REQUEST: Public Works Department Requesting Authorization to enter into a Contractual
Agreement for Traffic Calming Improvements
PURPOSE: The purpose of this Board item is to request authorization to enter into a contractual
agreement with A.P.E.C. Inc. for the Traffic Calming Improvements Project at a cost
of$108,231.2 plus a 10% contingency.
CONSIDERATIONS:
This project is needed to address residents concerns about cut through and speeding
traffic on Wade Street, Sherry A venue, and Edgemon Avenue. Three types of installations are
proposed; traffic circles, pavement narrowings and landscaped medians. A combined total of
twelve installations are proposed in this project.
Bids for this project were opened on June 23, 1999 under Bid # ITB-013-99-KL. The
City Clerks summary is attached. The lowest bid was $108,231.20 by A.P.E.C. Inc. of
Orlando, which was below the engineer's estimate of$125,000.
The project scope of work includes the installation of three medians and two traffic
circles on Sherry Avenue; one pavement narrowing, one traffic circle, and one median on
Wade Street; and two medians and two traffic circles on Edgemon A venue. Each installation
includes landscaping comprised of crape myrtles, ligustrum, hawthorne, liriope and coontie.
Irrigation will be done by City crews.
July 12, 1999
Consent Agenda Item B
Page 2
The Capital Projects Coordinatorrecommendation is also attached as well as the details of the
different types of traffic calming devices to be installed.
FUNDING:
The bid cost of$108,231.20 is less than the engineer's estimate of$125,000. The
funds for this project will be from the $300,000 designated in the Improvement Refunding
Revenue Bond Series 1999. Funds will be expended within 120 days of issuance of the
Notice to Proceed.
RECOMMENDATION:
It is recommended that authorization be granted to enter into a contractual agreement
with A.P .E.C. Inc. for the Traffic Calming Improvements Project at a cost of $1 08,231.2 plus
a 10% contingency payable from the Improvement Refunding Revenue Bond Series 1999.
IMPLEMENTATION SCHEDULE:
The scope of work will be completed within 90 days of issuance of the Notice to
Proceed. The construction will be occurring during normal working hours. Temporary traffic
detours maybe required which will be coordinated with Public safety personnel.
ATT ACHMENTS:
1. City Clerk Summary - Bid #ITB-013-99-KL
2. Proposal and Agreement
3. Capital Project Coordinator Recommendation
4. Traffic Calming Details
COMMISSION ACTION:
A TT ACHMENT NO. 1
CITY OF WINTER SPRINGS, FLORIDA
1126 EAST STATE ROAD 434
WINTER SPRINGS, FLORIDA 32708-2799
Telephone (407) 327-1800
TRAFFIC CALMING IMPROVEMENTS
BID NUMBER: ITB-013-99/KL
BID OPENING DATE: June 23,1999
The Bid Opening Was Called By: Ms. Nancy Vobornik
Purchasing Department
Bid Opened:
Bid Closed:
3:01 p.m,
3:03 p.m.
Two(2) Bids Received:
1. CATHCART CONTRACTING COMPANY
1757 WEST BROADWAY STREET, SUITE 3, OVIEDO, FLORIDA 32765
TELEPHONE: (407) 366-1022
FACSIMILE: (407) 977-8349
BASE BID: $326,900.00
2. A.P.E.e. INC.
7819 THICKER LANE, ORLANDO, FLORIDA 32819
TELEPHONE: (407) 522-0530
BASE BID: $108,231.20
One (1) No Bid Received:
1. LINEAR DYNAMICS INC.
79 MONTGOMERY STREET, MONTGOMERY, PENNSYLVANIA 17752
TELEPHONE: (570) 547-1621
F CSIMILjL(570) 547-1629
Copy: Mr. Kipton D. Lockcuff, P,E" Director, Public Works/Utility Department
Ms. Nancy Vobornik, Purchasing Department
DOCSlbids/rcsulls/ry9899/99-0 13.doc
A TT ACHMENT NO. 2
SECTION 00500
AGREEMENT
THIS AGREEMENT MADE THIS DAY OF , 199_ between the CITY OF
WINTER SPRINGS of 1126 East State Road 434, Winter Springs, Florida 32708, Seminole County,State
of Florida, herein referred to as OWNER and A.P.E.C..Inc. of Orlando./. Florida, herein referred to as
CONTRACTOR, a person duly licensed as a Contractor in the State of Florida, as follows:
1. DESCRIPTION OF WORK - CONTRACTOR shall perform the work, in accordance with the
Contract Documents, for the construction of the Traffic Calming Devices.
