BINDING DEVELOPMENT AGREEMENT, '
THIS BINDING DEVELOPMENT AGREEMENT ("Agreement"), made and
executed this 14th day of April, 2003 by and between the CITY OF WINTER
SPRINGS, a Florida municipal corporation ("City") whose address is 1126 East State
Road 434, Winter Springs, Florida 32708, and SEMINOLE PINES ASSOCIATES,
LTD" a Florida limited partnership ("Owner"), whose address is 3801 Bee Ridge Road,
Suite 12, Sarasota, Florida 34233:
WITNESSETH:
WHEREAS, Owner is constructing a second phase to an existing Manufactured
Housing Community denoted Tuskawilla Trails, Phase II, on real property located within
the City of Winter Springs Town Center; and
WHEREAS, the parties desire fo memorialize their mutual understanding that the
real propertY,will be developed as the -Tuskawilla Trails, Phase II, project in accordance
with the Town Center Zoning District .requirements adopted by the City, Jthe "Project");
and '
WHEREAS, this Agreement was entered into, in conjunction with the City
Commission of Winter Springs' approval of the Final Development Plan for Tuskawilla
Trails, Phase II, on April 14, 2003 ("Final Development Plan").
NOW THEREFORE, in consideration of the mutual.promises and covenants
contained herein, the parties mutually agre~ as follows:
- .. -
Section 1.
this reference,
Recitals, .The for~going recitals are hereby incorporated herein by
Section 2, Authoritv, This Agreement is entered into pursuant to the Florida
Municipal Home Rule Powers Act.
Page 10f7
FILE NUM 2003096856
OR BOOK 04855 PAGE 1213
Section 3. SubiectProDertv, The real property subject to, and bound by the
terms and conditions of this Agreement, is legally described on Exhibit "A"
("Property"), which is attached hereto and fully incorporated herein by this reference.
Section 4, ReDresentations of Owner, Owner hereby represents and
warrants to City that Owner has the power and authority to execute, deliver and perform
the terms and provisions of this, Agreement and has taken all necessary action to
authorize the execution, delivery and performance of this Agreement. This Agreement
will, when duly executed and delivered by Owner and recorded in the public records of
Seminole County, Florida, constitute a legal, valid and binding obligation enforceable
against Owner and the Property in accordance with the tenns and conditions of this
Agreement. Owner represents it has voluntarily and willfully executed this Agreement
for purposes of binding the Property to the terms and conditions set forth in this
Agreement.
Section 5, Owner's Oblieations and Commitments, In consideration of the
City entering into this Agreement with Owner, Owner voluntarily agrees as follows:
5.1 Parks and Recreation Concurrency: Owner acknowledges that 'the City
currently has on-site parks and recreation concurrency requirements
pursuant to City Code. For purposes of satisfying the concurrency
requirement, the City agrees to calculate said requirement by combining
Phase I and Phase II of the Tuskawilla Trails development. Based on said
calculation, Owner shall be required to construct and maintain in
perpetuity a nature trail around the entire perimeter of the Wet Detention
Pond and an open playground area, as depicted and specified on the Final
Development Plan. The nature trail and playground area shall be
constructed and maintained in good condition in accordance with the Final
Development Plan: Said trail shall consist of a six (6') foot wide,
compacted subgrade, mulch surface deemed suitable for walking by the
City. In addition, Owner shall install and maintain in good condition a
nature trail, playground jdentification sign and a park bench as depicted
and specified in the Pinal Development Plan,
5.2 Landscape Buffer: Owner shall maintain ina uniform and good condition
a twenty-five foot (25') minimum landscape buffer-:-yard along the right-
of-way called Nature's Way. There shall be no tree removal or grubbing
with mechanical equipment in this buffer area with the exception of two
(2) 15-foot wide utility easements shown on the Final Development Plan.
5.3 Potable Water: Potable water service shall be provided by the City water
system by way of connection to the existing 12" water main on Tuskawilla
Road and extension of an 8" water main to the Property, Design and
construction of all lines, fire hydrants, and appurtenances shall conform to
City and Florida Department of Environmental Protection standards. Upon
certification of construction completion, the City will take over ownership
Page 2 of7
FILE NUM 2003096856
OR BOOK 04855 PAGE 1214
and operate the lines, stations and appurtenances up to the boundaries of
each individual lot line.
