HomeMy WebLinkAbout2004 08 09 Consent 200
i '
.'
COMMISSION AGENDA
ITEM 200
CONSENT X
INFORMATIONAL
PUBLIC HEARING
REGULAR
August 9/ 2004
Meeting
MGR jJ-- IDEPT / /V'
Authorization
REQUEST: Public Works Department Requesting City Commission Approval to enter
into a contract for the construction of a Left Turn Lane on S.R. 419 at Moss
Road
PURPOSE: The purpose of this Board item is to request authorization to enter into a
contractual agreement with Allstate Paving, Inc. to construct a left turn lane on
S.R. 419 at Moss Road as advertised under Bid ITB-OII-041KL at a cost of
$241,954.00 plus a 10% contingency.
CONSIDERA TIONS:
This project is needed to construct safety improvements on S.R. 419 by providing a left
turn lane onto Moss Road for northbound traffic. Currently, northbound traffic on 419 turning
left onto Moss Road have no protected area to perform this movement. Northbound traffic
traveling at 50 MPH must come to a halt which creates a dangerous situation. This project will
reduce the risk of accidents at this intersection which is heavily used by Police Department
personnel. The bids for this project were opened on June 30,20043, under ITB 011-041KL.
There were five (5) bids received. The low bidder was Allstate Paving, Inc. at
$241,954.00. The review and recommendation by the design engineer, PEC, Inc. is attached
stating Allstate Paving, Inc. is the lowest responsible bidder meeting the requirements delineated
in the ITB. The City Clerks summary is also attached.
The scope of work includes the construction ofa northbound left turn lane on S.R. 419
including widening, curbing relocation, utility coordination, maintenance of traffic, and striping.
All permits have been received. The Engineering Plans are available in the office of the Capital
Projects Coordinator.
Consent Agenda Item 200
August 9, 2004
Page 2
FUNDING:
The funding for this project is budgeted in the Transportation Impact Fee
Fund (140-65000-30021) at $275,000. The Joint Participation Agreement with
FDOT will reimburse $100,000 of the project costs. We anticipate approximately
$10,000 in construction administration costs for PEC.
Construction Cost
10% Contingency
Construction Administration
FDOT JP A
Net Total Cost to City
$241,954
$24,195
$10,000
($100.000)
$176,149
RECOMMENDATION:
It is recommended that authorization be given to enter into a contractual
agreement with Allstate Paving, Inc. to proceed with the construction of the Moss
Road Turn Lane on S.R. 419 as advertised under ITB-OII-04fKL at a cost of
$241,954 plus a 10% contingency payable from the Transportation Impact Fee.
IMPLEMENTA TION SCHEDULE:
The scope of work will be completed within 150 days of approval.
ATTACHMENTS:
1. City Clerk Bid summary
2. PEC Recommendation of Award
COMMISSION ACTION:
Attachment No.1
BID NUMBER: ITB-OI1-04/KL
INTERSECTION lMPROVEMENTS
MOSS ROAD AND STATE ROAD 419
BID OPENING: JUNE 30, 2004 3:00 PM
Was Called By: Nancy Vobomik, Purchasing Coordinator
Bid Opened: 3:00 p.m.
Bid Closed: 3:05 p.m.
Witnesses:
Greg Bishop, Capital Projects Coordinator
Five (5) Bids Received:
Perri Builders, Inc.
Contact: Joseph C. Perri
524 N. Mission Road
Orlando, Fl 32808
Phone 407-292-2128 Fax 407-292-2137
Base Bid: $322,109.00
Gibbs & Register, Inc.
Contact: John W. Gibbs
530 South Main Street
Winter Garden, FL 34787
Phone - none given
Base Bid: $282,500.00
Allstate Paving, Inc.
Contact: Dan Phillips
5284 Patch Road
Orlando, FL 32822
Phone 407-277-5247 Fax 407-273-7146
Base Bid: $241,954.00
Barracuda Building Corp
Contact: James C. Thompson
P.O. Box 583
Gotha,FL 34734
Phone 407-578-1441 Fax 407-578-1454
Base Bid: $ 282,928.00
Cathcart Contracting Company
Contact: None Given
6972 E. Aloma Avenue
Winter Park, FL 32792
Phone- None Given Fax- None Given
Base Bid: $ 272,968.62
Attachment No.2
<--
--
PEe
PROFESSIONAL ENGINEERING CONSUL TANTS, INC.
July 23, 2004
WS-006
2-1.0
Mr. Kipton D. Lockcuff, P.E.
Public Works I Utility Director
City of Winter Springs, Florida
1126 East State Road 434
Winter Springs, Florida 32708-2799
SUBJECT:
Intersection Improvements - Moss Road and State Road 419
Bid No.ITB - 011 - 04/KL
RE:
Recommendation of Award
Dear Mr. Lockcuff:
On Wednesday, June 30, 2004 , the City of Winter Springs received sealed construction bids for the
above referenced project from five (5) contractors. Evaluation of bids received indicates Allstate Paving,
'Inc. as'the'apparent low bidder 'with a total bid price of $241,954.00. The second apparent low bidder
is Cathcart Contracting Company with a total bid price of$272,968.62 and the third apparent low bidder
is Gibbs~ Register, Inc. with a total bid price of$282,500.00,
.'. .
PEe's revi~wa~ to completeness and proper execution of the bid proposal from the apparent low bidder
noted no irregUlarities.
PEC has received copies of the Bid Foml and attachments. From these copies, PEC cannot determine
whether required seals have been affixed. The City needs to confirm that all required seals have been
affixed.
Based upon information presented, the apparent low bidder appears to possess the manpower and
equipment necessary to perform the classes of work contemplated within the time specified. We have
contacted references listed for the apparent low bidder and this contractor performed satisfactorily on
past projects and has completed past projects within contract times.
