CONTRACT CHANGE ORDER
Change Order No. 1
Engineer Project No. W0449.01
Project Title: Winter Springs - Contract B Reclaimed Storage Tank
Contractor: The Crom C01:poration
Reason for Change:
Request by Owner
Breakdown of Proposed Changes and Basis for Payment
(Includes pertinent drawings, specifications, and documentation where necessary)
Item No. and Description Change in Contract
Cost + (-)
1. Change chainlink fence from galvanized to black vinyl with no barbed
wire at top. $ 3,761.50
2. Delete painting and make two coats of Thoroseal as the final tank coating. ($4,255.00)
3. Delete 24" gate valve and add 24" butterfly valve. ($2,000.00)
4. Provide new 24" restrained plug with 2-inch blow-off system. 1,480.00
5. Provide locking ladder gate at the bottom of the tank ladder. 130.00
(1) Total Proposed Change in Contract Cost +(-)
$ (883.50)
(2) Original Contract Price
$625.000.00
(3) Total All Previous Change Orders
$N/A
(4) New Contract Price (Total of Item 1 & Item 4)
$624.116.50
Recommended By Engineer:
~
~//~~
Date:
12/'-/9b
{--....fLolr (..
/..< >eJO/o/c::' j/t-
Accepted By Contractor:
Date:
Accepted By Owner:
Date:
END OF SECTION