SECTION 00500
FORM OF AGREEMENT
THIS AGREEMENT made this ~ day of (/t:1. /'k. , 2002 between the CITY OF
WINTER SPRINGS of 1126 East State Road 434, Winter Springs, Florida 32708, Seminole
County, State of Florida, herein referred to as OWNER and Florida Industrial Electric, Inc.,
State of Florida, herein referred to as CONTRACTOR, a person duly licensed as a Contractor in
the State of Florida, as follows:
1. DESCRIPTION OF WORK - CONTRACTOR shall perform the work, in accordance with the
Contract Documents for the construction of the Intersection Improvements State Road 434
and Tuskawllla Drive.
2. CONTRACT DOCUMENTS - The Contract Documents consist of this Agreement; all
Technical, General and Supplementary Conditions and Sections contained in the Project
Manual; the Drawings as listed on the Bid Form and Index to Drawings; all Addenda issued
prior to and all Change Orders issued after execution of this Agreement. These form the
Contract and are incorporated into this Contract by this reference.
3. CONTRACT TIME - The CONTRACTOR shall begin work within 10 days after the issuance
of a written Notice to Proceed and shall complete the work within 150 calendar days from the
date of the Notice to Proceed. Extensions, if any, are authorized by OWNER, and may only
be granted in writing.
4. LIQUIDATED DAMAGES - OWNER and CONTRACTOR recognize that time is of the
essence of this Agreement and that OWNER will suffer financial loss if the Work is not
substantially complete within the time specified in Paragraph 3 above, plus any extensions
thereof allowed in accordance with the General Conditions. They also recognize the delays,
expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss
suffered by OWNER if the Work is not substantially complete on time. Accordingly, instead of
requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for
delay (but not as a penalty) CONTRACTOR shall pay OWNER $200.00 for each day that
expires after the time specified in Paragraph 4 for final completion until the work is finally
complete, and that OWNER has paid to CONTRACTOR the consideration of Ten ($10.00)
Dollars as consideration for this provision.
5. CONTRACT PRICE. UNIT PRICE CONTRACT - The OWNER will pay the CONTRACTOR in
current funds for the performance of the work, subject to additions and deductions by Change
Order, the Total Contract Price of One hundred sixteen thousand six hundred twenty.
nine dollars and twenty-nine cents ($116.629.29), Payments will be made to the
CONTRACTOR for actual quantities installed on the basis of the Schedule of Unit Prices
included as a part of his Bid, which shall be as fully a part of the Contract as if attached or
repeated herein.
6. PROGRESS PAYMENTS - OWNER shall make progress payments on account of the
contract price to CONTRACTOR, on the basis of application for payments submitted to the
City or their authorized representative, by CONTRACTOR as the work progresses, and in
accordance with the Contract Documents.
Thirty (30) days after presentation of the Application for Payment to Owner the amount
recommended will (subject to the provisions of Article 14 and Article 15 of the Contract
General Conditions) become due, and when due will be paid by Owner to Contractor.
, . t
,.--~,
" j , }
Progress payments may be withheld if: ..;.
(A) Work is found defective and not remedied;
(B) Contractor does not make prompt and proper payments to subcontractors;
(C) Contractor does not make prompts and proper payments for labor, materials, or
equipment furnished him;
(D) Another Contractor is damaged by an act for which Contractor is responsible;
(E) Claims or liens are filed on the job; or
(F) In the opinion of the Cityof Winter Springs, Contractor's work is not progressing
satisfactorily.
7. FINAL PAYMENT - OWNER shall withhold up to 10% of the Contract Price throughout the
project. The Owner shall release 50% ofthe amount withheld upon issuance of the
Substantial Completion Certificate. The remaining 50% of the amount withheld shall be
. released with the Final Payment after the issuance of the Final Completion Certificate.
OWNER shall make final payment to CONTRACTOR within thirty (30) days after the work is
fully and properly completed, if the contract has been fully and timely performed, but subject
to the condition that final payment shall not be due until CONTRACTOR has delivered to
OWNER a complete release of liens arising out the contract, or receipt releases of lien fully
covering all labor, materials and equipment for which a lien could be filed, or in the alternative
a bond satisfactory to OWNER indemnifying him against such claims.
By making payments OWNER does not waive claims including but not limited to those
relating to:
(A) Faulty work appearing after substantial completion has been granted;
(B) Work that does not comply with the Contract Documents:
(C) Outstanding claims of liens; or
(D) Failure of Contractor to comply with any special guarantees required by the Contract
Documents.