Based on our review of the qualifications submittals from each ofthe bidders, and our conversatIon with
past project references, it is our opinion that Allstate Paving, Inc. would qualify as the low responsible
responsive bidder at the bid total amount of $241 ,954.00. We recommend that the City review the bids
for any irregularities prior to the City's decision on this bid award.
If you have any further questions, please do not hesitate to contact me at (407) 422-8062.
Sincerely,
PR:ES~AL ENGINEIl~~NSUL T ANTS, lNe
T_~r
Fu~sanS.~unjed,'p.~.. .." . ," .~..
Project Manager
G:\clerical\HIGHW A Y\PEC\Ws-006\005Itr.kiptonlockcufl wpd
Ipe
engineers
planners
surveyors
Attachment
cc: Robert P. Rudd, P:E. - PEC "Engineering Our Community"
200 East Robinson Street. Suite 1560. Orlando, Florida 32801 · 407/422-8062. FAX 407/849-9401
Public Works I Utilities
Department
Inter Office Transmittal
Andrea Lorenzo-Iuaces
To:
From: Greg Bishop, Capital Projects Coordinator
Department: City Clerk
Date: 9/7/2004
Re: Contract Documents
Intersection Improvements - Moss
Road and SR 419 Turn Lane
o As Requested
o Attached
~ For Your Use
o Approved as Submitted
o Approved as Noted 0 Returned as Noted 0 Sign and Return 0 Return _ Copies
CopIes DesCriptIOn
1 Notice of Award Letter
1 Contract Agreement
1 Certificate of Liability Insurance
1 Certificate of Perforrnanace Bond
1 Certificate of Labor and Materials Bond
1 Surety Power of Attorney
. Comments:
CITY' OF WINTER SPRINGS, FLORIDA
1126 EAST STATE ROAD 434
WINTER SPRINGS, FLORIDA 32708-2799
Telephone (407) 327-1800
Utility I Public Works
Department
NOTICE OF AWARD
TO: Dan Phillips, President
Allstate Paving, Inc.
5284 Patch Road
Orlando, Florida 32822
PROJECT DESCRIPTION:
Intersection Improvements - Moss Road and State Road 434
The OWNER has considered the BID submitted by Allstate Pavina. Inc. for the above-described WORK in
response to the Advertisement for Bids dated 30 Mav 2004, and Instructions to Bidders.
You are hereby notified that your BID in the amount of $241.954.00 for BID items contained in the Bid Schedule
has been accepted.
You are required by the Instructions to Bidders to execute the Agreement and furnish the required
CONTRACTOR's Performance Bond, Payment Bond, and certificates of insurance within ten (10) calendar
days from the date of this Notice to you. If you fail to execute said Agreement and to furnish said Bonds within
ten (10) calendar days from the date of this Notice, said OWNER will be entitled to consider all your rights
arising out of the OWNER's acceptance of your BID as abandoned and your BID BOND shall be forfeited. The
OWNER will be entitled to such other rights as may be granted by law.
You are required to return an acknowledged copy of this NOTICE OF AWARD to the OWNER.
Dated this 10lh day of Auaust. 2004.
OWNER: By lri!dlt///.}~~:;;
/7.. ,Ron McLemore
Title City Manaqer
,.'
By
ACCEPT CE OF NOTICE n
OF AWARD is hereby acknowledged by1)(gf\ rf), \ I~~ this
Re~nd acceptance
the day of Au u
Title
S..... I...
CITY OF WINTER SPRINGS, FLORIDA
1126 EAST STATE ROAD 434
WINTER SPRINGS, FLORIDA 32708-2799
Telephone (407) 327-1800
Utility I Public Works
Department
?REEMENT FORM
THIS AGREEMENT MADE THIS,;!/! . DAY OF ~s:r;e:-/n :8 ~ , 2004 between the CITY
OF WINTER SPRINGS of 1126 East State Road 434, Winter Springs, Florida 32708, Seminole County, State
of Florida, herein referred to as OWNER and Allstate Paving, Inc, State of Florida, herein referred to as
CONTRACTOR, a person duly licensed as a Contractor in the State of Florida, as follows:
1. DESCRIPTION OF WORK - CONTRACTOR shall perform the work, in accordance with the Contract
Documents for the construction of the Intersection Improvements - Moss Road and State Road 419.
2. CONTRACT DOCUMENTS - The Contract Documents consist of this Agreement; all Technical,
General and Supplementary Conditions and Sections contained in the Project Manual; the Drawings as listed
on the Bid Form and Index to Drawings; all Addenda issued prior to and all Change Orders issued after
execution of this Agreement. These form the Contract and are incorporated into this Contract by this reference.
3. CONTRACT TIME - The CONTRACTOR shall begin work within 10 days after the issuance of a
written Notice to Proceed and shall complete the work within 120 calendar days from the date of the Notice to
Proceed. Extensions, if any, are authorized by OWNER, and may only be granted in writing.
4. LIQUIDATED DAMAGES - OWNER and CONTRACTOR recognize that time is of the essence of this
Agreement and that OWNER will suffer financial loss if the Work is not substantially complete within the time
specified in Paragraph 3 above, plus any extensions thereof allowed in accordance with the General Conditions.
They also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration preceding
the actual loss suffered by OWNER if the Work is not substantially complete on time. Accordingly, instead of
requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as
a penalty) CONTRACTOR shall pay OWNER $200.00 for each day that expires after the time specified in
Paragraph 4 for final completion until the work is finally complete, and that OWNER has paid to CONTRACTOR
the consideration ofTen ($10.00) Dollars as consideration for this provision.
5. CONTRACT PRICE. UNIT PRICE CONTRACT - The OWNER will pay the CONTRACTOR in current
funds for the performance of the work, subject to additions and deductions by Change Order, the Total Contract
Price of Two Hundred Forty-one Thousand Nine Hundred Fifty-four Dollars, ($ 241.954.00). Payments will
be made to the CONTRACTOR for actual quantities installed on the basis of the Schedule of Unit Prices
included as a part of his Bid, which shall be as fully a part of the Contract as if attached or repeated herein.
