HomeMy WebLinkAbout2004 06 28 Consent 203
COMMISSION AGENDA
ITEM 203
CONSENT X
INFORMATIONAL
PUBLIC HEARING
REGULAR
June 28, 2004
Meeting
MGR (V /DEPT /ff
Authorization
RlCQUEST: Utility Department Requesting Authorization to Execute Amendment 82 with CPR
Engineers, Inc for the design of Electrical System Improvements to Water Treatment
Plant No. 3
PURPOSE: The purpose of this Board item is to request authorization to execute Amendment 82 with
CPR Engineers, Inc. of Orlando, Florida for the design of Electrical System Improvements
for Water Treatment Plant No.3 at a cost of $18,608.00
CONSIDERA TIONS:
This project is needed to upgrade the electrical system within water treatment plant #3 on
Bahama Road. The scope of design includes replacement of the power distribution system and
control system. The consultant will provide completed drawings, project specifications, and cost
estimates. In addition, the consultant will provide for the advertisement of bids, evaluate the bids,
and assist the city in evaluating and selecting a construction company to do the work.
These upgrades are needed to ensure reliability of the electrical system. This plant was
originally placed in service in 1972 with additions and upgrades in 1981. Currently some wiring has
corrosion due to chlorine gas that was once stored inside the facility. These upgrades will also
allow improved use of the SCADA system for monitoring the plant functions and equipment. The
design life of the upgrades should extend the life expectancy of the plant for another twenty-five
years.
JUlie 28, 2004
Consent Agenda Item 203
Page 2
FUNDING:
The proposed agreement amount of$18,608.00 is within the $100,000.00 Budgeted for this
project.
Rl~COMMENDA TION:
It is recommended that authorization be granted to enter into a contractual Agreement with
CPR Engineers, Inc. of Orlando, Florida for the design of Electrical System Improvements for
Water Treatment Plant No.3 at a cost of$18,608.00 which is payable from the Water and Sewer
Department Operating Expenditures line code (3600-62100).
INlPLEMENTA TION:
The design should be ready for bid within 120 days.
ATTACHMENTS:
1. Amendment 82
COMMISSION ACTION:
A TT ACHMENT NO. 1
AMENDMENT 82 TO AGREEMENT
DATED
NOVEMBER 27,1984
FOR
WATER TREATMENT ~LANT NO.3 ELECTRICAL SYSTEM IMPROVEMENTS
BETWEEN
THE CITY OF WINTER SPRINGS
AND
CPH ENGINEERS, INC.
This Amendment dated , 2004, by and between the City of Winter Springs (hereinafter
called the OWNER) and CPH Engineers, Inc. (hereinafter called the Engineer); is mutually agreed
upon and declared an authorized Amendment to an Agreement dated November 27, 1984, between
the parties, herein setting forth the scope, terms and conditions of the services herein authorized.
The appropriate provisions of the Agreement apply as fully as if repeated herein.
J:\Z6582\ProposaJs\Winter Springs\AMEND82 WTP No 3 Electrical System Improvements. doc
SECTION 1
GENERAL
1.1
The purpose of this Amendment is to provide for Engineering Services, more
specifically itemized herein, in the preparation of plans and specifications for the
construction of the electrical system improvements for the City's Water Treatment
Plant No.3.
SECTION 2
BASIC SERVICES OF THE ENGINEER
2.1 GENERAL
2.1.1 The ENGINEER agrees to perform professional services in connection with the
project as hereinafter stated.
2.1.2 The ENGINEER will serve as the OWNER'S professional engineering representative
in those phases of the project to which this Amendment applies, and will give
consultation and advice to the OWNER during the performance of his services. The
ENGINEER will perform the services for the. City Commission under the general
supervision of the City Manager and Utilities Director and will submit interim plans to
them for their review, input, decision, etc. as appropriate.
SECTION 3
SCOPE OF SERVICES
3.1
GENERAL
The OWNER hereby authorizes the ENGINEER to proceed with the preparation of
plans and specifications for Water Treatment Plant No. 3 Electrical System
Improvements. The plans will be based on available data and the existing plans.
