HomeMy WebLinkAbout2006 03 27 Consent Item 401 Electrical System Improvements
COMMISSION AGENDA
ITEM 401
CONSENT X
March 27,2006
Meeting
MGR / DEPT
Authorization
REQUEST: Utility Department Requesting Authorization to enter into a Contractual Agreement
for design of Electrical System Improvements to Water Treatment Plant No.2
PURPOSE: The purpose of this Board item is to request authorization to enter into a contractual
agreement with CPH Engineers, Inc. of Orlando, Florida for the design of Electrical System
Improvements for Water Treatment Plant NO.2 at a cost of $27,400.00
CONSIDERATIONS:
This project is needed to upgrade the electrical system with in the water treatment plant.
The scope of design includes replacement of the power distribution system and control system. The
consultant will provide completed drawings, project specifications, and cost estimates. In addition,
the consultant will provide for the advertisement of bids, evaluate the bids, and assist the city in
evaluating and selecting a construction company to do the work.
These upgrades are needed to ensure reliability of the electrical system. Currently some
wiring has corrosion due to chlorine gas that was once stored inside the facility. These upgrades
will also allow improved use of the SCADA system for monitoring the plant functions and
equipment. The design life of the upgrades should extend the life expectancy of the plant for
another twenty-five years.
March 27,2006
Consent Agenda Item 401
Page 2
FUNDING:
The proposed agreement amount of $27,.400.00 exceeds the $20,000.00 Budgeted for this
project. The additional funding will be transferred from 3600-62100 West Force Main Re-Routing
Project which will only be in design this fiscal year.
RECOMMENDATION:
It is recommended that authorization be granted to enter into a contractual Agreement with
CPR Engineers, Inc. of Orlando, Florida for the design of Electrical System Improvements for
Water Treatment Plant No.2 at a cost of $27,400.00 which is payable from the Water and Sewer
Department Operating Expenditures line code (3600-62100-30028).
ATTACHMENTS:
1. Amendment 85 For WTP No.2
COMMISSION Ae'TION:
AMENDMENT 85
FOR
WATER TREATMENT PLANT NO.2
ELECTRICAL SYSTEM IMPROVEMENTS
BETWEEN
THE CITY OF WINTER SPRINGS
AND
CPH ENGINEERS, INC.
This Amendment dated , 2006, by and between the City of Winter Springs (hereinafter
called the OWNER) and CPH Engineers, Inc. (hereinafter called the Engineer), is mutually agreed
upon and declared an authorized Amendment to an Agreement dated November 27, 1984, between
the parties, herein setting forth the scope, terms and conditions of the services herein authorized.
The appropriate provisions of the Agreement apply as fully as if repeated herein.
J:\Z6582\Proposals\Winter SpringslAMEND85 WTP No 2 Electrical System Improvements.doc
SECTION 1
GENERAL
1.1
The purpose of this Amendment is to provide for Engineering Services, more
specifically itemized herein, in the preparation of plans and specifications for the
construction of the electrical system improvements for the City's Water Treatment
Plant NO.2.
SECTION 2
BASIC SERVICES OF THE ENGINEER
2.1 GENERAL
2.1.1 The ENGINEER agrees to perform professional services in connection with the
project as hereinafter stated.
2.1.2 The ENGINEER will serve as the OWNER'S professional engineering representative
in those phases of the project to which this Amendment applies, and will give
consultation and advice to the OWNER during the performance of his services. The
ENGINEER will perform the services for the City Commission under the general
supervision of the City Manager and Utilities Director and will submit interim plans to
them for their review, input, decision, etc. as appropriate.
SECTION 3
SCOPE OF SERVICES
3.1
GENERAL
The OWNER hereby authorizes the ENGINEER to proceed with the preparation of
plans and specifications for Water Treatment Plant No. 2 Electrical System
Improvements. The plans will be based on available data and the existing plans.
3.2 Design
3.2.1 Provide through a subconsultant, electrical services as required by the project.
3.2.2. The electrical subconsultant shall provide services to include the design of the
electrical system for the replacement of the existing power distribution and control
system at WTP NO.2.
