HomeMy WebLinkAboutNatural Resources Conservation Service (NRCS) Amendment No. 2 -2009 05 07 AMENDMENT NO. 2
To
PROJECT AGREEMENT 69- 4209 -9 -1705
Between
CITY OF WINTER SPRINGS
And The
UNITED STATES DEPARTMENT OF AGRICULTURE
NATURAL RESOURCES CONSERVATION SERVICE
RE: Emergency Watershed Protection project resulting from Tropical Storm Fay.
This amends the Project Agreement 69- 4209 -9 -1705 between the above parties relative to the
Tropical Storm Fay Emergency Watershed Protection Project.
Clause A is amended to decrease the estimated construction cost by $180,000.00 and to read as
follows:
A. It is agreed that the following described works of improvement is to be constructed at an
estimated cost not to exceed $220,000.00
Location Description DSR No.
Bear Creek Stabilize eroded areas to prevent erosion and WS- SEM- 001FAY
remove debris to prevent flooding.
Gee Creek Stabilize eroded areas to prevent erosion and WS- SEM- 002FAY
remove debris to prevent flooding.
Clause B.8 is amended to increase the maximum value of in -kind technical services that will be
reimbursed to the Sponsor from not to exceed 7.5 percent to not to exceed 12.5 percent and to
read as follows:
5. Provide in -kind technical services (survey the site, design the project, develop engineering
plans and specifications, let and administer contracts, inspect work performed, certify the
completed work, and prepare as -built drawings). The maximum value of in -kind technical
services that will be reimbursed to the Sponsor will not exceed 12.5 percent of the actual
eligible construction cost from contracts for constructing the emergency watershed protection
measures described in Section A and in accordance with Section B.5 and B.6 of this
agreement. Costs for in -kind technical services utilized for Sponsor in -kind construction
services are not eligible for reimbursement.
Clause C.2 is amended to increase the NRCS' reimbursement for the Sponsor in -kind technical
services from not to exceed 7.5 percent to not to exceed 12.5 percent of the actual cost of
constructing the emergency watershed protection measures and to read as follows.
2. Provide the value of the Sponsor in -kind technical services not to exceed 12.5 percent of the
actual eligible construction cost from contracts for constructing the works of improvement
described in Section A and computed as described in B.8.
All other provisions of the Agreement remain unchanged.
REMAINDER OF PAGE IS INTENTIONALLY BLANK
1 of 2
APPROVED:
CITY OF WINTER SPRINGS
By: Kevin L. Smith
Title: City Manager Date: 4/30/09
This Action is authorized at an official meeting of the City Commission
on the 27th day of April 2009 at Winter Springs, Florida
State of Florida.
Date: 9/70/0"
(Sign ire) VVV
UNITED STATES DEPARTMENT OF AGRICULTURE
NATURAL RESOURCES CONSERVATION SERVICE
B Reviewed By: .„►��La
Carlos Suarez gra errill
Title: State Conservationist Title: Contracting -r
Date: ��9 Date: S d
2 of 2