2. CONTRACT DOCUMENTS - The Contract Documents consist of this Agreement; all Technical,
General and Supplementary Conditions and Sections contained in the Project Manual; the Drawings as
listed on the Bid Form and Index to Drawings; all Addenda issued prior to and all Change Orders issued
after execution of this Agreement. These form the Contract and are incorporated into this Contract by
this reference.
3. CONTRACT TIME - The CONTRACTOR shall begin work within 10 calendar days after the
issuance of a written Notice to Proceed and shall complete the work within 90 calendar days from
the date of the Notice to Proceed. Extensions, if any, are authorized by OWNER, and may only be granted
in writing.
4. LIQUIDATED DAMAGES - OWNER and CONTRACTOR recognize that time is of the essence of
this Agreement and that OWNER will suffer financial loss if the Work is not substantially complete within
the time specified in Paragraph 3 above, plus any extensions thereof allowed in accordance with the
General Conditions. They also recognize the delays, expense, and difficulties involved in proving in a legal
or arbitration proceeding the actual loss suffered by OWNER if the Work is not substantially complete on
time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated
damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER $100.00 for each day that
expires after the time specified in Paragraph 3 for substantial completion has expired until the work is
finally complete and the Substantial Completion Certificate has been issued and that OWNER has paid to
CONTRACTOR the consideration of Ten ($10.00) Dollars as consideration for this provision.
5. CONTRACT PRICE. LUMP SUM CONTRACT - The OWNER will pay the CONTRACTOR in
current funds for the performance of the work, subject to additions and deductions by Change Order,
the Total Contract Price of One Hundred Eiqht Thousand Three Hundred Twenty One and 20/00
Dollars ($ 108.231.20 ). Payments will be made to the CONTRACTOR based on the Lump Sum Bid
amount, the Schedule of Values, and subject to completion of the work, in accordance with the
Contract Documents.
6. PROGRESS PAYMENTS - OWNER shall make progress payments on account of the contract price
to CONTRACTOR, on the basis of application for payments submitted to the City or their authorized
representative, by CONTRACTOR as the work progresses, and in accordance with the Contract Documents.
Progress payments may be withheld if:
(A) Work is found defective and not remedied;
(B) Contractor does not make prompt and proper payments to subcontractors;
(C) Contractor does not make prompts and proper payments for labor, materials, or equipment
furnished him;
(D) Another Contractor is damaged by an act for which Contractor is responsible;
(E) Claims or liens are filed on the job; or
(F) In the opinion of the City of Winter Springs, Contractor's work is not progressing satisfactorily.
7. FINAL PAYMENT - OWNER shall withhold up to 10% of the Contract Price throughout the project.
The Owner shall release 50%of the amount witheld upon issuance of the Substantial Completion
Certificate. The remaining 50% of the amount withheld shall be released with the Final Payment after the
issuance of the Final Completion Certificate. OWNER shall make final payment to CONTRACTOR within
thirty (30) days after the work is fully and properly completed, if the contract has been fully and timely
performed, but subject to the condition that final payment shall not be due until CONTRACTOR has
delivered to OWNER a complete release of all liens arising out of the contract, or receipt releases of lien
fully covering all labor, materials and equipment for which a lien could be filed, or in the alternative a
bond satisfactory to OWNER indemnifying him against such claims.
By making payments OWNER does not waive claims including but not limited to those relating to:
(A) Faulty work appearing after substantial completion has been granted;
(B) Work that does not comply with the Contract Documents;
(C) Outstanding claims of liens; or
(D) Failure of Contractor to comply with any special guarantees required by the Contract Documents.
CONTRACTOR, by accepting final payment, waives all claims except those which he has previously made
in writing, and which remain unsettled at the time of acceptance of payment pursuant to this contract.