6. PROGRESS PAYMENTS - OWNER shall make progress payments on account of the contract price to
CONTRACTOR, on the basis of application for payments submitted to the City or their authorized
representative, by CONTRACTOR as the work progresses, and in accordance with the Contract Documents.
Progress payments may be withheld if:
(A) Work is found defective and not remedied;
(8) Contractor does not make prompt and proper payments to subcontractors;
(C) Contractor does not make prompts and proper payments for labor, materials, or equipment fumished
him;
(D) Another Contractor is damaged by an act for which Contractor is responsible;
... '..
;
. Page 2
August 10, 2004
(E) Claims or liens are filed on the job; or
(F) In the opinion of the City of Winter Springs, Contractor's work is not progressing satisfactorily.
7. FINAL PAYMENT - OWNER shall withhold up to 10% of the Contract Price throughout the project.
The OWNER shall release 50% of the amount withheld upon issuance of the Substantial Completion Certificate.
The remaining 50% of the amount withheld shall be released with the Final Payment after the issuance of the
Final Completion Certificate. OWNER shall make final payment to CONTRACTOR within thirty (30) days after
the work is fully and properly completed, if the contract has been fully and timely perfonned, but subject to the
condition that final payment shall not be due until CONTRACTOR has delivered to OWNER a complete release
of liens arising out the contract, or receipt releases of lien fully covering all labor, materials and equipment for
which a lien could be filed, or in the altemative a bond satisfactory to OWNER indemnifying him against such
claims.
By making payments OWNER does not waive claims including but not limited to those
relating to:
(A) Faulty work appearing after substantial completion has been granted;
(B) Work that does not comply with the Contract Documents:
(C) Outstanding claims of liens; or
(D) Failure of Contractor to comply with any special guarantees required by the
Contract Documents.
8. DESIGNATION OF PROJECT DIRECTOR OR ARCHITECT OR LANDSCAPE ARCHITECT:
DUTIES AND AUTHORITY - The duties and authority of the City are as follows:
a. General Administration of Contract. The primary function of the City is to provide the general
administration of the contract. In perfonnance of these duties Gregory A. Bishop. or his authorized
representative is the City's Project Director during the entire period of construction. The OWNER (City)
may change the Project Director during the tenn of this contract.
b. Inspections. Opinions. and ProQress Reports. The OWNER shall be kept familiar with the progress
and quality of the work by CONTRACTOR and may make periodic visits to the work site. The OWNER
will not be responsible for the means of construction, or for the sequences, methods, and procedures
used therein, or for the CONTRACTOR's failure to perfonn the work in accordance with the Contract
Documents.
c. Access to Worksite for Inspections. The OWNER shall be given free access to the worksite at all
times during work preparation and progress. The Project Director is not obligated to make exhaustive
or continuous on site inspections to perfonn his duties of checking and reporting on work progress, and
any such inspections shall not waive Owner's claim regarding defective work by Contractor.
d. Interpretation of Contract Documents: Decisions on Disputes. The OWNER will be the initial
interpreter of the contract document requirements, and make decisions on claims and disputes
between Contractor and Owner.
e. Reiection and Stoppaae of Work. The OWNER shall have authority to reject work which in its
opinion does not confonn to the Contract Documents, and in this connection may stop the work or a
portion thereof, when necessary.
I .... t..
. Page 3
August 10, 2004
f. Payment Certificates. The OWNER will determine the amounts owing to CONTRACTOR as the work
progresses, based on CONTRACTOR's applications and OWNER's inspections and observations, and
will issue certificates for progress payments and final payments in accordance with the terms of the
Contract Documents.
9. RESPONSIBILITIES OF CONTRACTOR - CONTRACTOR's duties and rights in connection with the
project herein are as follows:
a. Responsibility for Supervision and Construction. CONTRACTOR shall be solely responsible for all
construction under this contract, including the techniques, sequences, procedures and means, for the
coordination of all work. CONTRACTOR shall supervise and direct the work, and give it all attention
necessary for such proper supervision and direction.
b. Discipline and Employment. CONTRACTOR shall maintain at all times strict discipline among his
employees, and he agrees not to employ for work on the project any person unfit or without sufficient
skill to perform the job for which he was employed.
c. Furnishina of Labor, Materials. etc. CONTRACTOR shall provide and pay for all labor, materials
and equipment, including tools, construction equipment and machinery, utilities, including water,
transportation, and all other facilities and services necessary for the proper completion of work on the
project in accordance with the Contract Documents.
d. Payment of Taxes: Procurement of Licenses and Permits. CONTRACTOR shall secure all
licenses and permits necessary for proper completion of the work, paying the fees thereof.
CONTRACTOR warrants that it (and subcontractors or tradesmen, if authorized in the Contract
Documents) hold or will secure all trade or professional licenses required by law for CONTRACTOR to
undertake the contract work.
e. CONTRACTOR will provide written guarantee for work and materials for one (1) calendar year after
acceptance by OWNER.
10. BOND - CONTRACTOR shall supply a materials, performance and payment bond(s) in accordance
with Florida law and to the satisfaction of OWNER, in an amount specified in the Contract Documents.
11. MEDIATIONNENUE - The parties agree that should any dispute arise between them regarding the
terms or performance of this Agreement, both parties will participate in a mediation. The parties agree
to equally share the cost of the mediator. Should the parties fail to resolve their differences through
mediation, then any cause of action filed hereunder shall be filed in the Circuit or County Court for
Seminole County, Florida.
12. NOTICES - Any notice or approval under this Contract shall be sent, postage prepaid, to the applicable
party at the address shown on the first page of this Contract.
. . 1." l..