5.4 Sanitary Sewer: Sanitary sewer service shall be provided by the City
sanitary sewer system by way of connection to the existing wastewater
system serving the adjacent subdivision called Avery Park via
construction of a City-owned lift station and 4" sewer force main. Design
and construction of all lines, lift stations, and appurtenances shall conform
to City and Florida Department of Environmental Protection standards.
Upon certification of construction completion, the City will take over
ownership and operate the lines, lift stations, and appurtenances up to the
boundaries of each individual lot line,
5.5 Additional Construction Reimbursement: Construction of Tuskawilla
Trails, Phase II, includes water and sewer amenities that have been
oversized to accommodate areas in addition to !he Property. The City has
agreed to share, in part, the actual cost of the surveying, design, permitting
and construction activities over and above that needed for the Property.
The City's share of the actual costs is generally set forth in the
memorandum to Kip Lockcuff, City Utility Director, from John Webb,
originally dated February 12, 2003, and revised March 11, 2003. A copy
of the memorandum is attached as Exhibit "B" and fully incorporated
herein by this reference. The City, shall pay its share of the costs within
fourteen (14) days of the City accepting ownership of the water and sewer
utilities required under Paragraphs 5.3 and 5.4 of this Agreement.
5.6 Seminole County Right-of-way Utilization: Owner shall be required to
obtain all Seminole County right-of-way utilization permits deemed
necessary to extend water and sewer to the Property. Copies of the
permits shall be provided to the City promptly upon Owner's receipt.
5.7 Sidewalks and Roadways: It is the intent and purpose of this Paragraph to
develop Tuskawilla Trails, Phase II, consistent with Phase I with respect
to sidewalks and roadways, Therefore, sidewalks shall not be required for
Phase II. In addition, the road right-of-way for Phase II shall be thirty (30)
feet in width, including ribbon curbs, as depicted in the Final
Development Plan.
5.8 Mohawk Trail Fence: The existing fence on the south end of Mohawk
Trail will be removed and replaced with a "knock-down" fence in
accordance with the standards established by the City's Fire Department.
5.9 Tree Ordinance:
(a) Tree Replacement Assessment. Since Owner originally filed its
Application for Preliminary and Final Development Plan Approval prior
Page 3 of7
-...,
FILE NUM 2003096856
OR BOOK 04855 PAGE 1215
to the adoption of Ordinance No. 2002-08 repealing Chapter 5, Winter
Springs Land Development Code, regarding tree protection and
preservation, Owner is vested to a limited extent to be regulated under
Chapter 5 of the Winter Springs Land Development Code as it existed
prior to the adoption of Ordinance 2002-08 (Chapter 5 prior to its repeal
shall be referred to as the "Tree Ordinance"). Particularly, Owner is only
vested with respect to tree removal and replacement rights and tree
replacement assessments and credits as more specifically granted and set
forth in the Final Development Plan and the Landscape Site Plan approved
by the City Commission on April 14, 2003, and this Agreement. Owner
acknowledges and agrees that no other vesting from Ordinance 2002-08
has been granted by the City, In the event that the approved Final
Development Plan should ever be deemed by the City to be abandoned
pursuant to the City of Winter Springs Land Development Code, the
limited vested right involving the Tree Ordinance granted hereunder shall
no longer be applicable and any development on the Property subsequent
to such abandonment of the Final Development Plan shall comply with
Ordinance 2002-08 as amended from time to time.
(b) Tree Protection Guidelines. Owner and its construction
contractors shall fully comply at all times with the Tree Protection
Guidelines set forth in Exhibit "e" attached hereto and made part hereof
by reference.
(c) Arbor Permit Fees. Based on 899 trees being removed from the
Property, Owner shall pay the City Nine Thousand One Hundred Eighty
and No/I00 ($9,180.00) Dollars in arbor permit fees. Said fees shall be
fully paid at such time required by City policy.
(d) Tree Credits, Based on the tree credits earned by Owner for the
enhanced landscaping being provided pursuant to the Landscape Plan,
Owner is not required to pay any money to the City's tree bank.