8. DESIGNATION OF PROJECT DIRECTOR OR ARCHITECT OR ENGINEER: DUTIES AND
AUTHORITY - The duties and authority of the City are as follows:
a. General Administration of Contract. The primary function of the City is to provide the general
administration of the contract. In performance of these duties George F. Edwards, Capital
Projects Coordinator, is the City's Project Director during the entire period of construction. The
OWNER (City) may change the Project Director during the term of this contract.
b. Inspections, Opinions, and Proaress Reports. The OWNER shall be kept familiar with the
progress and quality of the work by CONTRACTOR and may make periodic visits to the work site.
The OWNER will not be responsible for the means of construction, or for the sequences, methods,
and procedures used therein, or for the CONTRACTOR's failure to perform the work in accordance
with the Contract Documents.
c. Access to Work Site for Inspections. The OWNER shall be given free access to the works site
at all times during work preparation and progress. The Project Director is not obligated to make
exhaustive or continuous on site inspections to perform his duties of checking and reporting on
work progress, and any such inspections shall not waive Owner's claim regarding defective work
by Contractor.
d. Interpretation of Contract Documents: Decisions on Disputes. The OWNER will be the initial
interpreter of the contract document requirements, and make decisions on claims and disputes
between Contractor and Owner.
e. Reiection and Stoppaae of Work. The OWNER shall have authority to reject work which in its
opinion does not conform to the Contract Documents, and in this connection may stop the work
or a portion thereof, when necessary.
f. Payment Certificates. The OWNER will determine the amounts owing to CONTRACTOR as the
work progresses, based on CONTRACTOR's applications and OWNER's inspections and
observations, and will issue certificates for progress payments and final payments in accordance
with the terms of the Contract Documents.
9. RESPONSIBILITIES OF CONTRACTOR - CONTRACTOR's duties and rights in connection with
the project herein are as follows:
a. Resoonsibility for Suoervision and Construction. CONTRACTOR shall be solely responsible
for all construction under this contract, including the techniques, sequences, procedures and
means, for the coordination of all work. CONTRACTOR shall supervise and direct the work, and
give it all attention necessary for such proper supervision and direction.
b. Discioline and Emoloyment. CONTRACTOR shall maintain at all times strict discipline among
his employees, and he agrees not to employ for work on the project any person unfit or without
sufficient skill to perform the job for which he was employed.
c. FurnishinQ of Labor. Materials. etc. CONTRACTOR shall provide and pay for all labor, materials
and equipment, including tools, construction equipment and machinery, utilities, including water,
transportation, and all other facilities and services necessary for the proper completion of work
on the project in accordance with the Contract Documents.
d. Payment of Taxes: Procurement of Licenses and Permits. CONTRACTOR shall secure all
licenses and permits necessary for proper completion of the work, paying the fees therefor.
CONTRACTOR warrants that it (and subcontractors or tradesmen, if authorized in the Contract
Documents) hold or will secure all trade or professional licenses required by law for CONTRACTOR
to undertake the contract work.
e. CONTRACTOR will provide written guarantee for work and materials for one (1) calendar year after
acceptance by OWNER.
10. BOND - CONTRACTOR shall supply a materials, performance and payment bond(s) in
accordance with Florida law and to the satisfaction of OWNER, in an amount specified in the Contract
Documents.
11. MEDIATION/VENUE - The parties agree that should any dispute arise between them regarding
the terms or performance of this Agreement, both parties will participate in a mediation. The parties
agree to equally share the cost of the mediator. Should the parties fail to resolve their differences
through mediation, then any cause of action filed hereunder shall be filed in the Circuit or County Court
for Seminole County, Florida.
12. NOTICES - Any notice or approval under this Contract shall be sent, postage prepaid, to the
applicable party at the address shown on the first page of this Contract.