)
. Page 4
August 10, 2004
::J:;"tJ the pffiOO"Ce of
Namp te5
Title
oytLf Pel-leA ~rJ
Business Address
dV1o{)Jo ~f 0d?;r.)--
City, State Zip (
Date ~oy
~~9~
OWNER:
CITY OF WINTER SPRINGS
--- 4c-v.~- ~-=:>
By: Ronald W. McLemore
City Manager
1126 East State Road 434
Winter Springs, FL. 32708
407-327-1800
From: Darlene Sullivan At: Sihle Insurance Group FaxlD: Sihle Insurance Grou To: A~ TAMYIHABEEB All
Date: 8/31104 12:04 PM Page: 'Z. Of 2
ACORD.. CERTIFICATE OF LIABILITY INSURANCE OP 10 Dsl DATE (MM/ODIYYYYI
ALLST-6 08/31/04
PROPUCER THIS CERTIFICATE IS ISSUED AS A MAnER OF INFORMATION
ONLY AND CONFERS NO RiGHTS UPON THE CERTiFICATE
SIHLE INSURANCE G~OUP, INC. HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
P. O. BOX ,160398 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
ALTAMONTE SPRINGS FL 32716
Phone; 407-869-0962 Fax:407-774-0936 INSURERS AFFORDING COVERAGE NAIC#
INSURED INSURER A. Amerisure Insurance CO.
INSURER B: Bridgefield Itmployer.:J Inl Co.
~1l2tate &avin3' Inc. INSURER c:
--'_._---..,----,.- _._,--------'- ,-, .....-......_-----_._.~...... . _..__._u .,___ _._ ..'_._.
28 Pate Roa INSURER 0'
Or1ando FL 32822
INSURER E: '
, COVERAGES
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICA TED, NOTWITHSTANDING
ANY ReOUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTliER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURA}.ICE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BV PAID CLAIMS
I~~~ ~~~~ TYPE OF INSURANCE POLICY NUMBER PD<i~gi..f~E&wiE P8k~CEYt~Uh'IDAAN UMITS
GENERAL LIABILITY EACH OCCURRENCE 51,006,000'
~ 04/03/04 04/03/05 HtNltU
A X COMMERCIAL GENERAL LIABILITY <;L2008621000000 PREMISES (Ea occur.nee) 5 50,000
(:1 AIMS MAor I X occUR MED EXP (Anyone person) 5 5,000
X XCU-Broad Form PO INSURANCE IS PRlMAF Y PERSONAL & ADV INJURY $1,000,000
~ Contractual $1000 po OEOUCTIBLEiOCC\.JR GENERAL AGGREGATE $ 2 ,000,000
GEN'LAGG~EGflE LIMIT APAS PER: PRODUCTS. COMP/OP AGG 52,000,000
~ 'PRO- .
POLICY X JECT LOC
AUTOMOBILE LIABILITY .
COW61NED SINGLE LIMIT 51,000,000
A X AllY AUTO CA1386393010003 04/03/04 04/03/05 (Ea aceidenl)
~_.~- ---- ...._- -------_._~". ......--..........-..
ALL OWNED AUTOS BODILY INJURY
- $
SCHEDULED AUTOS (pl!( person,
-
~ HIRED AUTOS 60DIL V INJURY
$
~ NO,N.OWNE:O AU 1 OS (Per aeeidenl)
- PROPERTY DAMAGE $ INCLUDED
(Per accidenl)
GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $
l ANY AUTO OTHER THAN EA ACC $
AUTO ONLY: AGG 5
EXCESs/UMBRELLA LIABILITY EACH OCCURRENCE $
:=J OCCUR D CLAIMS MADE AGGREGATE $
$
I DCDUCTlOLE $
RETENTION $ $
WORKERS COMPENSATION AND X TTO'~/~I~\~S T UJ~-
B EMPLOYERS' LIABILITY 830-31094 01/01/04 01/01/05 E.L, EACH ACCIDENT $1,000,000
ANY PROPRIETOR/PARTNER/EXECUTIVE
OFFICERIMEMBER EXCLUDED? E,L. DISEASE - EA EMPLOYEE $ 1 , 000 , 000
~~~~I~t.~~~v~s1o~s below E,L. DISEASE - POLlC V LIMIT 51 000,000
OTHER
A INLAND MARINE R/IM1386440 04/03/04 04/03/05 LEASED EQ $100,000
ALL RISK* ,2500 ded
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDeD BY ENDORSEMENT I SPECIAL PROVISIONS
CONTRACT AMOUNT:241,954.00 DURATION 6 MONTHS
CERTIFICATE HOLDER
CANCEL.L.ATION
WINTERS
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRAnON
DATE THEReOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL ~ DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL
IMPOSE NO OBLIGA TlON OR LIABILITY OF ANY KIND UPON THE INSURER. ITS AGENTS OR
City of Winter Springs
Building Department
Fax#407-327-6695
1126 East S.R. 434
Winter Springs FL 32708
@ACORD CORPORATION 1988
ACORO 25 (2001/08)
SECTION 00610
BONDI! 04-4371-pp
D~~I:ORMAtIICE BOND FORM
" -.- ~
THIS INSTRUMENT WITNESSETH: That we (1) Allstate Paving. T1)I". a and regularly
(2) Corporation organized under the laws of the State of Rl n,.i rl" and we (3)
authorized to do business in the State of florida as Principal,
~ First Sealord Surety .
