Loading...
HomeMy WebLinkAboutBergeron Land Development, Inc. Change Order 1 -1997 09 11 CONTRACT CHANGE ORDER Change Order No. 1 Engineer Project No. W0458.00 Hayes Road. Moss Road and Panama Road Contractor Bergeron Land Development. Inc. Reason for Change: Additional footage required for 8" watermain for connection at existing line. Breakdown of Proposed Changes and Basis for Payment (Includes pertinent drawings, specifications, and documentation where necessary) Item No. and Description Change in Contract Cost +( - ) 1. Furnish and install 350 lineal feet of 8" C-900 PVC watennain with two 45 degree elbows. Relocate valve and jumper system to new location as shown on the revised drawings. $5,390.16 (1) Total Proposed Change in Contract Cost +(-) (2) Original Contract Price (3) Total All Previous Change Orders $ 5,390.16 $ 449.000.00 $ 0 $ 454,390.16 (4) New Contract Price (Total of Items 1,2 and 3) Recommended By Engineer: Date: 9/8/97 Accepted By Contractor: Accepted By Owner: Date:9/11/97 Date: W0446015.cha REceiVED SEP 2 4 1997 ~f\RECEIVED I \) SEP 1 5 1997~ , ..-.- --I Oil'; OF WitHER SPRINGS CITY ENGINEER CITY OF WINTER SPRINGS CITY ENGINEER "