5.10 Utility Easements: Within thirty (30) days of the effective date of this
Agreement, Owner shall grant to the City, in a form acceptable to the City
Attorney, the following utility easements:
(a) A blanket utility easement over, on and under all roadways
constructed and depicted on the Final Development Plan,
(b) Three (3) fifteen (15) footutility easements over, on, and under the
areas depicted on the Final Development Plan,
(c) A lift station utility easement over, on, and under the are!i depicted
on the Final Development Plan,
Page 4 of7
FILE NUM 2003096856
OR BOOK 04855 PAGE 1216
Owner shall be responsible for providing legal descriptions acceptable to
the City for all easements required by this Agreement.
5.11 Final Development and Landscape Plan: Owner shall construct the
Project in accordance with the requirements of the Final Development
Plan and Landscape Plan approved by the City Commission' on April 14,
2003, as may be amended upon Owner's request from time to time by the
City Commission. The requirements of the Final Development Plan and
Landscape Plan are fully incorporated herein, and deemed a material part
of this Agreement, by this reference.
Section 6, Successors and Assie:ns, This Agreement shall automatically be
binding upon and shall inure to the benefit of the successors and assigns of each of the
parties.
Section 7. Annlicable Law, This Agreement shall, be governed by and
constructed in accordance with the laws of the State of Florida.
Section 8, Amendments, This Agreem~nt shall not be modified or amended
except by written agreement duly executed by both parties hereto and approved by the
City Commission.
Section 9, Entire Ae:reement. This Agreement supersedes any other
agreement, oral or written, and contains the entire agreement between the City and
Owner as to the subject matter thereof
Section 10. Severability, If any provision of the Agreement shall be held to
be invalid or unenforceable to any extent by a court of competent jurisdiction, the same
shall not affect in any respect the validity or enforceability of the remainder of this
Agreement.
Section 11, Effective Date, This Agreement shall become effective upon
approval by the City of Winter Springs City Commission and execution of the Agreement
by both parties.
Section 12, Recordation, This Agreement shall be recorded in the public
records of Seminole County, Florida, and shall run with the land.
Section 13. Relationshin of the Parties, The relationship of the parties to this
Agreement is contractual and Owner is an independent contractor and not an agent of the
City. Nothing herein shall be deemed to create a joint venture or principal-agent
relationship between the parties, and neither party is authorized to, nor shall either party
act toward third persons or the public in any manner which would indicate any such
relationship with the other.
Page 5 of7
FILE NUM 2003096856
OR BOOK 04855 PAGE 1217
Section 14. Sovereien Immunity. Nothing contained in this Agreement shall
be construed as a waiver of the City's right to sovereign immunity under Section 768.28,
Florida Statutes, or any other limitation on the City's potential liability under state and
federal law.
Section 15, City's Police Power, Owner agrees and acknowledges that the
City hereby reserves all police powers granted to the City by law. In no way shall this
Agreement be construed as the City bargaining away or surrendering its police powers.
Section 16. Interpretation, The parties hereby agree and acknowledge that
they have both participated equaJly in the drafting of this Agreement and no party shall
be favored or disfavored regarding the interpretation to this Agreement in the event of a
dispute between the parties.
Section 17, Permits, The failure of this Agreement to address any particular
City, county, state, and federal permit, condition, term, or restriction shall not relieve
Owner or the City of the necessity of complying with the law governing said permitting
requirements, conditions, terms, or restriction.
Section 18, Third Party Riehts, This Agreement is not a third party
beneficiary contract and shall not in any way whatsoever create any rights on behalf of
any third party.
Section 19. Specific Performance. Strict compliance shall be required with
each and every provision of the Agreement. The parties agree that failure to perform the
obligations provided by this Agreement shall result in irreparable damage and that
specific performance of these obligations may by obtained by suit in equity.
Section 20, Attornev's Fees, In connection with any arbitration or litigation
arising out of this Agreement, the prevailing party shall be entitled to recover reasonable
attorney's fees and costs though all appeals to the extent permitted by law.
Section 21. Future Rezonine/Development Permits. Nothing herein shall
limit the City's authority to grant or deny any future rezoning or development permit
applications or requests subsequent to the effective date of this Agreement. In addition,
nothing herein shall be construed as granting or creating a vested property right or
interest in Owner or on the Property. '
[Signature Page Follows]
Page 6 of7
FILE NUM 2003096856 .