CONTRACTOR,by accepting final payment, waives all claims except those, which he has
previously made in writing, and which remain unsettled at the time of acceptance of payment
pursuant to this contract.
8. DESIGNATION OF PROJECT.DIRECTOR OR ARCHITECT OR ENGINEER: DUTIES AND
AUTHORITY - The duties and authority of the City are as follows:
a. General Administration of Contract. The primary function of the City is to provide the
general administration of the contract.. In performance of these duties Kipton Lockcuff or
his authorized representative is the City's Project Director during the entire period of
construction. The OWNER (City) may change the Project Director during the term of this
contract.
b. Inspections. Opinions. and Proaress Reports. The OWNER shall be kept familiar with
the progress and quality of the work by CONTRACTOR and may make periodic visits to
the work site. The OWNER will not be responsible for the means of construction, or for
the sequences, methods, and procedures used therein, or for the CONTRACTOR's
failure to perform the work in accordance witli the Contract Documents.
c. Access to Workslte for Inspections. The OWNER shall be given free access to the
worksite at all times during work preparation and progress. The Project Director is not
obligated to make exhaustive or continuous on site inspections to perform his duties of
checking and reporting on work progress, and any such inspections shall not waive
Owner's claim regarding defective work by Contractor.
d. Interpretation of Contract Documents: Decisions on Disputes. The OWNER will be
the initial interpreter of the contract document requirements, and make decisions on
claims and disputes between Contractor and Owner.
. . l
/~
'~ J ~ }
e. Relection and StoDDaae of Work. The OWNER shall have authority to reject work
which in its opinion does not conform to the Contract Documents, and in this connection
may stop the work or a portion thereof, when necessary.
f. Payment Certificates. The OWNER will determine the amounts owing to
CONTRACTOR as the work progresses, based on CONTRACTOR's applications and
OWNER's inspections and observations, and will issue certificates for progress payments
and final payments in accordance with the terms of the Contract Documents.
9. RESPONSIBILITIES OF CONTRACTOR - CONTRACTOR's duties and rights in connection
with the project herein are as follows:
a. ResDonslbllity for SUDervision and Construction. CONTRACTOR shall be solely
responsible for all construction under this contract, including the techniques, sequences,
procedures and means, for the coordination of all work. CONTRACTOR shall supervise
and direct the work, and give it all attention necessary for such proper supervision and
direction.
b. DlsclDllne and EmDl6yment. CONTRACTOR shall maintain at all times strict discipline
among his employees, and he agrees not to employ for work on the project any person
unfit or without sufficient skill to perform the job for which he was employed.
c. Furnlshlna of Labor. Materials. etc. CONTRACTOR shall provide and pay for all labor,
materials and equipment, including tools, construction equipment and machinery, utilities,
including water, transportation, and all other facilities and services necessary for the
proper completion of work on the project in accordance with the Contract Documents.
d. Payment of Taxes: Procurement of Licenses and Permits. CONTRACTOR shall
secure all licenses and permits necessary for proper completion of the work, paying the
fees therefor. CONTRACTOR warrants that it (and subcontractors or tradesmen, if
authorized in the Contract Documents) hold or will secure all trade or professional
licenses required by law for CONTRAcTOR to undertake the contract work.
e. CONTRACfOR will provide written guarantee for work and materials for one (1) calendar year
after acceptance by OWNER.
10. BOND - CONTRACTOR shall supply a materials, performance and payment bond(s) in
accordance with Florida law and to the satisfaction of OWNER, in an amount specified in the
Contract Documents.
11. MEDIATIONNENUE - The parties agree that should any dispute arise between them
regarding the terms or performance of this Agreement, both parties will participate in
mediation. The parties agree to equally share the cost of the mediator. Should the parties
fail to resolve their differences through mediation. then any cau~e of action filed hereunder
shall be filed in the Circuit or County Court for Seminole County, Florida.
12. NOTICES - Any notice or approval under this Contract shall be sent, postage prepaid, to the
applicable party at the address shown on the first page of this Contract.
. .. 'II, ,
I
--- )
}
Signed, Sealed and Delivered CONTRACTOR:
in t
.Name 'U"
4;1,~(~s:. ~/"~ ~~~,;h-. /??~;kA;
Address and Telephone 8/t (~];(flJa~').~~'Pc... 327S0 Yo7-~/-(sS,
Date /0/34>2-
. ,
OWNER:
CITY F WINTER SPRINGS
cJ. '11 e..
By: Ronald W. McLemore
City Manager
1126 East State Road 434
Winter Springs, FL. 32708
407 -327 -1800
END OF SECTION