3.2 Design
3.2.1 Provide through a subconsultant, electrical services as required by the project.
3.2.2. The electrical subconsultant shall provide services to include the design of the
electrical system for the replacement of the existing power distribution and control
system at WTP NO.3.
3.2.3 The electrical subconsultant's tasks are as follows:
. Provide completed drawings for the proposed work;
. Provide final project specifications;
· Provide final Cost Estimate of proposed work;
· Attend meetings to answer questions as necessary;
· Provide coordination with local power company.
3.2.4 The Electrical Design Plans Sheet List is as follows:
J:\Z6582\Proposals\Winter SpringslAMEND82 WTP No 3 Electrical System Improvements.doc
Sheet No.
C-1
E-1
E-2
E-3
E-4
E-5
E-6
Sheet Title
Cover Sheet
Symbols & Abbreviations
Electrical Site Plan
Single Line Diagram
Elementary Control Diagram
Pump Station Electrical Plan
Electrical Details
3.3
BIDDING SERVICES FOR WATER TREATMENT PLANT NO.3 ELECTRICAL
SYSTEM IMPROVEMENTS
The ENGINEER will provide the Contract Documents for bidding purposes
3.3.1 Prepare advertisement for bid for placement in appropriate publications by the
. OWNER.
3.3.2 Distribute and keep records of the distribution of documents to bidders and .
suppliers.
3.3.3 Issue addenda to the documents as required.
3.3.4 Answer questions of bidders and suppliers. No interpretations of the documents
shall be made other than through issuance of addenda to the documents.
3.3.5 Attend the bid opening and OWN ER'S meetings at which time bids are to be opened
and contracts awarded.
3.3.6 Evaluate the bids and assist the OWNER in the selection of the construction
contractor.
3.3.7 Consult with the OWNER and participate in all decisions as to acceptability of
subcontractors, other persons, and organizations proposed by the general contractor
for these portions of the work for which subcontractor approval is required by the
documents.
3.3.8 Prepare and review contracts, bonds, insurance certificates, construction schedules
anq other portions of the Contracts in order to assist the OWNER in his
determination as to whether to issue a Notice to Proceed to the Contractor.
J:\Z6582\Proposals\Winter Springs\AMEND82 WTP No 3 Electrical System Improvements.doc
SECTION 4
SUPPLEMENTARY SERVICES OF THE ENGINEER
4.1 If authorized in writing by the OWNER prior to the rendering of such services, the
ENGINEER will furnish or obtain under subcontracts, supplementary services of the
following types which will be paid for by the OWNER as described in SECTION 6,
Paragraph 6.1.2.
4.2.1 Additional services due to significant changes in the scope of the project or its
design including, but not limited to, changes in size, complexity, character of
construction or due to time delays in initiating or completion of the work as described
herein.
4.2.2 Additional services in connection with the project including services normally
furnished by the OWNER as described in Section 5 herein and services not
otherwise provided for in this Amendment.
4.2.3 Preparing to serve and serving as an expert witness for the OWNER in any protest,
litigation, or other proceeding involving the project.
4.2.4 Additional engineering services required by revisions to regulations (after the date of
this Amendment) as applicable to the Florida Department of Environmental
Protection, the St. Johns River Water Management District, or other regulatory
agency requirements.
4.2.5 Provide, through a subconsultant, additional surveying services if required or
requested by the OWNER.
4.2.6 Provide, through a subconsultant, soils investigation and geohydrological services if
required or requested by the OWNER, or if required by SJRWMD or FDEP,
recommended by the ENGINEER and authorized by the OWNER.
J:\Z6582\Proposals\Winter Springs'AMEND82 WTP No 3 Electrical System Improvements.doc
SECTION 5
THE OWNER'S RESPONSIBILITIES
5.1
The OWNER will:
5.1.1
Advise the ENGINEER of his requirements for the project and designate a person to
act as the OWNER'S representative with respect to the work to be performed under
this Amendment, and such person shall have complete authority to transmit
instructions, receive information, interpret and define the OWNER'S policies and
decisions pertinent to the work covered by this Amendment.
5.1.2
Guarantee access to and make all provision for the ENGINEER to enter upon public
and private lands as required for the ENGINEER to perform his work under this
Amendment.