3.2.3 The electrical subconsultant's tasks are as follows:
. Provide completed drawings for the proposed work;
. Provide final project specifications;
. Provide final Cost Estimate of proposed work;
. Attend meetings to answer questions as necessary;
. Provide coordination with local power company.
3.2.4 The Electrical Design Plans Sheet List is as follows:
J:\Z6582\Proposals\Winter SpringslAMEND85 WTP No 2 Electrical System Improvements.doc
Sheet No.
C-1
E-1
E-2
E-3
E-4
E-5
E-6
Sheet Title
Cover Sheet
Symbols & Abbreviations
Electrical Site Plan
Single Line Diagram
Elementary Control Diagram
Pump Station Electrical Plan
Electrical Details
3.3
BIDDING SERVICES FOR WATER TREATMENT PLANT NO.2 ELECTRICAL
SYSTEM IMPROVEMENTS
The ENGINEER will provide the Contract Documents for bidding purposes
3.3.1 Prepare advertisement for bid for placement in appropriate publications by the
OWNER.
3.3.2 Distribute and keep records of the distribution of documents to bidders and
suppliers.
3.3.3 Issue addenda to the documents as required.
3.3.4 Answer questions of bidders and suppliers. No interpretations of the documents
shall be made other than through issuance of addenda to the documents.
3.3.5 Attend the bid opening and OWNER'S meetings at which time bids are to be opened
and contracts awarded.
3.3.6 Evaluate the bids and assist the OWNER in the selection of the construction
contractor.
3.3.7 Consult with the OWNER and participate in all decisions as to acceptability of
subcontractors, other persons, and organizations proposed by the general contractor
for these portions of the work for which subcontractor approval is required by the
documents.
3.3.8 Prepare and review contracts, bonds, insurance certificates, construction schedules
and other portions of the Contracts in order to assist the OWNER in his
determination as to whether to issue a Notice to Proceed to the Contractor.
J:\Z6582\Proposals\Winter SpringslAMEND85 WTP No 2 Electrical System Improvements.doc
SECTION 4
SUPPLEMENTARY SERVICES OF THE ENGINEER
4.1 If authorized in writing by the OWNER prior to the rendering of such services, the
ENGINEER will furnish or obtain under subcontracts, supplementary services ofthe
following types which will be paid for by the OWNER as described in SECTION 6,
Paragraph 6.1.2.
4.2.1 Additional services due to significant changes in the scope of the project or its
design including, but not limited to, changes in size, complexity, character of
construction or due to time delays in initiating or completion of the work as described
herein.
4.2.2 Additional services in connection with the project including services normally
furnished by the OWNER as described in Section 5 herein and services not
otherwise provided for in this Amendment.
4.2.3 Preparing to serve and serving as an expert witness for the OWNER in any protest,
litigation, or other proceeding involving the project.
4.2.4 Additional engineering services required by revisions to regulations (after the date of
this Amendment) as applicable to the Florida Department of Environmental
Protection, the St. Johns River Water Management District, or other regulatory
agency requirements.
4.2.5 Provide, through a subconsultant, additional surveying services if required or
requested by the OWNER.
4.2.6 Provide, through a subconsultant, soils investigation and geohydrological services if
required or requested by the OWNER, or if required by SJRWMD or FDEP,
recommended by the ENGINEER and authorized by the OWNER.
J:\Z6582\Proposals\Winter Springs\AMEND85 WTP No 2 Electrical System Improvements.doc
SECTION 5
THE OWNER'S RESPONSIBILITIES
5.1
The OWNER will:
5.1.1
Advise the ENGINEER of his requirements for the project and designate a person to
act as the OWNER'S representative with respect to the work to be performed under
this Amendment, and such person shall have complete authority to transmit
instructions, receive information, interpret and define the OWNER'S policies and
decisions pertinent to the work covered by this Amendment.
5.1.2
Guarantee access to and make all provision for the ENGINEER to enter upon public
and private lands as required for the ENGINEER to perform his work under this
Amendment.
5.1.3
Provide data requested that is reasonably available on the existing utility systems,
population and projections, land use and planning information.
5.1.4
Provide personnel to locate facilities and mow, trim, or otherwise make them
accessible for inspection.
