HomeMy WebLinkAboutPrime Construction Group Agreement Utility Compund Sanitary Force Main -2000 01 01~-
AGREEMENT FORM
THIS AGREEMENT MADE THIS DAY OF 200_ between the
CITY OF WINTER SPRINGS of 1126 East State Road 434, Winter Springs, Florida 32708,
Seminole County, State of Florida, herein referred to as OWNER and Prime Construction
Group, Inc State of Florida, herein referred to as CONTRACTOR, a person duly licensed as a
Contractor in the State of Florida, as follows:
1. DESCRIPTION OF WORK -CONTRACTOR shall perform the work, in accordance with
the Contract Documents, for the construction of the Utility Compound Sanitary Force Main.
2. CONTRACT DOCUMENTS -
The Contract Documents consist of this Agreement; all Technical, General and Supplementary
Conditions and Sections contained in the Project Manual; the Drawings as listed on the Bid
Form and Index to Drawings; all Addenda issued prior to and all Change Orders issued after
execution of this Agreement. These form the Contract and are incorporated into this Contract
by this reference.
3. CONTRACT TIME -The CONTRACTOR shall begin work within 10 days after the
issuance of a written Notice to Proceed and shall complete the work within 90 calendar days
from the date of the Notice to Proceed. Extensions, if any, are authorized by OWNER, and may
only be granted in writing.
4. LIQUIDATED DAMAGES -OWNER and CONTRACTOR recognize that time is of the
essence of this Agreement and that OWNER will suffer financial loss if the Work is not
substantially complete within the time specified in Paragraph 3 above, plus any extensions
thereof allowed in accordance with the General Conditions. They also recognize the delays,
expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss
suffered by OWNER if the Work is not substantially complete on time. Accordingly, instead of
requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for
delay (but not as a penalty) CONTRACTOR shall pay OWNER $500.00 for each day that
expires after the time specified in Paragraph 4 for final completion until the work is finally
complete, and that OWNER has paid to CONTRACTOR the consideration of Ten ($10.00)
Dollars as consideration for this provision.
5. CONTRACT PRICE. UNIT PRICE CONTRACT - The OWNER will pay the
CONTRACTOR in current funds for the performance of the work, subject to additions and
deductions by Change Order, the Total Contract Price of One Hundred Thirty Eight Thousand
Seven Hundred Thirty Two Dollars ($ 138.732.00). Payments will be made to the
CONTRACTOR for actual quantities installed on the basis of the Schedule of Unit Prices
included as a part of his Bid, which shall be as fully a part of the Contract as if attached or
repeated herein.
6. PROGRESS PAYMENTS -OWNER shall make progress payments on account of the
contract price to CONTRACTOR, on the basis of application for payments submitted to the City
or their authorized representative, by CONTRACTOR as the work progresses, and in
accordance with the Contract Documents.
Progress payments may be withheld if:
00520-1
(A) Work is found defective and not remedied;
(B) Contractor does not make prompt and proper payments to subcontractors;
(C) Contractor does not make prompts and proper payments for labor, materials, or
equipment furnished him;
(D) Another Contractor is damaged by an act for which Contractor is responsible;
(E) Claims or liens are filed on the job; or
(F) In the opinion of the City of Winter Springs, Contractor's work is not progressing
satisfactorily.
7. FINAL PAYMENT -OWNER shall withhold up to 10% of the Contract Price throughout
the project. The OWNER shall release 50% of the amount withheld upon issuance of the
Substantial Completion Certificate. The remaining 50% of the amount withheld shall be
released with the Final Payment after the issuance of the Final Completion Certificate. OWNER
shall make final payment to CONTRACTOR within thirty (30) days after the work is fully and
properly completed, if the contract has been fully and timely performed, but subject to the
condition that final payment shall not be due until CONTRACTOR has delivered to OWNER a
complete release of liens arising out the contract, or receipt releases of lien fully covering all
labor, materials and equipment for which a lien could be filed, or in the alternative a bond
satisfactory to OWNER indemnifying him against such claims.
By making payments OWNER does not waive claims including but not
limited to those relating to:
(A) Faulty work appearing after substantial completion has been
granted;
(B) Work that does not comply with the Contract Documents:
(C) Outstanding claims of liens; or
(D) Failure of Contractor to comply with any special guarantees required by the
Contract Documents.