5.1.3
Provide data requested that is reasonably available on the existing utility systems,
population and projections, land use and planning information.
5.1.4
Provide personnel to locate facilities and mow, trim, or otherwise make them
accessible for inspection.
5.1.5
Examine all studies, reports, sketches, and other documents presented by the
ENGINEER and render decisions pertaining thereto within a reasonable time so as
not to delay the work of the ENGINEER.
5.1.6
Obtain approval of all governmental authorities having jurisdiction over the project,
and such approvals and consents from such other individuals or bodies as may be
necessary for completion of the Project. .
5.1.7
Furnish, or direct the ENGINEER in writing to provide at the OWNER'S expense,
soils investigations if advised in writing by the ENGINEER that they are necessary or
advisable.
5.1.8
Furnish, or direct the ENGINEER in writing to provide at the OWNER'S expense,
necessary additional services as stipulated in Section 4 of this Amendment, or other
services as required.
5.1.9
Provide such legal, accounting, and insurance counseling services as may be
required for the project, and such auditing services as the OWNER may require.
5.1.10
Give prompt written notice to the ENGINEER whenever the OWNER observes or
otherwise becomes aware of any defect in the Project.
J:\Z6582\Proposals\Winter Springs\AMEND82 WTP No 3 Electrical System Improvements.doc
SECTION 6
PAYMENT
6.1
PAYMENT
Payments for services and expenses of the ENGINEER to be as set forth below:
6.1.1 Principals and Employees of the ENGINEER.
6.1.2 The fee for the scope of services described herein will be provided for a lump sum
fee of $18,608.00, including bidding services. No inspection or construction
administration services are included in this fee. A breakdown by task is included in
Attachment A.
6.2 REIMBURSED EXPENSES
6.2.1 The OWNER will make prompt monthly payments in response to ENGINEER'S
monthly statements without retention for all categories of services rendered under
this Amendment and for reimbursable expenses incurred.
6.2.2 Charges for the services rendered by principals and employees as witnesses in any
litigation, hearing or proceeding in' accordance with Paragraph 4.2.3 will be
computed at a rate.of $650.00 per day or any portion thereof (but compensation for
time spent in preparing to appear in any such litigation, hearing or proceeding will be
computed on an hourly rate).
6.2.3 If this Amendment is terminated during prosecution of' the services prior to
completion of the services of Section 3, payments to be made in accordance with
Paragraph 6.1.1 and 6.2.1 on account of that and all prior work under this
Amendment shall be due and payable, and shall constitute total payment for services
rendered. In addition, upon termination, the ENGINEER shall be paid for any
Additional Services authorized and rendered under Section 4.
6.2.4 The ENGINEER shall promptly begin work on the services authorized by this
Amendment upon receipt of notice to proceed from the OWNER.
SECTION 7
GENERAL CONDITIONS
7.1
Since the ENGINEER has no control over the cost oflabor, materials, or equipment,
or over any construction contractor's method of determining prices, any opinions of
probable construction cost which may be provided in the services of this Amendment
are made on the basis of his experience and qualifications and represent his best'
judgment as a design professional familiar with the construction industry, but the
ENGINEER cannot and does not guarantee that bids or the construction cost will not
vary from opinions of probable cost prepared by him.
7.2
The OWNER and the ENGINEER each binds himself and his partners, successors,
executors, administrators and assigns to the other party of this Amendment and to
partners, successors, executors, administrators, and assigns of such other party in
respect to all covenants of this Amendment. Nothing herein shall be construed as
creating any personal liability on the part of any officer or agency of any public body,
which may be a party hereto, nor shall it be construed as giving any rights or benefits
hereunder to anyone other than the OWNER and the ENGINEER.
J:\Z6582\Proposals\Winter Springs\AMEND82 WTP No 3 Electrical System Improvements.doc
SECTION 8
8.1
The ENGINEER agrees to prosecute the work in a timely manner until the Project is
completed.
IN WITNESS WHEREOF, the parties hereto have made and executed this
Amendment the day and year first above written.
OWNER:
City of Winter Springs, Florida
ATTEST
By:
Date:
ENGINEER:
CPH Engineers, Inc.