5.1.5
Examine all studies, reports, sketches, and other documents presented by the
ENGINEER and render decisions pertaining thereto within a reasonable time so as
not to delay the work of the ENGINEER.
5.1.6
Obtain approval of all governmental authorities having jurisdiction over the project,
and such approvals and consents from such other individuals or bodies as may be
necessary for completion of the Project.
5.1.7
Furnish, or direct the ENGINEER in writing to provide at the OWNER'S expense,
soils investigations if advised in writing by the ENGINEER that they are necessary or
advisable.
5.1.8
Furnish, or direct the ENGINEER in writing to provide at the OWNER'S expense,
necessary additional services as stipulated in Section 4 of this Amendment, or other
services as required.
5.1.9
Provide such legal, accounting, and insurance counseling services as may be
required for the project, and such auditing services as the OWNER may require.
5.1.10
Give prompt written notice to the ENGINEER whenever the OWNER observes or
otherwise becomes aware of any defect in the Project.
J:\Z6582\Proposals\Winter Springs\AMEND85 WTP No 2 Electrical System Improvements.doc
SECTION 6
PAYMENT
6.1
PAYMENT
Payments for services and expenses of the ENGINEER to be as set forth below:
6.1.1 Principals and Employees of the ENGINEER.
6.1.2 The fee for the scope of services described herein will be provided for a lump sum
fee of $27,400.00, including bidding services. No inspection or construction
administration services are included in this fee. A breakdown by task is included in
Attachment A.
6.2 REIMBURSED EXPENSES
6.2.1 The OWNER will make prompt monthly payments in response to ENGINEER'S
monthly statements without retention for all categories of services rendered under
this Amendment and for reimbursable expenses incurred.
6.2.2 Charges for the services rendered by principals and employees as witnesses in any
litigation, hearing or proceeding in accordance with Paragraph 4.2.3 will be
computed at a rate of $650.00 per day or any portion thereof (but compensation for
time spent in preparing to appear in any such litigation, hearing or proceeding will be
computed on an hourly rate).
6.2.3 If this Amendment is terminated during prosecution of the services prior to
completion of the services of Section 3, payments to be made in accordance with
Paragraph 6.1.1 and 6.2.1 on account of that and all prior work under this
Amendment shall be due and payable, and shall constitute total payment for services
rendered. In addition, upon termination, the ENGINEER shall be paid for any
Additional Services authorized and rendered under Section 4.
6.2.4 The ENGINEER shall promptly begin work on the services authorized by this
Amendment upon receipt of notice to proceed from the OWNER.
SECTION 7
GENERAL CONDITIONS
7.1
Since the ENGI NEER has no control over the cost of labor, materials, or equipment,
or over any construction contractor's method of determining prices, any opinions of
probable construction cost which may be provided in the services ofthis Amendment
are made on the basis of his experience and qualifications and represent his best
judgment as a design professional familiar with the construction industry, but the
ENGINEER cannot and does not guarantee that bids orthe construction cost will not
vary from opinions of probable cost prepared by him.
7.2
The OWNER and the ENGINEER each binds himself and his partners, successors,
executors, administrators and assigns to the other party of this Amendment and to
partners, successors, executors, administrators, and assigns of such other party in
respect to all covenants of this Amendment. Nothing herein shall be construed as
creating any personal liability on the part of any officer or agency of any public body,
which may be a party hereto, nor shall it be construed as giving any rights or benefits
hereunder to anyone other than the OWNER and the ENGINEER.
J:\Z6582\Proposals\Winter Springs\AMEND85 WTP No 2 Electrical System Improvements.doc
SECTION 8
8.1
The ENGINEER agrees to prosecute the work in a timely manner until the Project is
completed.
IN WITNESS WHEREOF, the parties hereto have made and executed this
Amendment the day and year first above written.
OWNER:
City of Winter Springs, Florida
ATTEST
By:
Date:
ENGINEER:
CPH Engineers, Inc.