(2)' Corporation' organiied under th.e laws of the State of Pennsylvania and
regularlY authorized to do business in the State of Florida as Surety, are held .and firmly bound unto
hereinafter called the Owner In accordance with 8 Contract hereinafter referred to, In the penal sum of
(4) Two Hundred Fortynnprn('l11 ~.<Inrl Ni n", ll"n~~~~~t~~~: 00 ) lawfu~ money of the
United States, well and truly to be paid unto the said Owner, for e payment of which w.e bInd ourselves,
our heirs, executors, administrators, successors and assignees, Jointly and severally, firmly by these
presents;
WHEREAS: the said Principal has entered into a written contract with the Owner dated
Paving for the work designated as Intersection Impro~ted .
in~ Moss Rd, Winter Sprinan conformity with Contract Documents hereby referred to and made a p~rt
hereof, the same to all Intents and purposes as if W1'itten at length herein. in which Contract the said
Principal has ' contracted to perfonn the work specified In said Contract in accordance with the- terms
thereof;
NOW, THEREFORE, the condition of this obligation Is such that if the Principal shall faithfully perform the
. Contract on his (Its) part, and satisfy all covenants, terms, conditions and agreements Incurred by the
Principal in the perfonnance of said Contract, during the original term ther~of, and any extensions thereof
which may be gramed by the Owner, with or without notice to the Surety, and shall satisfy all claims and
demands arising thereunder. and shall fully indemnity and save harmless the Owner from all cost and
damage which 'the Owner might sutter by reason of the failure c:f the Principal to do so, and shall fully
reimburse and repay to the Owner all costs, damages, and expenses which the Owner may incur in making
good any defau,t by the Principal, Including any default based upon failure of the Principal, to fulfill hls
obligation to furnish maintenance, repairs, or replacements for any period of time after the work Is
completed, if provided for in said Contract. then this obligation shall be null and void. otherwise it shall
remain In full force and effect.
IN ADDITION, the Principal and Surety, jointly and severally, expressly guarantee that all materials
furnished and workmanship performed under the Contract and in the construction of the work shall fulfill all
requirements of the Contract and the Contract Documents with respect to them. This bond shall remain In
effect for a period of one year ,
IT IS HEREBY STIPULATED AND AGREED that any suit based upon any default of the Principal In
fulfilling hiS obligations to furnish maintenance, repairs, or replacements for any period of time after the
Work is compfeted, if provided for In the Contract, may be brought at any time up to sIx months after ~e
expiration of the time specifled In the Contract during which the Contractor has agreed to furnish such
maintenance or make such repairs or replacements. .
THE SAID SURETY, for value received. hereby stipulates and agrees that no change, extension of time,
alter.atlon or addition to -the terms of the Contract or to the Work to be performed thereunder or the Contract
Documents accompanying the same shall In any way affect Its obligations on this Bond, and it do'es hereby
waive notice of any such change, extensIon of time, alteration or addition to the tE!rms of the Contract or to '
the Wor\< or to the Contract Documents.
PROVlDEO, r:URTHER, that no final settlement between the Owner :and the Contractor shall abridge the
right of any beneficiary,hereunder. whose claim may be unsatisfied.
(1) Contractor
(2) Sole Proprietor, Partnership, or Corporation
(3) Surety
(4) 110 percent of the Contract
17
/"
-~
IN WITN~SS WHEREOF. this instrument is executed In several cOunterparts. each One of which shall be
deeme~,a~1Jrigln~!. this the 26 day of August ,2004.
aving, Ioe~'
By: -..-.. '
Title: ~..re<;
:~L)fN!.ir~1 ,s:alO'R- p;:c. tJifIr
Title: DeM-t~ett, Atto~~e~
(Attomey in Fact)
(1) Cont"'Bc:tor
(2). Sur:ety
END OF SECTION
18
SECTION 00620
BOND# 04-4371-PP
LABOR AND MATERIALS PAYMENT BOND FORM
THIS INSTRUMENT WITNESSETH: That we (1) Allstate Paving, Ipc. ' a (2) Corp,~-
organl~ed under the laws of the State of Florida and regularly authorized to do business in
the State of
(3) Florida as Principal, and we (4) First SealorQ a (2) Cor{l organized under
,the laws of the State of PA and regulany authorized to do business In the State of (3) 1;'T as
Surety. are held and firmly bound unto (5) 'w1ntp-r SPringR hereinafter called the Owner in accordance
witt1 a Contract hereinafter referred to, in the penal sum of (6) $? "- 1 , 9 ,,"- on. Dollars ($
) lawful money of the United States, well and truly to be paId unto the said Owner. for the payment of which
we bind outselvesJ our heirs, executors, administrators, successors and assIgnees, JolnUy and severally,
firmly by these presents. WH~REAS, the said principal has entered Into a written contract with the Owner
, dated for work designated as
Pa,dp located in M~H)S Rd conformity with Contract Documents hereby
referred ~o and made a part hereof. the same to all Intents and purposes as if written at length herein, in
which Contract the said Principal has contracted to perform the work specified In said Contract in
accordance with the terms thereof;
NOW. THEREFORE. the condition of this obligation Is such that jf the Principal shall faithfully satisfy all
claims and demands Incurred by the, Principal of said Contract, and shall pay all obligations arising
thereunder. and shall fully'indemnify and save harmless the Owner from all cost and damage which the
Owner might suffer by reason of the falll,lre of the Pi'tnclpal to do so, and shall fully reimburse and repay to
. the Owner all costs. damages. and expenses which the Owner may incur in making good any default by
the Principal, and shall promptly make payment of prevailing wages to all persons supplying labor,
equipment pr materials for use in the prosecution of the work, whether by subcontractor or otherwise, and
Including all insurance premiums on said work as provided for in such Contract, then this obligation shall-be
null and void, otheJWise it shall remain in full force and effect.
IN ADDITION. thQ Principal and Surety, jointly and severally, expressly guarantee that the .Owner will be
held harmless from any liens, claims, demands or obligations in conjunction with materlats or services
provided with respect to this ,Contract This bond shall remain in effect for a period of one year from the
date of final acceptance. The Owner may sue on this Bond, and any person furnishing material or
performing labor, either ~s an individual or as a Subcontractor, shall have the right to sue on. this Bond in
the name of the Owner for his use and benefit. The said Surety, for value received, hereby stipulat6s and
agrees that no change, extension of time. alteration or add It/on to the terms of the Contract or to the Work
to be performed thereunder or the Contract Documents accompanying the same shall in any way affect its
. obligations on this Bond, and it does hereby waive notice of any such change. extension of time, alteration
or addition to the terms of the Contract or to the Work or to the Contract Documents. '
PROVloeo. FURTHER, that no final settlement between the Owner and the Contractor shall abridge the
right of any beneficiary hereunder, whose claim may be unsatIsfied.
