R1EQUEST: Public Works Department Requesting Approval to enter into a contract to construct
Landscape and Hardscape improvements for the Oak Forest Wall and Beautification
District on Winter Springs Boulevard median islands.
PURPOSE: The purpose of this Board item is to request authorization to enter into a contractual
agreement with Ken-Lin Landscaping & Maintenance Service, Inc to construct the
hardscape and landscape improvements for the Oak Forest Wall and Beautification District
on Winter Springs Boulevard median islands at a cost of $24.520.25.
CONSIDERATIONS:
This project is needed to complete landscape improvements on Winter Springs Boulevard
Medians from the end of construction and landscape improvements done as part of Tuskawilla
Road construction by Seminole County to the end of medians at Oak Forest Drive. The
improvements will include pavers, irrigation and landscaping. Sealed bids were opened on May 21,
2003 under Bid No. ITB 012-03/AH.
There were two (2) bids received. The low responsible bidder was Ken-Lin Landscaping &
Maintenance Service, Inc. of Oviedo, Florida at $24,520.25. The City Clerks summary is attached.
The scope of work includes installation of brick pavers, landscaping, and irrigation
landscape improvements on Winter Springs Boulevard medians from Tuskawilla Rd. to the end of
medians at Oak Forest Drive as approved by the Advisory Committee.
FUNDING:
The funding for this project will be from the Oak Forest Wall and Beautification District
Assessment Capital Fund line code 309-59192. The current fund balance is $72,106. Capital funds
are available from reserve and will require Commission approval
Consent Agenda Item B
June 9,2003
Page 2
within this agenda for appropriation for expenditure on this project. Funds required will be
RECOMMENDA TION:
It is recommended that authorization be given to enter into a contractual agreement
with Ken-Lin Landscaping & Maintenance Service, Inc. to construct the Oak Forest Winter
Springs Boulevard Median Landscape improvements project in the amount of $24,520.25
plus 10% contingency payable from line code 309-59192.
IMPLEMENTATION SCHEDULE:
The work will be begin within 10 days from issuance of Notice to Proceed and scope of
work will be completed within 45 days of issuance of the Notice to Proceed.
ATTACHMENTS:
1. City Clerk Summary RFP No. ITB 012-03/AH
2. Agreement Form
COMMISSION ACTION:
BID NUMBER: ITB-012-03/AH
OAK FOREST ENTRY MEDIAN LANDSCAPE AND IRRIGATION SERVICES
BID CLOSING: MAY 21, 2003
Bid Closing Was Called By:
Nancy Vobornik, Purchasing Coordinator
Bid Opened:
Bid Closed:
3:01 p.m.
3:05 p.m.
Witnesses:
Alan Hill, Superintendent, Public Works Department
Holly Pierstorff, Assistant to the City Clerk
Two (2) Bids Received:
1. KEN-UN LANDSCAPING AND MAINTENANCE SERVICE, 1Ne.
AGENT: KENNETH 1. MARTIN, PRESIDENT
ADDRESS: 290 I ALAF A Y A TRAIL, OVIEDO, FLORIDA 32765
TELEPHONE: (407) 365-6190
FACSIMILIE: (407) 366-0578
BID AMOUNT: $24,520.25
2. STERLING SILVER SCAPE & SOD, 1Ne.
AGENT: STERLING C. BLAKE, PRESIDENT
ADDRESS: 2201 PARTIN SETTLEMENT ROAD, KlSSIMMEE, FLORIDA 34744
TELEPHONE: (407) 846-3225
FACSIMILIE: (407) 846-3207
BID AMOUNT: $28, 049.85
Holly Pierstorff, Assistant to the City Clerk
City of Winter Springs
Copy: Mr. Kip Lockcuff, Director, Public Works/Utility Department
Ms. Nancy V obornik, Purchasing Department
City Clerk\Docs\Word\BIDS\RESUL TS\Fy0203\ITB-O 12-03 AH.doc
CITY OF WINTER SPRINGS, FLORIDA
1126 EAST STATE ROAD 434
WINTER SPRINGS, FLORIDA 32708.2799
Telephone (407) 327.1800
Fax (407) 327.6695
Utility' Public Works
Department
AGREEMENT FORM
THIS AGREEMENT MADE THIS JOth DAY OF May. 2003 between the CITY OF WINTER SPRINGS of
1I26 East State Road 434, Winter Springs, Florida 32708, Seminole County, State of Florida, herein referred to as
OWNER and Ken-Lin Landscaping & Maintenance Service, Inc., State of Florida, herein referred to as
CONTRACTOR, a person duly licensed as a Contractor in the State of Florida, as follows:
1. DESCRIPTION OF WORK - CONTRACTOR shall perform the work, in accordance with the Contract
Documents, at City Hall on 1126 East State Road 434, Winter Springs, FL. 32708 for Oak Forest Entry
Median.