BY
Date: 2/27/06
J:\Z6582\Proposals\Winter Springs\AMEND85 WTP No 2 Electrical System Improvements.doc
ATTACHMENT A
Cost Summary
And
Subconsultant Proposal
J:\Z6582\Proposals\Winter Springs\AMEND85 WTP No 2 Electrical System Improvements.doc
Anticipated Budget Summary
CPH Coordination/Meetings and Input
Electrical design
Bidding services
$ 5,500
$17,600
$ 4.300
$27,400
Total Budgeted Cost
J:\Z6582\Proposals\Winter Springs\AMEND85 WTP No 2 Electrical System Improvements.doc
ENGINEERING
BAILEY
CONSULTANTS
February 21,2006
Mr. Terry M. Zaudtke, P.E., DEE
Chief Operating Officer
CPH Engineers, Inc.
1117 E. Robinson Street, Suite C
Orlando,FL 32801 '
Re: Winter Springs WTP No.2
City of Winter Springs, Florida
Dear Mr. Zaudtke:
Weare pleased to submit our proposal for electrical design services for the above referenced project Services shall
include completed drawings (ACAD format), covering all phases of our design, preliminary and final project
specifications and preliminary and final cost estimates for the work performed under this agreement Our design work
scope shall include the items outlined below:
1. Electrical design associated providing three (3) new pumps.
· One (1) at 150HP constant speed
· One (1) at 50HP constant speed with provisions for a future 75HP pump.
· One (I) at 75HP constant speed With provisions for a future 150HP VFD pump
2. Electrical Design associated with replacing the existing panelboard in the CL2 area.
3. Electrical design associated with replacing all interior and exterior exit lighting.
.4. Coordinate with Progress Energy of Florida (PEF) as required for the proposed electrical service upgrade. The
existing pole mounted transformers will be replaced with a new pad mounted transformer
It is to our understanding that provisions for a future standby generator will be included in the design. Our fee for this
work shall be $17,600.00, payable as follows:
When PlaIls are 70% Complete
When Plans are 100% Complete
$ 12,320.00
$ 5,280.00
ACCEPTED
DATE
CPH-06-00lD.doc
*
4733 W. ATLANTIC AVENUE, SUITE 12-C, DELRAY BEACH, FLORIDA 33445
TEL: (561) 819-0488 . FAX: (561) 819-5557 . WEB: www.baileyengineering.com
AMENDMENT 85
FOR
WATER TREATMENT PLANT NO.2
ELECTRICAL SYSTEM IMPROVEMENTS
BETWEEN
THE CITY OF WINTER SPRINGS
AND
CPH ENGINEERS, INC.
This Amendment dated I 2006, by and between the City of Winter Springs (hereinafter
called the OWNER) and CPH Engineers, Inc. (hereinafter called the Engineer), is mutually agreed
upon and declared an authorized Amendment to an Agreement dated November 27, 1984, between
the parties, herein setting forth the scope, terms and conditions of the services herein authorized.
The appropriate provisions of the Agreement apply as fully as if repeated herein.
J:\Z6582\Proposals\Winter SpringslAMEND85 WTP No 2 Electrical System Improvements.doc
SECTION 1
GENERAL
1.1
The purpose of this Amendment is to provide for Engineering Services, more
specifically itemized herein, in the preparation of plans and specifications for the
construction of the electrical system improvements for the City's Water Treatment
Plant NO.2.
SECTION 2
BASIC SERVICES OF THE ENGINEER
2.1 GENERAL
2.1.1 The ENGINEER agrees to perform professional services in connection with the
project as hereinafter stated.
2.1.2 The ENGINEER will serve as the OWNER'S professional engineering representative
in those phases of the project to which this Amendment applies, and will give
consultation and advice to the OWNER during the performance of his services. The
ENGINEER will perform the services for the City Commission under the general
supervision of the City Manager and Utilities Director and will submit interim plans to
them for their review, input, decision, etc. as appropriate.
SECTION 3
SCOPE OF SERVICES
3.1
GENERAL
The OWNER hereby authorizes the ENGINEER to proceed with the preparation of
plans and specifications for Water Treatment Plant No. 2 Electrical System
Improvements. The plans will be based on available data and the existing plans.
3.2 Design
3.2.1 Provide through a subconsultant, electrical services as required by the project.
3.2.2. The electrical subconsultant shall provide services to include the design of the
electrical system for the replacement of the existing power distribution and control
system at WTP NO.2.