:r~i~
By~~6-
Date: 5/.u,#;L
J:\Z6582\Proposals\Winter Springs\AMEND82 WTP No 3 Electrical System Improvements.doc
ATTACHMENT A
J:\Z6582\Proposals\Winter Springs\AMEND82 WTP No 3 Electrical System Improvements,doc
., '
Anticipated Budget Summary
CPH Coordination/Meetings and Input
Electrical design
Bidding services-well
$ 4,108
$11,000
$ 3.500
$18,608
Total Budqeted Cost
J:\Z6582\Proposals\Winter Springs\AMEND82 WTP No 3 Electrical System Improvements.doc
01'" ..,. \,f
7
. April 21, 2004
..
Mr. Sc;ottA. Breitens.tei~, P.E.
CPR E1i~neers, hlQ. .
1117 E. Rbbitison S1:reet.
Orlando, FL 32801 .'
Re: .Winter- SpnngsWTP No. 3..
. .City ofW;in!er Springs, Florida
'.
..... ;
bear 1vfr,.Breitenstejn:'
. ..... . ,. ,'. .' I.. : . " :. ," '.:' ..' .
We are pleased to'sl,lbniit out'iJroposai for electrical engineering"servicesfor the aboyeproject. bui..'
. serVices shall~inel~de the.folloWing:. . , , . ". .' . .
r' .
'. ' .' l..' l. ".. . _. .' . '" .
',' ',1. O;mipleteddrawings fox: th~ work, covering .all phases' of oUr desi~, in' accordance. with a. f0I11uit
'detenmmld by yoli~ . '. .
, .2,
, .
';~ip~1.;pr~ject ~pe6ific~tio~s~,.." -.
',r,' '..... -. ....' .'. I: . :
.... ,'. ,
. r . . '
. . ' .' J ,..- .
. Final cost ~stiirtate, for. the wor~ performed under this igteement. ....
..... ..... .......'..,
" .....~ - .' .......
. .~. " ,\:'~ . .
oW . . . ;. ,..~...... ..... -
3.- '.
. , .
. ,
Attend iliee~g.s to ~n~wer' questions. rele~antto Qur d~sign.. . '", ,,' ':
. 4,
. :5.
.. . .
.. ". . .
Coordination with: the local powei-< company.,' .
. .,... ." .;'..
, ~ .
I;.
. ' . Qut scope of serVices; shall incl~de, th~ d~sign of the electrical' systeln-for t4~:replac~m~nt.of the ~iistii1g .
poWer distri'b.4non and control sY$tein:.' :the' atta~ht<.d sheet list fUrther d6tmes 61;if scope~ of wor~: OUi~fe~ '
for th.i~ ~ork sha~ll?e $ltqOQ.M, i:Jaya~leas follows: ' '_ .' . ;.... ..' -,' '.' _'. .
30%' Corriplete.~:WheIl Plans are 30% Complete :
~O%. Complete .~ Wh~n?ians' are 6q%'Compl~te' '
'_ 1~0%'C6IIlplete -~~n:.,~lans ar~ Complete
.:, $3,300.00.
$3,300.QO,
.$4;400.00
, ,
..........~~
~!:j;. B~iI~y,P;.E.
. ',:' : ~" . -, : . .'
'. RfCaVt:D
,.~p~ '2' '6 '2004"
. iONKOt\ ;aita14 HGHAES.
. DATE . O~A~~n ~ll~*~'
ACC~I) .'
. ,
",
CPH-03..Q02D
.. .
~~ 2101 N. ANDREWS AVENUE, SUITE 100, FORT LAUDERQALE, FLORIDA,33311
-.. 1"1: t). ~" . ...
.,....
, '
, ,
,'.
..,
,:' l..'
. "
," ,;
.;. "
. '
WiNTER SPRI~GS W'tP NO.. 3 , ,
CITY OF WIN'f.ER SPRINGS~ fJ;.ORIDA
: ~LECTm;CAL SHEET LIST
April 21, 2004 ,
, , Sheet No.
E-I
, .~':2'
'" - '~E~3"
E;.4
E;S
E~6:
".f'
,"
- ' ,
, "
~ ~ ,
. .,
, . .
',I -
" "
. , ~ ~ . ..'