2. CONTRACT DOCUMENTS - The Contract Documents consist of this Agreement; all Technical,
General and Supplementary Conditions and Sections contained in the Project Manual; the Drawings as
listed on the Bid Form and Index to Drawings; all Addenda issued prior to and all Change Orders issued
after execution of this Agreement. These form the Contract and are incorporated into this Contract by this
reference.
3. CONTRACT TIME - The CONTRACTOR shall begin work within 10 days after the issuance of a
written Notice to Proceed and shall complete the work within 45 calendar days from the date of the Notice
to Proceed. Extensions, if any, are authorized by OWNER, and may only be granted in writing.
4. LIQUIDATED DAMAGES - OWNER and CONTRACTOR recognize that time is ofthe essence of this
Agreement and that OWNER will suffer financial loss ifthe Work is not substantially complete within the
time specified in Paragraph 3 above, plus any extensions thereof allowed in accordance with the General
Conditions. They also recognize the delays, expense and difficulties involved in proving in a legal or
arbitration proceeding the actual loss suffered by OWNER if the Work is not substantially complete on
time. Accordingly, instead of requiring any such proof; OWNER and CONTRACTOR agree that as
liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER $500.00 for each
day that expires after the time specified in Paragraph 4 for final completion until the work is finally
complete, and that OWNER has paid to CONTRACTOR the consideration of Ten ($10.00) Dollars as
consideration for this provision.
5. CONTRACT PRICE, UNIT PRICE CONTRACT - The OWNER will pay the CONTRACTOR in
current funds for the performance of the work, subject to additions and deductions by Change Order, the
Total Contract Price of Twenty four thousand five hundred twenty and twenty five cents Dollars
($24.520.25). Payments will be made to the CONTRACTOR for actual quantities installed on the basis of
the Schedule of Unit Prices included as a part of his Bid, which shall be as fully a part of the Contract as if
attached or repeated herein.
6. PROGRESS PAYMENTS - OWNER shall make progress payments on account of the contract price to
CONTRACTOR, on the basis of application for payments submitted to the City or their authorized
representative, by CONTRACTOR as the work progresses, and in accordance with the Contract
Documents.
00520-1
Progress payments may be withheld if:
(A) Work is found defective and not remedied;
(B) Contractor does not make prompt and proper payments to subcontractors;
(C) Contractor does not make prompts and proper payments for labor, materials, or equipment
furnished him;
(0) Another Contractor is damaged by an act for which Contractor is responsible;
(E) Claims or liens are filed on the job; or
(F) In the opinion of the City of Winter Springs, Contractor's work is not progressing satisfactorily.
7. FINAL PAYMENT - OWNER shall withhold up to 10% of the Contract Price throughout the project.
The OWNER shall release 50% of the amount withheld upon issuance of the Substantial Completion
Certificate. The remaining 50% of the amount withheld shall be released with the Final Payment after the
issuance of the Final Completion Certificate. OWNER shall make final payment. to CONTRACTOR
within thirty (30) days after the work is fully and properly completed, .if the contract has been fully and
timely performed, but subject to the condition that final payment shall not be due until CONTRACTOR
has delivered to OWNER a complete release of liens arising out the contract, or receipt releases of lien
fully covering all labor, materials and equipment for which a lien could be filed, or in the alternative a
bond satisfactory to OWNER indemnifying him against such claims.
By making payments OWNER does not waive claims including but not limited to those relating to:
(A) Faulty work appearing after substantial completion has been granted;
(B) Work that does not comply with the Contract Documents:
(C) Outstanding claims of liens; or
(D) Failure of Contractor to comply with any special guarantees required by the
Contract Documents.