3.2.3 The electrical subconsultant's tasks are as follows:
. Provide completed drawings for the proposed work;
. Provide final project specifications;
. Provide final Cost Estimate of proposed work;
. Attend meetings to answer questions as necessary;
. Provide coordination with local power company.
3.2.4 The Electrical Design Plans Sheet List is as follows:
J:\Z6582\Proposals\Winter Springs\AMEND85 WTP No 2 Electrical System Improvements.doc
Sheet No.
C-1
E-1
E-2
E-3
E-4
E-5
E-6
Sheet Title
Cover Sheet
Symbols & Abbreviations
Electrical Site Plan
Single Line Diagram
Elementary Control Diagram
Pump Station Electrical Plan
Electrical Details
3.3
BIDDING SERVICES FOR WATER TREATMENT PLANT NO.2 ELECTRICAL
SYSTEM IMPROVEMENTS
The ENGINEER will provide the Contract Documents for bidding purposes
3.3.1 Prepare advertisement for bid for placement in appropriate publications by the
OWNER.
3.3.2 Distribute and keep records of the distribution of documents to bidders and
suppliers.
3.3.3 Issue addenda to the documents as required.
3.3.4 Answer questions of bidders and suppliers. No interpretations of the documents
shall be made other than through issuance of addenda to the documents.
3.3.5 Attend the bid opening and OWNER'S meetings at which time bids are to be opened
and contracts awarded.
3.3.6 Evaluate the bids and assist the OWNER in the selection of the construction
contractor.
3.3.7 Consult with the OWNER and participate in all decisions as to acceptability of
subcontractors, other persons, and organizations proposed by the general contractor
for these portions of the work for which subcontractor approval is required by the
documents.
3.3.8 Prepare and review contracts, bonds, insurance certificates, construction schedules
and other portions of the Contracts in order to assist the OWNER in his
determination as to whether to issue a Notice to Proceed to the Contractor.
J:\Z6582\Proposals\Winter Springs\AMEND85 WTP No 2 Electrical System Improvements.doc
SECTION 4
SUPPLEMENTARY SERVICES OF THE ENGINEER
4.1 If authorized in writing by the OWNER prior to the rendering of such services, the
ENGINEER will furnish or obtain under subcontracts, supplementary services ofthe
following types which will be paid for by the OWNER as described in SECTION 6,
Paragraph 6.1.2.
4.2.1 Additional services due to significant changes in the scope of the project or its
design including, but not limited to, changes in size, complexity, character of
construction or due to time delays in initiating or completion of the work as described
herein.
4.2.2 Additional services in connection with the project including services normally
furnished by the OWNER as described in Section 5 herein and services not
otherwise provided for in this Amendment.
4.2.3 Preparing to serve and serving as an expert witness for the OWNER in any protest,
litigation, or other proceeding involving the project.
4.2.4 Additional engineering services required by revisions to regulations (after the date of
this Amendment) as applicable to the Florida Department of Environmental
Protection, the St. Johns River Water Management District, or other regulatory
agency requirements.
4.2.5 Provide, through a subconsultant, additional surveying services if required or
requested by the OWNER.
4.2.6 Provide, through a subconsultant, soils investigation and geohydrological services if
required or requested by the OWNER, or if required by SJRWMD or FDEP,
recommended by the ENGINEER and authorized by the OWNER.
J:\Z6582\Proposals\Winter Springs\AMEND85 WTP No 2 Electrical System Improvements.doc
SECTION 5
THE OWNER'S RESPONSIBILITIES
5.1
The OWNER will:
5.1.1
Advise the ENGINEER of his requirements for the project and designate a person to
act as the OWNER'S representative with respect to the work to be performed under
this Amendment, and such person shall have complete authority to transmit
instructions, receive information, interpret and define the OWNER'S policies and
decisions pertinent to the work covered by this Amendment.
5.1.2
Guarantee access to and make all provision forthe ENGINEER to enter upon public
and private lands as required for the ENGINEER to perform his work under this
Amendment.
5.1.3
Provide data requested that is reasonably available on the existing utility systems,
population and projections, land use and planning information.
