CONTRACT CHANGE ORDER
Change Order No. 2
Engineer Project No. #97-023
Project Title: Lift Station #7W Improvements
Contractor: Prime Construction Group, Inc.
Reason for Change Replace inoperable 12" gate valves and rewire lighting and exhaust fan for
lift station drywell
Breakdown of Proposed Changes and Bac:;is for Payment
(Includes pertinent drawings, specifications, and documentation where necessary)
Item No. and Description Change in Contract
Cost +(-)
1. Remove 12" Gate Valves and install 6" Plug valves $2,239.15
2. Electrical upgrades including new circuit, lighting, wiring and $1,760.00
conduit with receptacles and refeeding exhaust fan.
(1) Total Proposed Change in Contract +(-) $ 3,999.15
(2) Original Contract Price $ 64,300.00
(3) Total All Previous Change Orders(Change Order No.1) $ 16,175.71
(4) New Contract Price(Total ofltem 1,2 & 3) $ 84,474.86
Recommended By Engineer: Date ///~/!8
Accepted By Contractor: Date I /'L-;/18
Accepted By Owner: Date /-.J '). -'ff /4--
~
City of Winter Springs Projeot #
LS #1W Improvements
(In OFIW'IN~f( SP.~I~GS
urr ST>N. '1 W"MRAOVElMiBNlIS
CPA tW04AS!. Q~
Change Order #2
Description
Worl<ed on opening and closing valve on Pump #2 discharge.
Tried using City's hydraulic pump to open cheekvalve.
Material: 8x4 flanges to connect pump: No Charge
City brought jet pump, opened cl1eck valve but could not
close it. Went to City at 1 :00 PM to discuss problem.
Worked on locating FM and bypass connection to FM.
Removed every other bolt on 12" discharge valves.
Cut 55 rods for owner furnished valves, helped set up Iwdraulie
pump, removed 12" gate valves, cleaned and scraped flange
faces of City furnished valves.
Removed two (2) 12" suction valves and prepped 6" plug
valves and installed.
TOTAL LABOR
75 hours Labor (Including burden) @ $15.00Jhr
Filler Flanges
Bypass Pump
Date
11/11/97
I 'v . ~.;:; J. 1""' . C/ c:
# Men # Hours Total
2 10 20
11/12/97
11/13/97
11/13/97
11/14/97
11/17/97
$ 1,125.00
$ 219.00
$ 580.00
$ 1,924.00
Contractor's Fee 15% $ 288.60
$ 2,212.60
Bond Premium $ 26.55
Total Adjusted Cost to Install New Valves on Suc/DischargG $ 2,239.15
Plus Electrical upgrades including new circuit, new lighting wiring
and conduit with recepticles and refeedlng existing fan.
S 1,760.00
TOTAL. CHANGE ORDER #2 $ 3,999.15