Signed, Sealed and Delivered
in the presence of:
Contractor:
Name:
Address and Telephone:
Owner:
City of Winter Springs
By: Ronald W. McLemore
City Manager
1126 East State Road 434
Winter Springs, FL. 32708
407-327-1800
A TT ACHMENT NO. 3
MEMORANDUM
FROM:
(
Kip lockcuff, P.E. U
Utilities Director . ,.1
George F. Edwards ~ h A
Capital Projects Coordinator ~V to
Preliminary Bid Analysis, Bid # ITB"()13-99-KL
TRAFFIC CALMING IMPROVEMENTS
TO:
RE:
DATE:
24 June, 1999
On Wednesday, June 23,1999, the City of Winter Springs received bids for the
construction of traffic calming devices at various locations in the Western portion
of the City. Copies of the bids were supplied to my office for review.
EVALUATION OF RESPONSIVENESS
The low bidder, APEC,lnc (American Persian Engineers and Constructors) did
not provide a Florida Trench Safety Act Statement; however, this requirement
may be waived as there are no trenches to be constructed or protected under
this contract. Otherwise the required bid forms were complete and the bid may
be considered responsive.
EVALUATION QF RESPONSIBILITY
The low bidder APEC did not provide insurance with its bid, failed to provide the
required documentation relative to its financial ability to execute the work and did
not provide references. All of these documents are required for the evaluation of
responsibility of the contractor and, while normally a part of the bid package, may
be submitted after opening of the bids but before the award of the contract.
The following is a summary of the two bids received. Both bids met the criteria
for responsiveness.
Contractor Base Bid Price
Cathcart Construction Co. $326,900.00
AP.E.C. $108,231.20
The Engineer provided the City with a budget estimate of $125,000.00. An
attached bid tabulation is provided for your review.
EPEC,lnc. has not performed previous work for the City, therefore a review of all
facets of bidder responsibility must be addressed prior to awarding the contract
to this bidder. No references for the evaluation of previous work 'Were given.
FU~DING
The bid of $108,231.20 is above the amount approved for this project in the
Capital Improvements General Fund. The budgeted amount was $75,000.
(; ~;, ~ r", /
Rono'ft'Bl and Roplaoomant Fund
BUDGET
BID
$108,231.20
$75,000.00
RECOMMENDATION:
If the additional funds necessary to construct this project are authorized, it is
recommended that the City notify APEC,lnc. that it is the apparent low bidder on
this contract and request that all necessary information to prove bidder
responsibility be supplied immediately. We should review, in detail, the
contractor's proof of its ability to enter into a contract agreement to perform the
work under this contract and to provide the necessary insurance. This must be
done prior to the award of the contract.
A TT ACHMENT NO. 4
LANDSCAPED MEDIAN
2' TYPE . A. CURB
AND GUTTER (TYPICAL)
8. THICK TEXTURED
STAMPED CONCRETE
----.--
PROVIDE 2" PVC CASING
FOR IRRIGA nON
l EX,ISTING GRADE
( TYPICAL)
..- -. ....
--- ~_.~~... .'
7'
I ' ~ PROVIDE 2" PVC CASING
FOR IRRIGA TION
4'
7'
8'
8'
8'
24' EXISTING PAVEMENT AND CURBING
EXISTING
20' *
nPE "A" CURB
AND GUrrER
N
i!:
o
~
Cl
z
1=
III
X
w
:r
<..>
I-
<
2
I
I" . "
I ", "., ".,
I ' ,
-L,'..<..,.:.,.-;-".......
1 . . ". ,...
I
f
I'
N
LANDSCAPED MEDIAN
EXISTING CURB AND
GUTTER (TYPICAL)
SECTION/ELEVATION ," A-A"
SCALE: '"=5'
LIMITS OF PAVEMENT WIDENING
23'
20'*
EXISTING
~A
PAINT NOSING
WHITE (TYP.)
MA TCH EXISTING CURB
AND GUTTER TYPE
Co
. I
. I
I
I
"-:-'-:-'---t
I
I
. I
I
MA TCH EXISTING FLOI'.\.INE
ELEVA TIONS AT BOTH
ENDS (TYPICAL)
. Co .
L.A
8" THICK TEXTURED STAMPED CONCRETE
(COBBLE STONE PArrERN) COLORED THROUGHDU'
COLOR TO BE SELECTED BY OWNER
PROVIDE 2" PVC CASING
FOR IRRIGATION
PLAN
SCALE: 1"=10'
DETAIL W AW - TYPICAL LANDSCAPE MEDIAN
*NOTE: SOME MODIFICATION MAY BE REQUIRED TO TI-iESE LENGTHS
IN ORDER TO FIT BETWEEN EXISTING DRI\lEWA YS.