OR BOOK 04855 PAGE 1218
IN WITNESS WHEREOF the parties have hereunto set their hands and seal on
the date first above written.
,SEMINOLE PINES ASSOCIATES, LTD.
a Florida limited partnership
( rJ~'
b.
CITY OF WINTER SPRINGS,
a Florida municipal corporation,
BY~~~
J F. BUSH, Mayor
STATE OF FLORIDA)
COUNTY OF SEMINOLE)
, & The foregoing' instrument w~s acknowledged before me this' ~ day of
rrc-'j,2003, by 1<.'c.ha.'f"d kJ.clker- , an individual, who .iu~rson.alIy-=:>
, Onown' 0 me who produced as IdentIficatIon.
~S~V-
Si nature of Notary Public' ' " "
AFFIX NOTARY STAMP
J:!A-i!:€JJ S ~J4B{OcK-
(Print Notary Name) ,
, My Commission Expires qq~ ;l.OOS:-
. 'Commission No.: bD 0'3/ '-179
Page 7 of7
FILE NUM 2003096856
BINDING DEVELOPMENT AGRE~MOK 04855 PAGE 121 9
EXHmIT LIST
1.
Exhibit "A"
Legal Description
2.
Exhibit "B"
Memorandum of Cost Sharing
3.
Exhibit "C"
Tree Protection Guidelines
FILE NUM 2003096856
OR BOOK 04855 PAGE 1220
. EXHIBIT "A"
BOUNDARY DESCRIPTION (TUSKA WILLA TRAILS - PHASE II):
A portion of Lot 59, Block "D", D. R. MITCHELL'S SURVEY OF THE LEVY
GRANT ON LAKE JESSUP recorded in Plat Book 1, Page 5 Public Records of
Seminole County, Florida being more particularly described as follows:
Commence at the .Northwest corner of Lot 38 Block "D" of said D. R.
MITCHELL'S SURVEY OF THE LEVY GRANT ON LAKE JESSUP, thence
N83050'35"E a distance of 1929.61 feet along the Northerly line of Lots 38, 37,
and 36 of said "BLOCK D" to.the Northeast Corner of said Lot 36 of BLOCK
"D"; thence S22002'47"E a distance of2140.93 feet along the Easterly line of said
Lots 36 and 59 of BLOCK "D" to the Northerly line of TUSKA WILLA recorded
in Plat Book 1, Page 5 of the Public Records of Seminole County, Florida; thence
N87004'22"W a distance of 148.66 feet to the POINT OF BEGINNING of the
herein described parcel; thence continue N87004'22"W a distance of 821.65 feet;
thence S03034'58"W a distance of25.00 feet; thence N87027'51"W a distance of
488.66 feet; thence N02055'20"E a distance of358.41 feet; thence S87004'40"E a
distance of 116.63 feet; thence S06033'10"E a distance of 25.35 feet; thence
S87004'40"E a distance of 37.94 feet; thence N67057'06"E a distance of 185.57
feet; thence S22002'54"E a distance of 30.29 feet; thence N67057'13"E a distance
of 122.16 feet; thence S22002'58"E a distance of 74.12 feet; thence S87004'40"E
a distance of 498.88 feet; thence S21043'08"E a distance of 247.77 feet to the
point of curvature of a noritangent circular curve, concave to the Northwest,
whose radius is 150.66 feet and chord bearing is N73011'25"E and chord distance
is 27.51 feet; thence along the arc of said curve through a central angle of
10028'24" for a distance of 27.54 feet; thence N67057'13"E a distance of 104.59
feet to the point of curvature of a circular curve, concave to the Northwest, whose
radius is 25.00 feet and chord bearing is N22057'13"E and chord distance is 35.36
feet; thence along the arc of said curve through a central angle of 90000'00" for a
distance of39.27 feet; thence S22002'47''E a distance of222.26 feet to the POINT
OF BEGINNING. Containing 9.25 acres of land, more or less.
... '.
