PROPOSAL AND AGREEMENT
It is intended that payment for all work done under the Contract Documents, including the
furnishing of all labor, equipment and materials and the performing of all operations in
connection with the construction of NEW WEARING COURSE OF NO LESS THAN ONE (1)
INCH OF COMPACTED TYPE I or S-3 ASPHALTIC CONCRETE ON CERTAIN DESIGNATED
CITY STREETS will be made under the following pay items. Other work for which there is
not a pay item will be considered included in the contract Unit Price for the various pay items
and no additional compensation will be allowed.
A mix design will be required to be submitted to the City Engineer for approval. If recycled
asphalt-concrete is used, it must be less than 30 percent and must be shown on the mix
design.
The Owner reserves the right to alter the Plans, extend or shorten the improvement, add
such incidental work as may be necessary, and increase or decrease the quantities of work
to be performed to accord with such changes, including the deduction or cancellation of any
one or more of the Pay Items. Such changes shall not be considered as a waiver of any
conditions of the Contract nor to invalidate any of the provisions thereof. A supplemental
agreement between the contractor and the Owner will be required when such changes
involve a net increase or decrease in the total amount of the original contract of more than
twenty-five percent (25 %). Should such changes result in changes in the quantities of the
work to be performed, the Contractor will accept payment according to Contract Unit Prices
for such items of work as appear in the original contract.
The work will be done in compliance with the contract Documents and paid for under the
Pay Items herein listed. Quantities shown on the Plans shall govern over those shown
herein. The contractor shall take no advantage of any apparent error or omission in the
Plans or Specifications, and the Engineer shall be permitted to make such corrections and
interpretations as may be deemed necessary for the fulfillment of the intent of the contract
Documents.
The undersigned agrees that his Bid as stipulated herein shall be valid for a period of thirty
(30) days from that date of this Bid opening. The proposal guaranty of the three lowest
bidders shall be held for that period or until an award of the contract is made.
The undersigned agrees to start construction of this project within 30 calendar days after
notice of award of contract and notice to proceed, and to guarantee completion of the work
within 45 calendar days thereafter.
'""""",""
.
. ,
.. .
SIGNATURE PAGE
FOR THE CONTRACTOR
NAME
s III
Vice President
TITLE
ORLANDO PAVING CO., A D1V. OF
HUBBARD CONSTRUCTION CO.
NAME OF CONTRACTOR
f O. I];ox 6Jf?J'6f,
O/<L/);JJ)O P? 3z~5Jf~7)Zb
ADDRESS )
Otv 1--
,..- ~."'f 'tit...:"
~ii'" REGlNAA8ROVVN :,
* * MyCo/Yl'YllnlOnOCilll1P ,
~ ~., ExpirM JUU3.1_~. "
~ ~ '
-~ ., ."u , '
FOR THE CITY OF WINTER SPRINGS
_~ IJ '1ft/J-- --'
SIGNA TURE
Ronald W. McLemore
NAME
City Manager
TITLE
~/Z,. /&1.19
DATE '
~5(.