-:.:
...:"............
. .
EXISTING
PAVEMENT \
. ---~." .. ._-.-_. ....--..\..-.
PROVlDE 2- PVC CASING
FOR IRRIGATION
8" THICK TEXTURED
STAMPED CONCRETE
r EXISTING
PAvEt~ENT
..~~ -.. .. ...... .-. .... -... . ..
~." J
12.50'
40'
ELEV A TlON
SCALE: 1-:10'
LIMITS OF PAVEMENT NARROWING
EXISTING
12.50'
N
12..
i!:
o
~
c.:>
z
1=
VI
X
w
1
I
1
1
.1 -----
I
I
I
I.
I
U
t-
<(
:::!:
N
5: 1 TAPER (TYPICAL)
15'
12.50'
-I
II.
II
II
II
II
---'Lio
\I -
\I
II
'11
\I
II
I
I
I
1
---- - .~_.-
I
1
. I
I
\~I
10" COMPACTED
SUB-GRADE TO 987.
EXISTING
MA TCH EXISTING CURB
AND GUTTER TYPE
TRANsmON FROM MIAMI
TO STANDARD CURB AND
GUTTER Wl-tERE REOUIRED
MA TCH EXISTING FLOWliNE
ELEVA TlONS AT BOTH
ENDS (TYPICAL)
u -~. EXISTlN~ CURB AND
GUTTER (TYPICAL)
8" THICK TEXTURED STAMPED CONCRETE
(COBBLE STONE PATTERN) COLORED THROUGHOUT
COLOR TO BE SELELCTED BY OWNER
NOTE: SECTlON SHALL BE SYMETRICAL
ALONG CENTER LINE
PROVlOE 2" PVC CASING fOR IRRIGA nON
PLAN
SCALE: '":10'
DETAIL wSw - TYPICAL NARROWING DETAIL
6"
I-i
~[
3/4- BEvEL
SURF ACE M A TERI AL
/~ BASE COURSE
ISTING PAVEMENT\
\
2' TYPE . A" CURB
AND GUTTER (TYP.)
LANDSCAPED MEDIAN
8" THICK TEXTURED
STAMPED CONCRETE (
.L ~:~~
12'
10" COM
SUB-GR
EXISTING
32'
16'
32'
EXlSTI~
ELEV A lION
SCALE: 1"=5'
32'
!! l
I' ,
./ ,
I
16' DIA.
; II
I. i
" .
\\
32'
MAINTAIN EXISTING /':j!.'
DROP CURB AT //,
EDGEMON/SHEPARD ONL Y ~/;',.-
,. /..
MATCH EXIST. '/_ _ - - - --
RADIUS . .
w
C
'N
'0
c.:>
Z
1=
Vl
X
w
I
I
I
I
1- ____ - .--0-
I
I
I
I
.j
1
"", I
" /. .' ,.' '1
. . . . .....- ...... '.' . '.''4
'. .' "1
^' ,,:.:<~:>.::":~':
MA'
Elf
EN!
I
I-
o
~
I
()
I-
0<:
~
.:~\
~
8" THICK TEXTURED STAMPED CONCRETE
(COBLE STONE PATTERN) COLORED THROUGHOUT
COLOR TO BE SELECTED BY OWNER
TYPE "A" CURB AND GUTTER
\ \ LANDSCAPED MEDIAN
\..- RIBBON CURB ON SHEPARD/EDGEMON
SEE RIBBON CURB DETAIL THIS SHEET
PLAN
SCALE: 1"=10'
DETAIL wC. - TYPICAL TRAFFIC CIRCLE/LANDSCAPE ISLAND
SECTION 00500
AGREEMENT
THIS AGREEMENT MADE THIS 2g~-`' DAY OF 199.9between the CITY OF
WINTER SPRINGS of 1126 East State Road 434, Winte Spri gs, Florida 32708, Seminole County,State
of Florida, herein referred to as OWNER and A.P.E.C..Inc. of Orlando Florida, herein referred to as
CONTRACTOR, a person duly licensed as a Contractor in the State of Florida, as follows:
1. DESCRIPTION OF WORK -CONTRACTOR shall perform the work, in accordance with the
Contract Documents, for the construction of the Traffic Calming Devices.
