Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Sunshine Building and Development Change Order Residential Reclaimed Water Main Extension -1997 02 03
~, CONTRACT CHANGE ORDER Change Order No. 1 Engineer Project No. W0451.00 Project Title: Residential Reclaimed Water Main Extension Contractor: Sunshine Building and Development Reason for Change: Additions, Field Changes and Quantities Adjustments Breakdown of Proposed Changes and Basis for Payment (Includes pertinent drawings, specifications, and documentation where necessary) Item No. and Description Change in Contract Cost + (-) 1) Add 240 LF of 6" PVC @ $9.81/LF $ 2,648.70 2) Add 1 - 4" Gate Valve $ 390.97 3) Add 4 Driveways 80 LF @ $8.94/LF $ 715.20 4) Add 7 Long Double Services @ $531.56/ea. $ 3,720.92 5) Add 14 Short Double Services @ $306.25/ea. $ 4,287.50 6) Delete 14 Short Single Services @ $153.81/ea. $ (2,153.34) 7) Delete 2 Long Single Services @ $591.66/ea. $ (1,183.32) (1) Total Proposed Change in Contract Cost +(-) (2) Original Contract Price (3) Total All Previous Change Orders (41 New Contract Price (Total of Item 1 & Item 4) Recommended By Engineer: Accepted By Contractor: Accepted By Owner: $ 8.426.63 $ 121.920.50 $ N/A $ 130.347.13 ,G ~' ~ Date: /~~~rl ~ i q ?~. ~ ate: .~ ~ 3 ~ / ~ ~/ Date: /~ C 193600.cha