8. DESIGNATION OF PROJECT DIRECTOR OR ARCHITECT OR LANDSCAPE_ARCHITECT:
DUTIES AND AUTHORITY - The duties and authority of the City are as follows:
a. General Administration of Contract. The primary function of the City is to provide the
general administration of the contract. In performance of these duties Kipton Lockcuff,
P.E. or his authorized representative is the City's Project Director during the entire
period of construction. The OWNER (City) may change the Project Director during the
term of this contract.
b. Inspections. Opinions. and Progress Reports. The OWNER shall be kept familiar with
the progress and quality of the work by CONTRACTOR and may make periodic visits to
the work site. The OWNER will not be responsible for the means of construction, or for
the sequences, methods, and procedures used therein, or for the CONTRACTOR'S
failure to perform the work in accordance with the Contract Documents.
c. Access to Worksite for Inspections. The OWNER shall be given free access to the worksite
at all times during work preparation and progress. The Project Director is not obligated
00520-2
to make exhaustive or continuous on site inspections to perform his duties of checking
and reporting on work progress, and any such inspections shall not waive Owner's claim
regarding defective work by Contractor.
d. Interpretation of Contract Documents: Decisions on Disputes. The OWNER will be the
initial interpreter of the contract document requirements, and make decisions on claims
and disputes between Contractor and Owner.
9. RESPONSffiILITIES OF CONTRACTOR - CONTRACTOR'S duties and rights in connection with
the project herein are as follows:
a. Responsibility for Supervision and Construction. CONTRACTOR shall be solely
responsible for all construction under this contract, including the techniques, sequences,
procedures and means, for the coordination of all work. CONTRACTOR shall
supervise and direct the work, and give it all attention necessary for such proper
supervision and direction.
b. Discipline and Emplovment. CONTRACTOR shall maintain at all times strict discipline
among his employees, and he agrees not to employ for work on the project any person
unfit or without sufficient skill to perfonn the job for which he was employed.
c.
Furnishing of Labor. Materials. etc. CONTRACTOR shall provide and pay for all
labor, materials and equipment, including tools, construction equipment and machinery,
utilities, including water, transportation, and all other facilities and services necessary
for the proper completion of work on the project in accordance with the Contract
Documents.
d. Pavment of Taxes: Procurement of Licenses and Permits. CONTRACTOR shall secure
all licenses and permits necessary for proper completion of the work, paying the fees
thereof. CONTRACTOR warrants that it (and subcontractors or tradesmen, if
authorized in the Contract Documents) hold .or will secure all trade or professional
licenses required by law for CONTRACTOR to undertake the contract work.
e. CONTRACTOR will provide written guarantee for work and materials for one (1)
calendar year after acceptance by OWNER.
10. BOND - CONTRACTOR shall supply a materials, performance and payment bond(s) in accordance with
Florida law and to the satisfaction of OWNER, in an amount specified in the Contract Documents.
11. MEDIATIONNENUE - The parties agree that should any dispute arise between them regarding the
tenns or petfonnance of this Agreement, both parties will participate in mediation. The parties agree to
equally share the cost of the mediator. Should the parties fail to resolve their differences through
mediation, then any cause of action filed hereunder shall be filed in the Circuit or County Court for
Seminole County, Florida.
12. NOTICES - Any notice or approval under tlus Contract shall be sent, postage prepaid, to the applicable
party at the address shown on the first page of this Contract.
00520-3
Signed, Sealed and Delivered
In the presence of:
?ttII fZ wI--
~4!I/II~
r
~~ ~ Q~"CJ
00520-4
. Contractor: \
'l<E/V-~(1loI LtWosa.p"cJ'" m~l\''T.'flJl,~A1c;.,
Ilt:l-
Na e
"~/-~~-bl~c
').'0\ ~l~fAYA IAA,(I~Vlt~ tL ~~1b<
Address and Telephone
Date
OWNER: .' .
CITY OF WINTER SPRINGS
~~z::;i'-~~ .J
~./' By: Ronald W. McLeplore
City Manager
1126 East State Road 434
Winter Springs, FL 32708