5.1.4
Provide personnel to locate facilities and mow, trim, or otherwise make them
accessible for inspection.
5.1.5
Examine all studies, reports, sketches, and other documents presented by the
ENGINEER and render decisions pertaining thereto within a reasonable time so as
not to delay the work of the ENGINEER.
5.1.6
Obtain approval of all governmental authorities having jurisdiction over the project,
and such approvals and consents from such other individuals or bodies as may be
necessary for completion of the Project.
5.1.7
Furnish, or direct the ENGINEER in writing to provide at the OWNER'S expense,
soils investigations if advised in writing by the ENGINEER that they are necessary or
advisable.
5.1.8
Furnish, or direct the ENGINEER in writing to provide at the OWNER'S expense,
necessary additional services as stipulated in Section 4 of this Amendment, or other
services as required.
5.1.9
Provide such legal, accounting, and insurance counseling services as may be
required for the project, and such auditing services as the OWNER may require.
5.1.10
Give prompt written notice to the ENGINEER whenever the OWNER observes or
otherwise becomes aware of any defect in the Project.
J:\Z6582\Proposals\Winter SpringslAMEND85 WTP No 2 Electrical System Improvements.doc
SECTION 6
PAYMENT
6.1
PAYMENT
Payments for services and expenses of the ENGINEER to be as set forth below:
6.1.1 Principals and Employees of the ENGINEER.
6.1.2 The fee for the scope of services described herein will be provided for a lump sum
fee of $27,400.00, including bidding services. No inspection or construction
administration services are included in this fee. A breakdown by task is included in
Attachment A.
6.2 REIMBURSED EXPENSES
6.2.1 The OWNER will make prompt monthly payments in response to ENGINEER'S
monthly statements without retention for all categories of services rendered under
this Amendment and for reimbursable expenses incurred.
6.2.2 Charges for the services rendered by principals and employees as witnesses in any
litigation, hearing or proceeding in accordance with Paragraph 4.2.3 will be
computed at a rate of $650.00 per day or any portion thereof (but compensation for
time spent in preparing to appear in any such litigation, hearing or proceeding will be
computed on an hourly rate).
6.2.3 If this Amendment is terminated during prosecution of the services prior to
completion of the services of Section 3, payments to be made in accordance with
Paragraph 6.1.1 and 6.2.1 on account of that and all prior work under this
Amendment shall be due and payable, and shall constitute total payment for services
rendered. In addition, upon termination, the ENGINEER shall be paid for any
Additional Services authorized and rendered under Section 4.
6.2.4 The ENGINEER shall promptly begin work on the services authorized by this
Amendment upon receipt of notice to proceed from the OWNER.
SECTION 7
GENERAL CONDITIONS
7.1
Since the ENGINEER has no control over the cost of labor, materials, or equipment,
or over any construction contractor's method of determining prices, any opinions of
probable construction cost which may be provided in the services of this Amendment
are made on the basis of his experience and qualifications and represent his best
judgment as a design professional familiar with the construction industry, but the
ENGINEER cannot and does not guarantee that bids orthe construction cost will not
vary from opinions of probable cost prepared by him.
7.2
The OWNER and the ENGINEER each binds himself and his partners, successors,
executors, administrators and assigns to the other party of this Amendment and to
partners, successors, executors, administrators, and assigns of such other party in
respect to all covenants of this Amendment. Nothing herein shall be construed as
creating any personal liability on the part of any officer or agency of any public body,
which may be a party hereto, nor shall it be construed as giving any rights or benefits
hereunder to anyone other than the OWNER and the ENGINEER.
J:\Z6582\Proposals\Winter Springs\AMEND85 WTP No 2 Electrical System Improvements. doc
SECTION 8
8.1
The ENGINEER agrees to prosecute the work in a timely manner until the Project is
completed.
IN WITNESS WHEREOF, the parties hereto have made and executed this
Amendment the day and year first above written.
OWNER:
City of WinterSprin9-s, FiOrida
By:
ENGINEER:
CPH Engineers, Inc.
~dlA~
BY:~tl~
Date: 2/2-7/ tJI:.
,
J:\Z6582\Proposals\Winter Springs\AMEND85 WTP No 2 Electrical System Improvements. doc