2. CONTRACT DOCUMENTS -The Contract Documents consist of this Agreement; all Technical,
General and Supplementary Conditions and Sections contained in the Project Manual; the Drawings as
listed on the Bid Form and Index to Drawings; all Addenda issued prior to and all Change Orders issued
after execution of this Agreement. These form the Contract and are incorporated into this Contract by
this reference.
3. CONTRACT TIME -The CONTRACTOR shall begin work within 10 calendar days after the
issuance of a written Notice to Proceed and shall complete the work within 90 calendar days from
the date of the Notice to Proceed. Extensions, if any, are authorized by OWNER, and may only be granted
in writing.
4. LIQUIDATED DAMAGES -OWNER and CONTRACTOR recognize that time is of the essence of
this Agreement and that OWNER will suffer financial loss if the Work is not substantially complete within
the time specified in Paragraph 3 above, plus any extensions thereof allowed in accordance with the
General Conditions. They also recognize the delays, expense, and difficulties involved in proving in a legal
or arbitration proceeding the actual loss suffered by OWNER if the Work is not substantially complete on
time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated
damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER $100.00 for each day that
expires after the time specified in Paragraph 3 for substantial completion has expired until the work is
finally complete and the Substantial Completion Certificate has been issued and that OWNER has paid to
CONTRACTOR the consideration of Ten ($10.00) Dollars as consideration for this provision.
5. CONTRACT PRICE, LUMP SUM CONTRACT -The OWNER will pay the CONTRACTOR in
current funds for the performance of the work, subject to additions and deductions by Change Order,
the Total Contract Price of One Hundred Eiaht Thousand Three Hundred Twenty One and 20/00
Dollars ($ 108.231.20 ). Payments will be made to the CONTRACTOR based on the Lump Sum Bid
amount, the Schedule of Values, and subject to completion of the work, in accordance with the
Contract Documents.
6. PROGRESS PAYMENTS -OWNER shall make progress payments on account of the contract price
to CONTRACTOR, on the basis of application for payments submitted to the City or their authorized
representative, by CONTRACTOR as the work progresses, and in accordance with the Contract Documents.
Progress payments may be withheld if:
(A) Work is found defective and not remedied;
(B) Contractor does not make prompt and proper payments to subcontractors;
(C) Contractor does not make prompts and proper payments for labor, materials, or equipment
furnished him;
(D) Another Contractor is damaged by an act for which Contractor is responsible;
(E) Claims or liens are filed on the job; or
(F) In the opinion of the City of Winter Springs, Contractor's work is not progressing satisfactorily.
7. FINAL PAYMENT -OWNER shall withhold up to 10% of the Contract Price throughout the project.
The Owner shall release 50%of the amount witheld upon issuance of the Substantial Completion
Certificate. The remaining 50% of the amount withheld shall be released with the Final Payment after the
issuance of the Final Completion Certificate. OWNER shall make final payment to CONTRACTOR within
thirty (30) days after the work is fully and properly completed, if the contract has been fully and timely
performed, but subject to the condition that final payment shall not be due until CONTRACTOR has
delivered to OWNER a complete release of all liens arising out of the contract, or receipt releases of lien
fully covering all labor, materials and equipment for which a lien could be filed, or in the alternative a
bond satisfactory to OWNER indemnifying him against such claims.
By making payments OWNER does not waive claims including but not limited to those relating to:
(A) Faulty work appearing after substantial completion has been granted;
(B) Work that does not comply with the Contract Documents;
(C) Outstanding claims of liens; or
(D) Failure of Contractor to comply with any special guarantees required by the Contract Documents.
CONTRACTOR, by accepting final payment, waives all claims except those which he has previously made
in writing, and which remain unsettled at the time of acceptance of payment pursuant to this contract.