Sheef Title,
, -
SJ?11pols '& Abbrev.latioiis
. Electrical Site Plan '
, ,
. . ,'. , ,
,'. Singl~ ~ine b'~agram
Elerrientaiy Control Dia~ani
.. . '..
. ,:.. .. -,' ."
. fUJ11p, Sta~~~ Electric,aq>lan
, Electric~l Details' ,
:-' I"
. .
I .:
. '., .
.,....
.' ')
" ,
,I .'
.' r .
; l ;1
'"
: - ~
'. /'"
, '
'.
PER PUBLIC WORKS
DEPARTMENT DIRECTOR,
THERE IS NO ORIGINAL OF
THIS CONTRACT.
AMENDMENT 82 TO AGREEMENT
DATED
NOVEMBER 27, 1984
FOR
WATER TREATMENT PLANT N0.3 ELECTRICAL SYSTEM IMPROVEMENTS
BETWEEN
THE CITY OF WINTER SPRINGS
AND
CPH ENGINEERS, INC.
This Amendment dated , 2004, by and between the City of Winter Springs (hereinafter
called the OWNER) and CPH Engineers, Inc. (hereinafter called the Engineer), is mutually agreed
upon and declared an authorized Amendment to an Agreement dated November 27,1984, between
the parties, herein setting forth the scope, terms and conditions of the services herein authorized.
The appropriate provisions of the Agreement apply as fully as if repeated herein.
J:\Z65i32\ProposalslWinter SpringslAMEND82 WTP No 3 Electrirai System tmprovements.doc
SECTION 1
GENERAL.
1.1 The purpose of this Amendment is to provide for Engineering Services, more
specifically itemized herein, in the preparation of plans and specifications for the
construction of the electrical system improvements for the City's Wafer Treatment
Plant No. 3.
SECTION 2
BASIC SERVICES OF THE ENGINEER
2.1 GENERAL
2.1.1 The ENGINEER agrees to perform professional services in connection with the
project as hereinafter stated.
2.1.2 The ENGINEER will serve as the OWNER'S professional engineering representative
in those phases of the project to which this Amendment applies, and will give
consultation and advice to the OWNER during the performance of his services. The
ENGINEER will perform the services for the City Commission under the general
supervision of the City Manager and Utilities Director and will submit interim plans to
them for their review, input, decision, etc. as appropriate.
SECTION 3
SCOPE OF SERVICES
3.1 GENERAL
The OWNER hereby authorizes the ENGINEER to proceed with the preparation of
plans and specifications for Water Treatment Plant No. 3 Electrical System
Improvements. The plans will be based on available data and the existing plans.
3.2 Design
3.2.1 Provide through a subconsultant, electrical services as required by the project.
3.2.2. The electrical subconsultant shall provide services to include the design of the
electrical system for the replacement of the existing power distribution and control
system at WTP No. 3.
3.2.3 The electrical subconsultant's tasks are as follows:
• Provide completed drawings for the proposed work;
• Provide final project specifications;
• Provide final Cost Estimate of proposed work;
• Attend meetings to answer questions as necessary;
• Provide coordination with local power company.
3.2.4 The Electrical Design Plans Sheet List is as follows:
J:~Z658?_\Proposafs\Winter SpringsWMEND82 WTP No 3 Electrical System Improvements.doc
Sheet No. Sheet Title
C-1 Cover Sheet
E-1 Symbols & Abbreviations
E-2 Electrical Site Plan
E-3 Single Line Diagram
E-4 Elementary Control Diagram
E-5 Pump Station Electrical Plan
E-6 Electrical Details
3.3 BIDDING SERVICES FOR WATER TREATMENT PLANT NO. 3 ELECTRICAL
SYSTEM IMPROVEMENTS
The ENGINEER will provide the Contract Documents for bidding purposes
3.3.1 Prepare advertisement for bid far placement in appropriate publications by the
OWNER.
3.3.2 Distribute and keep records of the distribution of documents to bidders and
suppliers.
3.3.3 Issue addenda to the documents as required.
3.3.4 Answer questions of bidders and suppliers. No interpretations of the documents
shall be made other than through issuance of addenda to the documents.
3.3.5 Attend the bid opening and OWNER'S meetings at which time bids are to be opened
and contracts awarded.