EXHIBIT "B"
FILE NUM 200309685&
OR ,BOOK 04855 PAGE 1221
'Yohn, 13." Webb ~ ASSbcil1tes, inc.'Consulting engineers
925 s. DENNING DRIVE, WINTER PARK, FLORIDA 32789
F'ebruary 12,2003 (revised March 11,2003)
City of Winter Springs, Florida ,
1126 East State Road 434 '
Winter Springs, Florida 32708-2799
Telephone:
Facsimile:
407-327-1800
407-327-6695
Attention:
Mr.. Kip Lockcuff, P.E.lUtility Director
City of Winter Springs
Re:
_ Calculation of Cost Sharing (revised per our discussion) ,
Tuskawilla Trails Phase II Construction
Project No,: 521-01.1
Dear Mr. Lockuff:
.,
<
, John B. Webb & Associates, !rico (JBW&A) on behalf of Sunshine Communities/Seminole Pines
Associates has developed the following evaluation of Cost Sharing for tile surveying, engineering,
,and construction of the above referenced project. This comes as a result of our previous discussions
involving modifications to the Gonstruction plans to ,provide amenities to the benefit of the City
which would normally not have been included in the design.
The items gerierally fail in these categories:
':;
ITEM
CITY COST SHARE
i:
~j
"
'"
!l
:1
'"
TOTAL
$51,372.-17
$ 3,684.83
$55,057.00
. Additional Construction Items
Additional Engineering
.j
:. ~
The ensuing describes the process used in the establishment of these costs:
ITEM I:
Additional Construction Items'
This item eilcompasses those intended improvements which are to the benefit of the
City which would normal!y not have been included in the design. These items were
included in construction at the request of the City of Winter Springs.
E-MAIL: WEBBENGR@AOL.COM - PHONE (407) 622-9322 -FAX: (407) 322-9325
FILE NUM 2003096856
OR BOOK 04855 PAGE 1222
Mr. Kip Lockcuff, P.E.fUtility Director
February 12,2003 (revised March 11,2003)
Page 2
ITEM II:
Attached Please find the following:
· Table 1 - Cost Sharing Evaluation for Construction ofTuskawilla Trails _
Phase II (revised March 11, 2003)
· Bid Estimate
. Attachment A - Determination of Cost Sharing of Lift Station Construction
Based on Wastewater Flow.
· Attachment B - Comparison of Sanitary Sewer Change Without Commercial.
Bid Estimate and Schedule of Cost Sharing
The "Bid Estimate" details the lowest responsible bidders estimated line item cost
for construction. The "Bid Estimate and Schedule of Cost Sharing" documents the
difference between the estimated cost for construction of the proj ect in accordance
with the current plans compared to the estimated cost for construction without the
additions requested by the City. Enclosed is "Table 1" which further describes item
by item the quantity and cost differences documented in the "Bid Estimate and
Schedule of Cost Sharing".
Additional Engineering
JBW&A in accordance with owner's instruction modified the construction plans to
provide amenities to the benefit of the City which would normally not have been
included in the design. These generally included the design, - calculations,
engineering and plan preparation/modification for the following:
A. JBW&A prepared an "Evaluation of Wastewater Transmission System
Alignment" report dated March 7, 2002, which included estimated flows
from Tuskawilla Trails Phase II, the Commercial Property lying immediately
east ofTuskawilla Trails and Residential Property lying between Tuskawilla
Trails and A very Park. The evaluation included sizing of pump station and
pumps to manage this flow, and three (3) alternate force main routes for City
evaluation. City staff reviewed the evaluation and made recommendation on
the preferred route. This route and pipe sizing was configured to
accommodate future connections for the areas noted above.
John B. Webb & Associates, Inc.
Cost Sharing 3-11-03
FILENUM 2003096856
OR BOOK 04855 PAGE 1223
Mr. Kip Lockcuff, P.E.fUtility Director
. February 12; 2003 (revised March 11, 2003)
Page 2
B. Evaluation and setting of manholes and inverts in the Commercial Property
immediately east of Tuskawilla Trails in order to set the proper depth of the
connection manhole (#9) in Phase II.
C. Evaluation and sizing of Lift Station and pumps in order to manage the flows
from not only Phase II but also the total build-out of Commercial Property
east of Phase II and Residential Property south of Tuskawilla Trails.