( 1) Contractor
(2) Sole Proprietor, Partnership or Corporation
(3) State in which project is located
(4) Surety
(5) Owner
(6) 110 percent of the Contract
19
'"
w~~~ ~}~~~ 1~1~~i~?;~: r~~~ t,~';. ~ .
.'v,A.j.L.I n.l".. >,,", 'I'"
. '''lllt~~~:\tr~ ~~'~4:~.. ~~:~~ !~r;,:j
\'~"" '""l~" .t,'e ,,,,, """'''r~'
, t:;:i;I 'C;..-'j:i ',~i,~:l ".JI 'C'r;i."
1;;~i.
..:1:
~.:riI1 '$~~:
I .. ff'I!f
/I~i (,",./
~~.'~II~~lit'~lli!:.
~r,.....II. ",~~':'
AllgURt
, . ' . ~,r::tQf.' aJ~W~:~.~'~l~:~~9i9.,,;~nJ;~~jt..h
,I~'lr.ro. ~Wr.~~(lunlber 'i3l:i..~n:ttI ,
..,b"~_ :~~'~~~~, r".;I~. 'If.~;"i :>:~ 'f~'.' "~:~; '~5~:::~;
~al) " ,
.~ -,',
~:-f~~'fIR1};:~~~'~~,.~;_~~_.~.
It? I llJ1vlT'(
~-r:
I
I
I
I
I
J
I
I
J
I
I
I
I
,
1
I
Land Use Summary
Total Site Area =
14.99 AC.
17"'
~AH~tAi~
~UfF~K
4-&7 l ~f\U
+-
t.1(e;. ~TP,At;k ~cM ~ 4~
Total Units =
94 Units
Impervious Surface Ratio= 35%
I
r;;' MIN.
,-
~Ut? tM?tl TKe;.e;. /
4/J(Jt7 f...f" CJr Jc\t7AP ~TP&r~
r rf . !
g ~. ~ ~ r/f(eA~ y~'
~
-
~
~
.
.
Gross Density =
6.27 Units/ AC.
~~
~.
Overlay Zonin2 Distri~t Provided
Max. Building Height 35 FT. ~5 FT.
Structure setback from SR 434 25 FT. 40 FT.
Other property line setback 10 FT. 10 FT.
Min. SR 434 Landscape buffer 10 FT. 15 FT.
~, ~RM
Development Standard
Comparative Analysis
at:L?rr ~
t~"~l~-
ti7L.1 z' H~HT
",p 1 a~.
The following is a comparison of development standards provided vs. development
standards required in the SR 434 redevelopment overlay z<?ning district:
~. 1<. 4?J4-
~o
IMPU1j 1Tf:
','
t?1~ WTAI (." A-A
H.1:'?
=
4-0 I ~VN~ jel&,llf. ~;JVAI
~l UN~Hl? ~f!/fC
r~ kAAlH e;Mf.
f4'5l vrllATf~.
SOD
40'
48'
2' 4' 2' 12' Ci 12' 2' 4' 2'
- f--12
- 2% 2%_
- ~ \ I t---
..u...u.........a........
~.: ,.;,.;.:-: .:./.:::::::,:::::~,.::;.;.:: ',:';':':':":':':':';';"::': ...................... ...
...,. ..,.... -....... .
.t...;.....":.. ~: :r(.;X~.; ~;:'{:~~~ ;~: ~:Z..: .~ .::~..: .=...~. ;Ifl:~;~~~;~:;I~2 ~ ..~,~;.:~:::~?~;,:~.:! ~~7:,~ ~ ;?>:,:\):;.~ot~f:~~~>~~}:q
:;~::::<:. " ~ " ..... -..I
I.- 4"x4'
\-
MINI
MAX
SLOPE - ....1.. MIN. ASPHALTIC CONCRETE TYPE S-III
- 6" SOIL CEMENT (MINIMUM 7 DAY COMPRESSIVE
B & GUTTER - STRENGTH OF 300 PSI)*
) l.- N
CLASS I CONCRETE SIDEWALK
MUM 3000 PSI CONe.
2% CROSS SLOPE
2% CROSS
FOOT TYPE F CUR
MIN. 300 PSI (TYP
8 MINIMUM STABILIZED SUBGRADE (FBV 75)
.-
=,
-r:rr~wrd ~At~
H:r:t:2
NOTES:
1. SIDEWALKS NEXT TO NON-LOT AREAS TO BE INSTALLED
AT nME OF ROADWAY CONSlRUCnON BY THE SITE CONTRACTOR.
2. · SOIL CEMENT 300 PSI BREAK STRENGTH SHALL BE A FIELD
BREAK STRENGTH.
rtJAt7 17.eTA1~ t?-t'/
H.T.~.
~
-
&
:f:-
..r
W~TJAHt?
bA c,bI 'Wl
~vA~: I u =fe101 .
z4tl1
in
~
~
::z::
-
~
\!
.1l-
\
" --
t1-rATe:... t::CAO 4~4- t-rAT~ ~rr. ~T + ~ I~ TiF.
,-:; r-T. ~
n - - -, rr
(- -
n
i~
HA~-.~WIN~
~~ ~~ rJ--AH
~~W ~: M~~~ ~~
~~e;p ~: ~ ~IH~) 1Ht;:,.
"1 · A~ · &14-
~'41= M480Z-
The follo\ving is a comparison of development standards provided vs. development
standards required in the SR 434 redevelopment overlay zoning district:
?J' };?~RM
17"\
vA N 17t'1?Ai e:--
~UfF~~ ~f--
40 t P7f1\uqlJl(f;::. ~t.TpA:;K fRcM ~ 4~
- ---.....
n
(:
r
j
I
I
I
I
J
I
I
I
/ \
1
\
I
\
1
\
Land Use Summary
Total Site Area = 14.99 AC.
