Loading...
HomeMy WebLinkAboutCrom Corporation, The Contract Change Order No. 1 -1996 12 20 CONTRACT CHANGE ORDER Change Order No. 1 Engineer Project No. W0449.01 Project Title: Winter Springs - Contract B Reclaimed Storage Tank Contractor: The Crom C01:poration Reason for Change: Request by Owner Breakdown of Proposed Changes and Basis for Payment (Includes pertinent drawings, specifications, and documentation where necessary) Item No. and Description Change in Contract Cost + (-) 1. Change chainlink fence from galvanized to black vinyl with no barbed wire at top. $ 3,761.50 2. Delete painting and make two coats of Thoroseal as the final tank coating. ($4,255.00) 3. Delete 24" gate valve and add 24" butterfly valve. ($2,000.00) 4. Provide new 24" restrained plug with 2-inch blow-off system. 1,480.00 5. Provide locking ladder gate at the bottom of the tank ladder. 130.00 (1) Total Proposed Change in Contract Cost +(-) $ (883.50) (2) Original Contract Price $625.000.00 (3) Total All Previous Change Orders $N/A (4) New Contract Price (Total of Item 1 & Item 4) $624.116.50 Recommended By Engineer: ~ ~//~~ Date: 12/'-/9b {--....fLolr (.. /..< >eJO/o/c::' j/t- Accepted By Contractor: Date: Accepted By Owner: Date: END OF SECTION 0068l.for