Please note Sunshine Communities, lnc./Tuskawilla Tails would expect to receive to their (future)
credit a pro-rated share of the cost for the lift station construction when the Phase I sanitary sewer
is constructed (i.e. they are prepaying $31,545.00 or 43.14% of the total lift station cost for the
anticipated Phase I sanitary sewer flow, see Attachment "A").
Your prompt review and approval of the cost sharing estimate would be appreciated as the
Tuskawilla Trails Phase II Final Development Plans and Developer's Agreement will be finalized
in the near future.
If you should have any question or require additional information, do not hesitate to contact our
office.
Sincerely,
JOHN B. WEBB & ASSOCIATES, INC.
Jo~0;e:?II~~
Senior Project Manager
enclosures
cc: Todd Newby, Property ManageriTuskawilla Trails/Sunshine Communities, Inc.
John B. Webb & Associates, Inc. .
Cost Sharing 3-11-03
FILE NUM 2003096856
OR BOOK 04855 PAGE 1224
TABLE 1
Cost Sharing Evaluation for the Construction of
Tuskawilla Trails - Phase II (revised March 11,2003)
Project No.: 821-01.1
The following list provides further commentary to describe the modifications to the "Bid Estimate"
that is presented on the "Bid Estimate and Scheduling of Cost Sharing". The line item noted below
references the specific line item on the "Bid Estimate and Scheduling of Cost Sharing":
ITEM NO.
4.01 through 4.04
4.07 and 4.10
5.01 and 5.03
5.02
6.04
DESCRIPTION OF MODIFICATION
The east 8" gravity sewer trimk line on Pawnee Trail was lowered in order to
provide gravity s~rvice for future connection to Commercial property east of
0.. ..
Tuskawilla Trails. Therevised cost for these items' deducts the deep pipe
construction and adds shallow pipe construction. In addition, once the
commercial connection is removed, then Manhole #9 can be relocated to
Station 10+60 Pawnee Trail. This results in a reduction in: pipe length from
298 linear feet to 85 linear feet (see Attachment B).
The east 8" gravity sewer trunk mainon Pawnee Trail was lowered in order
to provide gravity service for future connection for Commercial property east
of Tuskawilla Trails. The revised cost for these items deducts one deep
manhole and adds a shallow manhole construction.
Due to the connection to the future Commercial property, the wetwell was
requir~d to be deeper. In addition the diameter of the wetwell, pumps
electrical controls, site work required to be enhanced to accommodate the
additional flows from the future connections. The revised cost is prorated
based on the anticipated flows to the lift station (see Attachment A),
The force main serving Phase II only, could have been 2-1/2" to Avery Park.
In order to provide for future development, a 4" force main was integrated in
the design at t~e req':lest._.6f the City. The revised cost denotes the fee for.
construction ofa 2-1I2"force main to corlnection in Avery Park.
8" Gate Valve and Box ad.ded to new 8" water main on Natures Trail at
request of the Cityto serve future connection to Commercial property east of
Tuskawilla Trails..
Page I of 1
John B. Webb & Associates, Inc.
Table 1
March 11, 2003 .
BID ESTIMATE .
~~ L~o~~"')S?f~fil~ta~ bidder.
Som' quantities~@'lfl~d hffiF5
to Bidders corrections.
Tuskawilla Trails Phase II
Item
No.
Description
Quantity Unit
Unit
Price
Total
Price
4.01. 8" pVC Gravity Sewer (0'-6' cut) 50 LF $19.50 $975.00
4.02 8" PVC Gravity Sewer (6'-8' cut) 739 LF $21.50 $15,888.50
4.03. 8" PVC Gravity Sewer (8'-10' cut) 405 LF $23.50 $9,517.50
4.04 8" PVC Gravity Sewer (10'-12' cut) 654 LF $27.00 $17,658.00
4.05' 10" PVC Gravity Sewer (14'-16' cut) 48 LF $31.50 $1,512.00
4.06 4' Dia. Sanitary Manhole: 0' to 6' Deep 1 EA $2,175.00 $2,175.00
4.07 4' Dia. Sanitary Manhole: 6' to 8' Deep 2 EA $2,435.00 $4,870.00
4.08 4' Dia. San Manhole: 8' to 10' Deep I EA $2,850.00 $2,850.00
4.09 4' Dia. San Manhole: 10' to 12' Deep 1 EA $3,500.00 $3,500.00
4.10 4' Dia. San Manhole: 12' to 14' Deep 1 EA $3,755.00 $3,755.00
4.11 4' Dia. San Manhole: 14' to 16' Deep 3 EA $4,375.00 $13,125.00
4.12 Manhole Drop Connection 2 EA $400.00 $800.00
4.13 Single Service Connection, Short 2 EA $300.00 $600.00
4.14 Double SerVice Connection, Short 8 EA $320.00 $2,560.00
4.15 Double Service COill1ection, Long 7 EA $360.00 $2,520.00
5.01 Lift Station Complete in-Place (pumps, wetwell, .. LS $61,850.00 $61,85Q.~.00
hatch,. piping, electrical, controls, site work, etc.)