Total Units = 94 Units
Gross Density = 6.27 Units/ AC.
? \ MIN.
~
.
.
lrnpervious Surface Ratio= 35%
Development Standard
Comparative Analysis
?AH~ T~
~VZl\~\~
1t7L12\ H~~T
'i?t/ 1 a?
.
.
~a/~
~.
Overlay Zoning District Provided
Max. Building Height 35 FT. 35 FT.
Structure setback from SR 434 25 FT. 40FT.
Other property line setback 10 FT. 10 FT.
Min. SR 434 Landscape buffer 10 FT. 15 FT.
~. K. W4-
""~,-' . '~,i .
t7~ rerAl~ kA
I'll: V/.
~t?
lMP~Tl \'(f:
r4
.
, ,'-f-
! '
j;
" i ~
'~ I- ~
. j ,'I
-f
.-
./ 1'pl UN~H[/ ~",er<
r~ ~H ~.
1
L 14r:7 1If1 UlI ~T.
SOD
40'
43'
2' 4' 2' 12' Cl 12' 2' 4' 2'
1- f--12'
~2% 2%_
'-- -- "\ r ~
f ,
" .. ' ' ; , .. . " 'I
I, ; .- . I: " .. . .--' "
.-. "" - 4"x4'
1-
MINI,
MAX
SLOPE - 1" MIN, ASF'HAL TIC CONCRETE TYPE S-III
- 6" SOIL CEMENT (MINIMUM 7 DAY COMPRESSIVE
B & GUTTER - STRENGTH OF 300 PSW
CLASS I CONCRETE SIDEWALK
MUM 3000 PSI CONC
2% CROSS SLOPE
.. '
1
2% CROSS
~A~
~Me~~ , ~'--
~ ...... 1___- /'
,.
4-0 1 ~IV~t=;. ~lu,HT',;7p. WA,
FOOT TYPE F CUR
MIN. 300 PSI (TYP)
L 8" MINIMUM STABILIZED SUBGRADE (FBV 75)
1'IY~ lPT ~A)~
H:rvz
NOTES:
1. SIDEWALKS NEXT TO NON-LOT AREAS TO BE INSTALLED
AT llME OF ROADWAY CONSTRUCllON BY THE SITE CONTRACTOR.
2. .. SOIL CEMENT 300 PSI BREAK STRENGTH SHALL BE A FIELD
BREAK STRENGTH.
KOAt7 t?JTAIL" t?-t/
N.T.V/.
It?l tTflvlTj
~T
~
-
~
~ U.o1 (20 I
~?-A~: I tf -=bO(
z.4r?1
m
~
\--
Z
~
~
-\\-
'...". ....;-....'001I< ~:~...__.... :.............~...__r'VM ...'.~.........""""" ~~- ~,.... ,..
'" '.. ."........' ............,..._' ~. ~v.~....... ':~...., ~"','~__."'I--"''''"""
-
~A~^ 'I\W\ND"/'
a?~UAJ, ~~ r~AH
~KW ~: MC1(R~ f-k7M~
~F~W ~: ?f1-\ ~IH~~) I~.
'1 . A~ · 074-
Jl?t?-=W= M480Z-
, .
.
\
'......--," ~~.,.~
" ~ 1 > >~,
~.._~..~ ~';' ,.."". v- ~m"""""~~~,,.::m ,
t1-rAT~
t:CAD
4?J4-
~A"~
~ n, ~T ~ ~ lAKY) -r-(F.
I~ f"T. ~
fr
~~
~~
-
-
!~1 n
!~
\-
(-
.r
-.............._.." .-...-~#~- :~-r.-~...
" t f ~. "IT -/C"~ 11. ~ .~ .
U b~;..t' ",\.'V~ ~t i~ ~ ~J€-~ A!l:f . ~>\u '~!'i,,;;: 1/,' "
v.'t-.. c,." .. \ '-\ ....~ · ~ ~ ~'t^,;.;;/""~~,<
PO'.fl~~~,(J.:'_';r,,/'"-)' ~,,;;:>:~ q ",","" \ \ .I'.?"i"'....-t'I','-:;..;;...~ {. '
-,'Y' _ 1...1{)O'" ~'''''''. ......\- _" I' \ tr l~ ~X:"\j\ ..,
-"..J. ~' .~~ \.... \: ."~~~\(.i/..,
. . ~~~1t;:-., -~"'~"'-'''~-----'''-'''''-~''f?''''_~~_''~''~.............-..e-_~_,,-,-..~~.,_
'.'--~--~'''~. '~..-<....~~
v'-\;,;t:Jt:::"~',:
~;.:t:,..~
.~,
! Ii , ,
__~ Ii .-~!"
./1 ,'~\ t!
~:~:'~,:... ~-.. (.. \.
... G~::l\~~' 1'~~..
\.1 \\ ~ ~, .'......~~
r'J, l . ,.. . ~L.,~
~~.. ~...~ .. . \ \ ~=-. .""
{? t !~$H1 Kf f(K.r4~';:4
Aw- 'i". t .tf') /~ .~ ,i. ,",':;",",I)-'t\,).::::' C. t;J.,':: A\\,~'
'- fl.,.:...-'~<l~./ u. ~~.~)I. 1~jh*-tl'^ \~\j' ~, "-4.~ ~.~~L~~~
--~"':"'l ..... .;t::,..." -
.. ,~i~t[:c~~.,~;,: ~.~
, '.'. ~ ','" -r- ..~
\-l..-,~ L-~'...... .r~'-'....
, d'7.-r./..-"'.... \
,. " ,...-.~\
../~
~
r'l,
t ,
" .
ct..:~F'.~C't -<fL.
--. ~. '.", .-.~> . ',.r"l~ t"
~ ,~t"';, . . ., ~V"~~l
/ \: <'-"-1J $...~ \.
.....--'..
-.....
,..-
c;;..X.
,?
