HomeMy WebLinkAboutBergeron Land Development, Inc. Change Order 1 -1997 09 11
CONTRACT CHANGE ORDER
Change Order No. 1
Engineer Project No. W0458.00
Hayes Road. Moss Road and Panama Road
Contractor Bergeron Land Development. Inc.
Reason for Change: Additional footage required for 8" watermain for connection at existing line.
Breakdown of Proposed Changes and Basis for Payment
(Includes pertinent drawings, specifications, and documentation where necessary)
Item No. and Description
Change in Contract
Cost +( - )
1. Furnish and install 350 lineal feet of 8" C-900 PVC watennain with two
45 degree elbows. Relocate valve and jumper system to new location as
shown on the revised drawings.
$5,390.16
(1) Total Proposed Change in Contract Cost +(-)
(2) Original Contract Price
(3) Total All Previous Change Orders
$ 5,390.16
$ 449.000.00
$ 0
$ 454,390.16
(4) New Contract Price (Total of Items 1,2 and 3)
Recommended By Engineer:
Date: 9/8/97
Accepted By Contractor:
Accepted By Owner:
Date:9/11/97
Date:
W0446015.cha
REceiVED
SEP 2 4 1997
~f\RECEIVED
I \)
SEP 1 5 1997~ ,
..-.- --I
Oil'; OF WitHER SPRINGS
CITY ENGINEER
CITY OF WINTER SPRINGS
CITY ENGINEER
"