8. DESIGNATION OF PROJECT DIRECTOR OR ARCHITECT OR ENGINEER: DUTIES AND
AUTHORITY -The duties and authority of the City are as follows:
a. General Administration of Contract. The primary function of the City is to provide the general
administration of the contract. In performance of these duties George F. Edwards, Capital
Projects Coordinator, is the City's Project Director during the entire period of construction. The
OWNER (City) may change the Project Director during the term of this contract.
b. Inspections. ODIn10nS, and Progress Reuorts. The OWNER shall be kept familiar with the
progress and quality of the work by CONTRACTOR and may make periodic visits to the work site.
The OWNER will not be responsible for the means of construction, or for the sequences, methods,
and procedures used therein, or for the CONTRACTOR's failure to perform the work in accordance
with the Contract Documents.
c. Access to Work Site for Inspections. The OWNER shall be given free access to the works site
at all times during work preparation and progress. The Project Director is not obligated to make
exhaustive or continuous on site inspections to perform his duties of checking and reporting on
work progress, and any such inspections shall not waive Owner's claim regarding defective work
by Contractor.
d. Interpretation of Contract Documents• Decisions on Disputes. The OWNER will be the initial
interpreter of the contract document requirements, and make decisions on claims and disputes
between Contractor and Owner.
e. Refection and Stoppage of Work. The OWNER shall have authority to reject work which in its
opinion does not conform to the Contract Documents, and in this connection may stop the work
or a portion thereof, when necessary.
f. Payment Certificates. The OWNER will determine the amounts owing to CONTRACTOR as the
work progresses, based on CONTRACTOR's applications and OWNER's inspections and
observations, and will issue certificates for progress payments and final payments in accordance
with the terms of the Contract Documents.
9. RESPONSIBILITIES OF CONTRACTOR - CONTRACTOR'S duties and rights in connection with
the project herein are as follows:
a. Responsibility for Supervision and Construction. CONTRACTOR shall be solely responsible
for all construction under this contract, including the techniques, sequences, procedures and
means, for the coordination of all work. CONTRACTOR shall supervise and direct the work, and
give it all attention necessary for such proper supervision and direction.
b. Discipline and Emolovment. CONTRACTOR shall maintain at all times strict discipline among
his employees, and he agrees not to employ for work on the project any person unfit or without
sufficient skill to perform the job for which he was employed.
c. Furnishing of Labor, Materials, etc. CONTRACTOR shall provide and pay for all labor, materials
and equipment, including tools, construction equipment and machinery, utilities, including water,
transportation, and all other facilities and services necessary for the proper completion of work
on the project in accordance with the Contract Documents.
d. Payment of Taxes: Procurement of Licenses and Permits. CONTRACTOR shall secure all
licenses and permits necessary for proper completion of the work, paying the fees therefor.
CONTRACTOR warrants that it (and subcontractors or tradesmen, if authorized in the Contract
Documents) hold or will secure all trade or professional licenses required by law for CONTRACTOR
to undertake the contract work.
e. CONTRACTOR will provide written guarantee for work and materials for one (1) calendar year after
acceptance by OWNER.
10. BOND -CONTRACTOR shall supply a materials, performance and payment bond(s) in
accordance with Florida law and to the satisfaction of OWNER, in an amount specified in the Contract
Documents.
il. MEDIATION/VENUE -The parties agree that should any dispute arise between them regarding
the terms or performance of this Agreement, both parties will participate in a mediation. The parties
agree to equally share the cost of the mediator. Should the parties fail to resolve their differences
through mediation, then any cause of action filed hereunder shall be filed in the Circuit or County Court
for Seminole County, Florida.
12. NOTICES -Any notice or approval under this Contract shall be sent, postage prepaid, to the
applicable party at the address shown on the first page of this Contract.
Signed, Sealed and Delivered
in the presence of:
Contractor: ~. ~ • C ,
~, ~~ _~
Name: '~ ~ ~ ~~ !~'- C ~~~ ~~ ~ ,
Address and Te~ephone:
1 ~ 1 ~~~c~~, ~~ .
Owner:
Cit of Winter S~~i s
~i~
Ronald W. hicLemore
City Manager
1126 East State Road 434
Winter Springs, FL. 32708
407-327-1800