HomeMy WebLinkAboutWatauga Company Agreement Bid Number 95-012w' J .' SECTION 00500 AGREEMENT Bid Number 95-012 Restroom Facility It is intended that payment for all work done under the Contract Documents, including the furnishing of all labor, equipment and materials, and the performing of all operations in connection with the construction of the restroom facility and the septic system will be made under the following Lump Sum Bid. The CONTRACTOR agrees to perform all of the WORK described in the CONTRACT DOCUMENTS and comply with the terms therein for the BASE BID total lump sum price of 559,557.00. The Owner reserves the right to alter the Plans, extend or shorten the improvement, add such incidental work as may be necessary, and increase or decrease the work to be performed to accord with such changes, including deductions or additions to the scope of work outlined in the Contract Documents. Changes in the work shall not be considered as a waiver of any conditions of the Contract nor invalidate any provisions thereof. Changes resulting in changes in the scope of quantities of Work or time or other conditions of work will be basis for consideration of a Change Order which is to be negotiated and executed before proceeding with the work. Work which has not been authorized by a written Change Order will not be subsequently considered for additional payment. The CONTRACTOR will commence the work required by the Contract Documents within 10 days after the date of the NOTICE TO PROCEED and will complete the same within 120 calendar days unless the period for completion is extended otherwise by the Contract Documents. As provided for in the General Conditions, it is expressly understood that actual damages will be sustained by the OWNER upon the CONTRACTOR's failure to complete construction within the time stipulated. Should the CONTRACTOR fail to complete the construction in the stipulated time period, the OWNER shall be entitled to recover from the CONTRACTOR, the sum of one hundred dollars ($100.00) for each calendar day the work remains uncompleted after the stipulated construction period; which amount is hereby agreed upon as a measure of the liquidated damages that the OWNER will sustain by reason of any such failure of the CONTRACTOR as stated before; further, it is understood and agreed that said sum is not considered in any sense to be a penalty. The Contractor shall take no advantage of any apparent error or omission in the Plans, Specifications or Contract Documents and the Engineer shall be permitted to make such corrections and interpretations as may be deemed necessary for the fulfillment of the intent of the Contract Documents. The undersigned agrees that his bid as stipulated herein shall be valid for a period of sixty 160) days from the date of this bid opening. The proposal guaranty of the three lowest bidders shall be held for a maximum of 60 days or until an award of the contract is made if awarded sooner. CONTRACTOR acknowledges receipt of addendas issued as follows: No. ,~ ,dated 2 g ~tov • 19 h~. No. ,dated 19 No. ,dated 19 Progress payments will be made in an amount equal to 90°~ of the value of Work completed, less, in each case, the aggregate of payments previously made. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns. 00500-1 k ~+Acceptance of this proposal, as indicated by the Owner's signature below, shall constitute a working agreement between the Owner and the Contractor for the construction of the proposed facilities. The Owner reserves the right to reject any or all bids on the project. FOR THE CONTRACTOR: FOR THE OWNER: This bid made by and on behalf of: Accepted at 1i~~'R.See~S Florida, The Watauga Company BY: ~ ~ • ~~t~CO NAME:Elizabeth A. Snodgrass (Please Type) this b 19~.Ss ~~ ~ ~ BY: NAM John Govoruhk (Please Type) TITLE: President ATTEST NAME: Lynn A. Snodgrass TITLE: Secretary/Treasurer DATE: 5/22/95 TITLE: Citv Manager ATTEST: ~ ~ MraJ NAME: 0 R~Ng TITLE: DATE: l7 'O~~G -~s~ (SEAL) (SEAL) END OF SECTION 00500-2 __ _ _ ,~ ~ SECTION 00500 AGREEMENT Bid Number 95-012 Restroom Facility It is intended that payment for all work done under the Contract Documents, including the furnishing of all labor, equipment and materials, and the performing of all operations in connection with the construction of the restroom facility and the seotic system will be made under the following Lump Sum Bid. The CONTRACTOR agrees to perform all of the WORK described in the CONTRACT DOCUMENTS and comply with the terms therein for the BASE BID total lump sum price of $59,557.00. The Owner reserves the right to alter the Plans, extend or shorten the improvement, add such incidental work as may be necessary, and increase or decrease the work to be performed to accord with such changes, including deductions or additions to the scope of work outlined in the Contract Documents. Changes in the work shall not be considered as a waiver of any conditions of the Contract nor invalidate any provisions thereof. Changes resulting in changes in the scope of quantities of Work or time or other conditions of work will be basis for consideration of a Change Order which is to be negotiated and executed before proceeding with the work. Work which has not been authorized by a written Change Order will not be subsequently considered for additional payment. The CONTRACTOR will commence the work required by the Contract Documents within 10 days after the date of the NOTICE TO PROCEED and will complete the same within 120 calendar days unless the period for completion is extended otherwise by the Contract Documents. As provided for in the General Conditions, it is expressly understood that actual damages will be sustained by the OWNER upon the CONTRACTOR's failure to complete construction within the time stipulated. Should the CONTRACTOR fail to complete the construction in the stipulated time period, the OWNER shall be entitled to recover from the CONTRACTOR, the sum of one hundred dollars ($100.00) for each calendar day the work remains uncompleted after the stipulated construction period; which amount is hereby agreed upon as a measure of the liquidated damages that the OWNER will sustain by reason of any such failure of the CONTRACTOR as stated before; further, it is understood and agreed that said sum is not considered in any sense to be a penalty. The Contractor shall take no advantage of any apparent error or omission in the Plans, Specifications or Contract Documents and the Engineer shall be permitted to make such corrections and interpretations as may be deemed necessary for the fulfillment of the intent of the Contract Documents. The undersigned agrees that his bid as stipulated herein shall be valid for a period of sixty (60) days from the date of this bid opening. The proposal guaranty of the three lowest bidders shall be held for a maximum of 60 days or until an award of the contract is made if awarded sooner. CONTRACTOR acknowledges receipt of addendas issued as follows; No. 1. ,dated ZS Nov 19 Y ~ . No. ,dated 19 No. ,dated 19 Progress payments will be made in an amount equal to 90°~ of the value of Work completed, less, in each case, the aggregate of payments previously made. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns. 00500-1 ,. !_ ~. Acceptance of this proposal, as indicated by the Owner's signature below, shall constitute a working agreement -. batween the Owner and the Contractor for the construction of the proposed facilities. The Owner reserves the right to reject any or all bids on the project. FOR THE CONTRACTOR: This bid made by and on behalf of: The Watauga Company NAME: Elizabeth A. Snodgrass (Please Type) TITLE: President FOR THE OWNER: Accepted at 4 Florida, this 19~s~ BY: ' s NAME: John Govoruhk (Please Type) TITLE: Citv Mananer ATTE l.~ NAME: Lynn A. Snodgrass TITLE: Secretary/Treasurer DATE5/22/95 ...~ 0~"v ATTEST: •~- NAME:, M. 't ~~S TITLE: DATE: 5~.~ ~' Y~ (SEAL) (SEAL) END OF SECTION 00500-2