3.3.6 Evaluate the bids and assist the OWNER in the selection of the construction
contractor.
3.3.7 Consult with the OWNER and participate in all decisions as to acceptability of
subcontractors, other persons, and organizations proposed by the general contractor
for these portions of the work for which subcontractor approval is required by the
documents.
3.3.8 Prepare and review contracts, bonds, insurance certificates, construction schedules
and other portions of the Contracts in order to assist the OWNER in his
determination as to whether to issue a Notice to Proceed to the Contractor.
J:1Z658'L1Proposals\Winter Springs~AMEND£32 WTP No 3 Electrical System Irnprovernents.doc
SECTION 4
SUPPLEMENTARY SERVICES OF THE ENGINEER
4.1 If authorized in writing by the OWNER prior to the rendering of such services, the
ENGINEER will furnish or obtain under subcontracts, supplementary services of the
following types which will be paid for by the OWNER as described in SECTION 6,
Paragraph 6.1.2.
4.2.1 Additional services due to significant changes in the scope of the project or its
design including, but not limited to, changes in size, complexity, character of
construction or due to time delays in initiating or completion of the work as described
herein.
4.2.2 Additional services in connection with the project including services normally
furnished by the OWNER as described in Section 5 herein and services not
otherwise provided for in this Amendment.
4.2.3 Preparing to serve and serving as an expert witness for the OWNER in any protest,
litigation, or other proceeding involving the project.
4.2.4 Additional engineering services required by revisions to regulations (afterthe date of
this Amendment) as applicable to the Florida Department of Environmental
Protection, the St. Johns River Water Management District, or other regulatory
agency requirements.
4.2.5 Provide, through a subconsultant, additional surveying services if required or
requested by the OWNER.
4.2.6 Provide, through a subconsultant, soils investigation and geohydrological services if
required or requested by the OWNER, or if required by SJRWMD or FDEP,
recommended by the ENGINEER and authorized by the OWNER.
J:\Z6582\ProposalslWinter SpringsWMEND82 WTP No 3 Electrical System Improvements.doc
SECTION 5
THE OWNER'S RESPONSIBILITIES
5.1 The OWNER will:
5.1.1 Advise the ENGINEER of his requirements for the project and designate a person to
act as the OWNER'S representative with respect to the work to be performed under
this Amendment, and such person shall have complete authority to transmit
instructions, receive information, interpret and define the OWNER'S policies and
decisions pertinent to the work covered by this Amendment.
5.1.2 Guarantee access to and make all provision forthe ENGINEER to enter upon public
and private lands as required for the ENGINEER to perform his work under this
Amendment.
5.1.3 Provide data requested that is reasonably available on the existing utility systems,
population and projections, land use and planning information.
5.1.4 Provide personnel to locate facilities and mow, trim, or otherwise make them
accessible for inspection.
5.1.5 Examine all studies, reports, sketches, and other documents presented by the
ENGINEER and render decisions pertaining thereto within a reasonable time so as
not to delay the work of the ENGINEER.
5.1.6 Obtain approval of all governmental authorities having jurisdiction over the project,
and such approvals and consents from such other individuals or bodies as may be
necessary for completion of the Project.
5.1.7 Furnish, or direct the ENGINEER in writing to provide at the OWNER'S expense,
soils investigations if advised in writing by the ENGINEER that they are necessary or
advisable.
5.1.8 Fumish, or direct the ENGINEER in writing to provide at the OWNER'S expense,
necessary additional services as stipulated in Section 4 of this Amendment, or other
services as required.
5.1.9 Provide such legal, accounting, and insurance counseling services as may be
required for the project, and such auditing services as the OWNER may require.
5.1.10 Give prompt written notice to the ENGINEER whenever the OWNER observes or
otherwise becomes aware of any defect in the Project.
J:~Z65F32\ProposalslWinter Springs\AMEND82 WTP No 3 Electrical System Improvernents.doc
SECTION 6
PAYMENT
6.1 PAYMENT
Payments for services and expenses of the ENGINEER to be as set forth below:
6.1.1 Principals and Employees of the ENGINEER.
6.1.2 The fee for the scope of services described herein will be provided for a lump sum
fee of $18,608.00, including bidding services. No inspection or construction
administration services are included in this fee. A breakdown by task is included in
Attachment A.