,J':"
_ -:........:.J.>:....:-. _ . ~ ....;....<.. --',.,. ,-_.c_." ~'_
4 ,
"_~...~...:.~..:.......::.Jo.~~,:-.~~"'..:~;.....:._i..\."-~._1r :.:.:.:.!:.~.t"i~~..!..lW:............:~~,....A.::..~.-L;_ . .._
J
I
,,'"
,:,-=-':"'~;t
C,:'(;-;....i! ~ t!",~
i;""'-'''''' !'
~._~.;..~...:---. -:-- -"7'::'.:~.;::-~',--, r- -. ---..:._:~: _":":.:J.~___ ..... ....
\
~.,
#
/f
. //
(,.....?
/~ba4 ~~
4~:"'\" 4~".#
I~ ~u.....t-;,'''''''''ir // det~""~ 4:)"''''
J~'~""'C/"l~~{~'~, 8 (-~"ij':!v ...~./~:?
--f f ~~"~."""""'.t.l.-rJ __I << ..~~ . i~' ;,,;/'.,,'
:l
/.s,. (.~ ?ir)
~":':~~1~ '
,,-l.,......._~-
~~ - - -~-
. - --...
..
h .R.J~,A:. t; l. .lg\-l..~A~~. ~()
,- t .' ;t~~'r ~/' J~' ,;it-' \l~v 'c'
---.L~..~---"'=':'-~:-~4.i.~:':"::L..~~:~~~~~~--='1..:::'::i...~..':"'.~:.c;:~'-.:--'":.;'-":XiAC"""O';T/"~~'..:-<;~:.....~.~'::::. - . :__-:.-'.:\!,~.',:.:.j~:Z;:ilt;,:::::c..-. _~:"~~'-k:;,.'.':; ,_e..... ,....
~~
_.----'l
~ I ~lki~'J..-Qif t1.~U/ .~ '
/. '';.,\..'~
",'
<..,..,.."
/,.",.....
~/
....,..... ,
">
~........'-
'...'>,.
'~:~..
'"
.......
-,
,......
''>:...,~"
"'l'I.,.'::lo...
- --..~~--~ ---'W"
--- ,-
~
~
I,
--'
/...-
..."
.,....-"..,
;l f, ,
t 'l..~.~.J J II igit'1(,., vt,~~
b ,~ ~~l'''''' ~
,/'
<"
C ~(Jl tJ;r- (' .'l~~~ C' "
'-.........,
l
~ i
..,..,\,
'3.
/'
~
.- .---.....""",' '"'~. ....,..'<f~--.~.....-.._~........-'"'"'C..~~........__.-~~,.
\
\
~~;(:;"o" . .... -
/"IF{""( ~ ~ ,.1-
,r -~_.-i--",~~'::~~)" -
/
A........~.
./
'..
"~
~~~ f '~~~
j \"
.1E:;.-------~ ,~>.
tr' .' -r;;' ~\
,: ''':~.....;-..r'--. 1/
. ..; .-' -', :li....i..Y
.:1'r~~....-.;~~:.'~~._~::::~,_~~~=___;..: '::--;~:.';--'
~~;.!i}~ iAR.i~;~j\'i' -l''i}a:l.~
_""l~---'S>:-... -'(..,;.~ ". l }:y~-;......,
......;.;..:.: -
r'"
nIltJ
1
f
q tt1
ll~~~
~-,.
"
...~.: j,.._~~~~~~I~~l;j~~
~ d~"
~~ Iv~ (
h.~~.~l . _
[y t V "'-1
....M...- t...... ~ ;~,~:.;.~.~...:.: J ,--~>.~ ,_ ~~;";;~.u:.~.~-:
'':'''"''Q' '~f:.._~'..~...:.:.._~.
-.""ICir..r-.'.-
I.':J.-'_~" '.- ~
~
/ ~-- t.---
J /' ~
/ ~.. , ~
/ ,~
- ,,-~':.. f,../
~!'~ ,
~U\ \v\~
--)/
IL9
~1P_.
.If
L
/\
/"
J-
t"- ---. - '-----'. -~~.
. ...-...-~-
.. _ \1
:/~.~-~
~ 't
~:
'''oj/
t~~~)J~~~;
jI ,~(~~ ~ f
~
{V,//r ->. '~t.f1 ,~~,(~"
\o~~__ -7...."V\... '(k I
r . '\
~.k:l
;pQ
---"-'......,---- -
____._~~K ;f-
4t--0'\ I
V ~-.-h~~:
:=:-~\?~
, ::i'1~ .,' ·
c..~ /-.~
.~_'.r ,.....J,'\ .,J
~~~'.--------:....."-;'--~ <--.-:~.~,. .~.~":' -~~,.~:-.;:;~~~_..:.::.~.~~:,.~..:.::~>~~..Z_~;~.:i;::,::.:;:;~-,l~,:
_____'-:.~~....:..:.:...._~~':_~.,~"__~~_-~~...:.-- '-.,:.~.ia;;..~,::~:......:_ _ ....~.:.. '__"~.~~-d'_ _
~,_;..:,l~~:...~.:'i ~L.;.~':~~":~1" \
~ "a
..., , /.)........... ',\. ,~',,: /'.'i:;:;;. :~."" ' (
,:' ., , , lr t, I "'.... ) ~,...>:.., />, ~ 'I J;~'.! i
'-"' ,.;...~, ~ i\~A~;.,.[~'1~ t \.r''t~~\.~ '
~ 'J : "1(' ~) .,.-,,0 -;/'
\, 'J \ !...r,... ,~,' ..,
'. ~.
It?' \\ ~
_t:-. '1"" Mf?$,,-,l)
V r,,,,. J'N,
... "-'\""" - .
~-~t~)2,L~..
(artMlJ~
2(1(~
~~ ~ b~4J;b---~f
~ 2{'1fu~ ~"!
r~c.--- ~V).s
~~~
~.:+o \ ~(