ORLANDO BUSINESS TELEPHONE SYSTEMS INC.
SOUTII WEST 35TH STREET
ORLANDO, FLORIDA 32811
City of Winter Springs
112 East S.R. 43
Winter Springs, Florida 32708
Attention: David Day
This Quote is submitted to City of Winter Springs to extend the fiber optic cable
into the new facilities for Public Works. Orlando Business Telephone Systems Inc.
would like to quote charges to install MM fiber in new buildings 3, 2, 1, and
temporary trailer.
Buildings 2 & 3, will be connected by a 12 strand MM fiber optic and a 6 stand into
1 and trailer. A 12 strand 8M fiber will extend the network from the Moss Road and
State Road 419 to building # 3 for Public Works.
The 12 strand SM will be spliced in to the existing fiber at State Road 419 and
Moss Road - which feeds from the Winter Springs Police Department.
MATERIALS; To extend fiber cable and connect building #3 to existing network
at State Road 419 and Moss Rd.
12 strand SM fiber
8M connectors install in ST bulkheads in fiber LIU
3M Fiber lock splice tray, break out kits for loose tube fiber
MATERIAL COST
LABOR COST
TOTAL
$1.595.91
$3,775.00
$5,370.91
MATERIALS: BUILDING # 3
19"X 84"X 3" floor rack with shelves
48 port fiber box, rack mount with ST & MM bulks heads
MM ST connectors and SM connectors.
MATERIAL COAST
LABOR COST
TOTAL
$ 799.30
$ 875.00
$1.674.30
MATERIALS: BUILDING # 2 to extend 12 strand MM fiber from building # 3
12 strand MM fiber optic cable.
24 port fiber LIU wall box with MM ST bulks heads
ST MM connectors
19 X 21 X 18 inch wall mount swing rack
MATERIAL COST
LABOR COST
TOTAL
$1,455.72
$2,450.00
$3,905.72
2"d
0L99L~L0t>6:Dl
2929966l.0t>I
l3~ ssns l~O:WO~~ 9~:60 9002-81-~JO
".
PAGE #2 QUOTE FOR CITY OF WINTER SPRINGS PUBLIC WORKS
BUILDING. FIBER OPTIC CABLE PLACEMENT.
MATERIALS: TEMPORARY tRAILER;
6 strand MM fiber optic cable from building #2.
MATERIALS: BUILDING #ITo pull 6 strand fiber optic cable from building #3 to
hand hole for future building # 1.
MATERIAL COST:
LABOR if pulled at same time as building #2 in interdict
TOTAL
$ 967.00
$ 350.00
$1,317.00
oaTS would like to reconunend installing 11/4 inner duct from hand hole at building #1
to hand hole at building #2 and to band hole at building #3 and into building #3. This
inner duct can be pulled at the same time as the 12-strand 8M fiber to building #3. This
will facilitate pulling the 12 and 6 strands for building #2, #1 and temporary trailer.
MATERIALS: $ 356.75
LABOR no charge if pulled with 12-strand SM fiber.
OBTS will extend 3, 4 inch pipes from fence to existing pull box at edge of road.
MA TERlALS $ 236.65
LABOR $ 1,200.00
TOTAL $ 1,436.65
TOTAL WITH INTERDUCT . $14,061.33
~ ~~~~
GRAND TOTAL ~14,06l~
This quote is based on information available from the City of Winter Springs. Any
additional materials or labor will be billed at our normal rate. OaTS is not responsible
for ground bars in any of the phone rooms or pipes between buildings. All pipes will
need to have pull strings prior to start of project All work is warranted for one year
from date of turn over.
If you have any questions fell free to call me at 407-996-1132. Up on review of this
quote and your acceptance of the total amount, please sign and fax a copy to 407.996-
6262.
nlnnl..,,.....lnLi:'.nl
:JO:JaacCIGll-.T
,~I c::c::nQ ,).In: 1.1n).l..j ) (' : I=.Cl qV!(;l;J-,:::n - I,n
,1
PAGE #3 QUOTE FOR CITY OF WINTER SPRINGS PUBLIC WORKS
Project Manager
City of Winter SprinBi: .
By~"ll:"-'; 1-t/ ~
Date /J . "'I. '- ii i
Orlando Business Telephone Systems Inc
October 18, 2006