8. DESIGNATION OF PROJECT DIRECTOR OR ARCHITECT OR ENGINEER: DUTIES
AND AUTHORITY -The duties and authority of the City are as follows:
a. General Administration of Contract. The primary function of the City is to provide the
general administration of the contract. In performance of these duties George F.
Edwards, P.E. or his authorized representative is the City's Project Director during the
entire period of construction. The OWNER (City) may change the Project Director
during the term of this contract.
b. Inspections. Opinions. and Progress Reports. The OWNER shall be kept familiar
with the progress and quality of the work by CONTRACTOR and may make periodic
visits to the work site. The OWNER will not be responsible for the means of
00520-2
construction, or for the sequences, methods, and procedures used therein, or for the
CONTRACTORSs failure to perform the work in accordance with the Contract
Documents.
c. Access to Worksite for Inspections. The OWNER shall be given free access to the
worksite at all times during work preparation and progress. The Project Director is not
obligated to make exhaustive or continuous on site inspections to perform his duties of
checking and reporting on work progress, and any such inspections shall not waive
Owner's claim regarding defective work by Contractor.
d. Interpretation of Contract Documents: Decisions on Disputes. The OWNER will be
the initial interpreter of the contract document requirements, and make decisions on
claims and disputes between Contractor and Owner.
e. Refection and Stoppage of Work. The OWNER shall have authority to reject work
which in its opinion does not conform to the Contract Documents, and in this connection
may stop the work or a portion thereof, when necessary.
Pavment Certificates. The OWNER will determine the amounts owing to
CONTRACTOR as the work progresses, based on CONTRACTORS applications and
OWNERS inspections and observations, and will issue certificates for progress
payments and final payments in accordance with the terms of the Contract Documents.
9. RESPONSIBILITIES OF CONTRACTOR - CONTRACTORS duties and rights in
connection with the project herein are as follows:
a. Responsibility for Supervision and Construction. CONTRACTOR shall be solely
responsible for all construction under this contract, including the techniques, sequences,
procedures and means, for the coordination of all work. CONTRACTOR shall supervise
and direct the work, and give it all attention necessary for such proper supervision and
direction.
b. Discipline and Employment. CONTRACTOR shall maintain at all times strict discipline
among his employees, and he agrees not to employ for work on the project any person
unfit or without sufficient skill to perform the job for which he was employed.
c. Furnishing of Labor. Materials, etc. CONTRACTOR shall provide and pay for all
labor, materials and equipment, including tools, construction equipment and machinery,
utilities, including water, transportation, and all other facilities and services necessary for
the proper completion of work on the project in accordance with the Contract
Documents.
d. Pavment of Taxes: Procurement of Licenses and Permits. CONTRACTOR shall
secure all licenses and permits necessary for proper completion of the work, paying the
fees therefor. CONTRACTOR warrants that it (and subcontractors or tradesmen, if
authorized in the Contract Documents) hold or will secure all trade or professional
licenses required by law for CONTRACTOR to undertake the contract work.
e. CONTRACTOR will provide written guarantee for work and materials for one (1)
calendar year after acceptance by OWNER.
00520-3
. ,
10. BOND -CONTRACTOR shall supply a materials, performance and payment bond(s) in
accordance with Florida law and to the satisfaction of OWNER, in an amount specified in
the Contract Documents.
11. MEDIATIONNENUE -The parties agree that should any dispute arise between them
regarding the terms or performance of this Agreement, both parties will participate in a
mediation. The parties agree to equally share the cost of the mediator. Should the
parties fail to resolve their differences through mediation, then any cause of action filed
hereunder shall be filed in the Circuit or County Court for Seminole County, Florida.
12. NOTICES -Any notice or approval under this Contract shall be se t, postage prepaid, to
the applicable party at the address shown on the first page of thi~ontract.
Name Ro]~ ~! Smith, Jr. , President
1000 Jet eam Drive
Address an Telephone
Orlando, lorida 32824
OWNER:
CITY OF WINTEF~ SPRINGS
~,,w~ "'~ , ~ ~
By: Rcznatd W, ~lcLemore
City ~.1ana~er
1126 Eas? Stag-Road 434
Winter Springs, FL. 32708
407-327-1800)
00520-4
Signed, Sealed and Delivered
in the presence of: