change Orders ( NO.1 thru~
Recommended
By Engineer,
Contractor
$ 6.718.12
$ 449.000.00
$ 31,209.58
$ 486,927.70
Date 1/22/98
Date: Jan 26, 1998
.
Date 1/30/98
(4) New Contract Price(Total of Item 1,2 & 3)
Accepted By
Accepted By Owner: