Loading...
HomeMy WebLinkAboutEncore Construction Company Change Order 1 -1998 06 11 Engineer Project No. W0449.02 Project Title: City of Winter Smogs Reclaimed Water Improvements -Contract B Contractor: Encore Construction Company Reason for Change: See Itemized Description Below Breakdown of Proposed Changes and Basis for Payment (Includes pertinent drawings, specifications, and documentation where necessary) Item No. and Description Change in Contract Cost +(-) 1. Increase in Building Permit fee over bid allowance. $642.00 2. Additiona124" DIP & MJ CAP for future pumps at the $1,574.00 Distribution Pump Station. 3. Increase size of electricaUstorage building to 20' x 20'. $2,058.00 4. Furnish new breaker, starter, wire, etc. for the existing air $1,607.00 compressor. 5. Change the disconnect switch for the 5 HP motor at the chlorine $1,659.00 building. 6. Install a new control panel for the master lift station, including $16,949.00 new bubbler system controls, a generator receptacle, breaker and tenminal box. 7. Overlay approx. 1700 LF of existing service road w/6" of $39,831.00 limerock base and 1%" Type S-1 asphalt. Cost includes deduct. for clay stabilized areas. ., .,. , Cl~~k CONTRACT CHANGE ORDER S..i~`j~d0`1 Change Order No. 1 (1) Total Proposed Change in Contract Cost +(-) (2) Original Contract Price (3) Total All Previous Change Orders (4) New Contract Price (Total of Items 1, 2 and 3) (5) Original Contract Time (6) Additional Days Approved (Change Order No. = (7) Current Contract Time (8) Additional Days Proposed (9) New Contract Time (Total of Items 7 and 8) (10) New Construction Completion Date through No. _) $ 64,320.00 $ 1.065,400.00 $ 0.00 $ 1.129.720.00 240 Davs 0 Davs 240 Davs 10 Days 250 Days September 28. 1998 Recommended By Engineer: .. - A Date: / Accepted By Contractor: ~ Date: _~~~ / `~_ ~+co~a GervS+t . i~~~/' Accepted By Owner: Date: ~ /,5' W044902.CHA/wpo