Project Title:
Agnaement Date:
CHANGE ORDER FORM
Central Winds Stormwater Piping
16 March 2004
Sunshine Building and Development
Corporation
G~:-~;'~~~:;"~"/! r:_':i~::,~ dr~ .:~ ~~.~.~<
Change Order No: 3
Contractor.
ThIs Change Order is necessary to cover changes In the 'NOrk to be performed under this
Agreement. The GENERAL CONDITIONS. SUPPLEMENTARY CONDlilONS, and
STANDARD SPECIFICATIONS apply to and Qovem all work under this Change Order.
Reason for Change:
Entrance modifications to Central Winds Park required prior to Seminole County work on Cross
Seminole Trial.
THE FOLL~NG CHANGES A~~ ~ADE TO THE CONTRACT DOCUMENT~
Item No. and DeSCription Change in Change In
Contract Price Contract Time
1. Removal of gate from trial entrance and install at
park entrance, replace fence where gats removed
2. Remova180 If of sidewalk and install 120 If of
sidewalk.
3. Remove 120 If of existing Miami and median curb
and Install 21 0 If of Miami and median curb.
4. Remove existing road base anet asphalt 155 ay.
5. Install 12" stabilized base (494 sy) and 8" IImerock
base (470 sy)
6. Install 1 % " type 5-3 asphalt (470 sy)
7. Remove existing 15" oak tree, hedge and stumps
Lump sum for all items $28.966.80 30 Days
1. Original Contract Price
2. Current Contract Price (Adjusted By Previous Change Orders)
3. Total Proposed Change In Contract Price
4. New Contract Price (Item 2 plus Item 3)
5. Origlna' Construction Completion Date
6. Original Contract Time
7. Current Contract Time (Adjusted By Previous Change Orders)
8. Total Proposed Change in Contract Time
9. New Contract Time (Item 6 plus Item 7)
10. New Construction Completion Date
$254,716.34
$278.511.35
$28,966.80
$307,478.15 .
9 November 2004
120 Days
182 Days
92 Da~
212 Days
9 February 2005
11/23/2004 17:56
~
4073276695
CITY HALL EAST
PAGE 03/03
- ,
'-"
"wi
. WAIVER This Change Order coMtltutes full and mutuaJ aCCOrd and satisfaction for the
adjustment of thca Contract Priee and Contract Time as a result of increases or daCt'8asas in
CClst and time of pwfonnanee caused directly and indll'8ct1y from' the change. Acceptance of
this WaIver constitutes an agreement between OWNER and CONTRACTOR that the Change
Order represents an equitable adjustment to the Agreement and that CONTRACTOR shall
waive all right. to file a Contract Claim or claim of any nature on this Change Order. Execution
of this Change Order aha" conatituta CONTRACTOR' . complete acceptance and satisfactfon
that It Is entitled to no more costs or time (direct, indirect, Impact, etc.) pursuant to this Change
Order.
APPROVAL AND CHANGE ORDER AUTHORIZATION
ACKN~D~MENTI
The aforementioned Chang., and werk affected thereby, is subject to all provisions of the
original Agnaement and specifically Changed by this Change Order; and It Is e~ressly
understood and agreed that the approval of the Change Order shall have no effect on the
original Agreement other than mattet3 expA!fssly provfded herein.
Recommended By:
Engineer
~~. !t.l4!
Date
orks
I:J-./J-/(fl}
Date . . .
I~';:;Y
Da '
ATTEST:
i~ c. f~
(secretary)
November 24, 2004
Date
(Corporate Seal)
Date
A TreST:
Ii.! A_~ ~tL<d tta.j
L~m~
By Ronald W. Mcle~re,
City Manager . ,_ -
I~ - ;J- i;i
Date
/01-~ -() Sf-
Date