6.2 REIMBURSED EXPENSES
6.2.1 The OWNER will make prompt monthly payments in response to ENGINEER'S
monthly statements without retention for all categories of services rendered under
this Amendment and for reimbursable expenses incurred.
6.2.2 Charges for the services rendered by principals and employees as witnesses in any
litigation, hearing or proceeding in accordance with Paragraph 4.2.3 will be
computed at a rate of $650.00 per day or any portion thereof (but compensation for
time spent in preparing to appear in any such litigation, hearing or proceeding will be
computed on an hourly rate).
6.2.3 If this Amendment is terminated during prosecution of the services prior to
completion of the services of Section 3, payments to be made in accordance with
Paragraph 6.1.1 and 6.2.1 on account of that and all prior work under this
Amendment shall be due and payable, and shall constitute total payment for services
rendered_ In addition, upon termination, the ENGINEER shall be paid for any
Additional Services authorized and rendered under Section 4.
6.2.4 The ENGINEER shall promptly begin work on the services authorized by this
Amendment upon receipt of notice to proceed from the OWNER.
SECTION 7
GENERAL CONDITIONS
7.1 Since the ENGINEER has no control overthe cost of.labor, materials, or equipment,
or over any construction contractor's method of determining prices, any opinions of
probable construction cost which may be provided in the services of this Amendment
are made on the basis of his experience and qualifications and represent his best
judgment as a design professional familiar with the construction industry, but the
ENGINEER cannot and does not guarantee that bids or the construction costwill not
vary from opinions of probable cost prepared by hiKn.
7.2 The OWNER and the ENGINEER each binds himself and his partners, successors,
executors, administrators and assigns to the other party of this Amendment and to
partners, successors, executors, administrators, and assigns of such other party in
respect to all covenants of this Amendment. Nothing herein shall be construed as
creating any personal liability on the part of any officer or agency of any public body,
which may be a party hereto, nor shall it be construed as giving any rights or benefits
hereunder to anyone other than the OWNER and the ENGINEER.
J:\Z6582\Proposals\Winter SpringsV~MEND82 WTP No 3 Electrical System Improvements.doc
8.1
SECTION 8
The ENGINEER agrees to prosecute the work in a timely manner until the Project is
completed.
IN WITNESS WHEREOF, the parties hereto have made and executed this
Amendment the day and year first above written.
OWNER:
City of Winter Springs, Florida
ay:
Date: ~' 9/0 5'~
--~--~
ATT S r- ~~
ENGINEER:
CPH Engineers, Inc.
By.
Date: v ~2d~4 `7~'
~~
J:1Z(i582\Proposals\Winier Springs\AMEND82 WTP No 3 Electrical Systzm Improvements.doc
ATTACHMENT A
J:1Z6582\ProposalslWinter SpringsWMEND82 WTP No 3 Electrical System Improvements.doc
Anticipated Budget Summary
CPH Coordination/Meetings and Input $ 4,108
Electrical design $11,000
Bidding services-kveH- 3 500
Total Budgeted Cost
$18,608
J:1Z65821Proposals\Winter SpringsWMEND82. WTP No 3 Electrical System Improvements.doc
CITY OF WINTER SPRINGS, FLORIDA
1126 EAST STATE ROAD 434
WINTER SPRINGS, FLORIDA 32708-2799
Telephone (407) 327-1800
Utility /Public Works
Department
August 9, 2004
Terry Zaudtke
1117 East Robinson Street
Suite C
Orlando, Florida 32801
m
~~
Reference: Amendment 82 to Agreement for Water Treatment Plant No. 3, Electrical
System Improvements
Dear Terry Zaudtke:
Enclosed you will find the signed Amendment 82 to the Agreement for Water Treatment
Plant No. 3, Electrical System Improvements. The City wishes to begin this project at the
earliest date possible. Please let Kip Lockcuff and me know of a date that we can meet to
begin discussion for the project.
Sincerely,
w
Grego ishop
Capital Projects Coordinator
407-327-5984
407-327-6695 fax
gbishop@winterspringsfl.org