4" PVC Force Main and Fittings including R/W
5.02 clearing, grubbing, connect to exist. MH, removal 1 LS . $25,550.00 $25,550.00
& replacement of pavers, paving, curb and fence)
5.03 Lift Station Telemetry (SCADA) per City of Winter LS $11,280.00 $11,280.00
Springs Specifications.
Bid Estimate 1 of 3
FILE NUM 2003096856
OR BOOK 04855 PAGE 1226
March II, 2003
.. BID ESTIMATE .
Prices shown from low bidder.
Some quantities changed due
to Bidders corrections.
. Tuskawilla Trails Phase II
. [0'
;, ... ~
g,; /1;,
6.01. 1-112" PVC Pipe and Fittings 250 LF $9.75 $2,437.50
6.02 8" PVC Pipe and Fittings .2,780 LF $14.25 $39,615.00
6.03 1-1/2" Gate Valve and Box 1 EA $350.00 . $350.00
6.04 8" Gate Valve and Box 8 EA $880.00 $7,040.00
6.05 Blow Off Valve Assembly 2 EA $600.00 $1,200.00
6.06 Connect to Exist 12" Water Main on Tuskawilla Rd 1 LS $3,560.00 $3,560.00
6.07 Bore & Jack 18-inch Steel Casing with Carrier Pipe LS $26,775.00 $26,775.00
under Tuskawilla Road
6.08 PE Single Service Connection, Short 3 EA $260.00 $780.00
6.09 PE Single Service Connection, Long 5 EA $285.00 $1,425.00
6.10 PE Double Service Connection, Short 4 EA $300.00 $1,200.00
6.11 PE Double Service Connection, Long 9 EA $325.00 $2,925.00
6.12 Fire Hydrant & Appurtenances 2 EA $2,375.00 $4,750.00
7.01 12" Perforated PVC Underdrain 254 LF $22.75 $5,778.50
7.02 12" Solid Wall PVC Underdrain Conveyance Pipe 165 LF $10.90 $1,798.50
7.03 Underdrain Cleanout Box 3 EA $215.00 $645.00
7.04 18" ADS N-12 HDPE Pipe 989 LF $25.50 $25,219.50
7.05 24" ADS N-12 HDPE Pipe 152 LF $32.50 $4,940.00
7.06 36" ADS N-12 HDPE Pipe 216 LF $48.50 $10,476.00
7.07 FDOT Modified Type "F" Inlet w/Grate 5 EA $2,435.00 $12,175.00
7.08 FDOT Type "P" Manhole w/Cover 1 EA $1,850.00 $ I ,850.00
7.09 FDOT Modified Type "E" Inlet w/Bleeder, Grate EA $3,295.00 $3,295.00 .
and Skimmer
7.1 0 Mitered End Section for 12" Pipe EA $380.00 $380.00
7.11 Mitered End Section for 18" Pipe EA $625.00 $625.00
7.12 Mitered End-Section for 36" Pipe EA $1,515.00 $1,515;00
7.13 105' x 4' Spreader Swale with Erosion Control Mat LS $5,150.00 $5,150.00
Bid Estimate 2 of 3
March 11, 2003
BID ESTIMATE
FILE NUM2003096856
OR BOOK 04855 PAGE 1227
Prices shown from low bidder.
Some quantities changed due
to Bidders corrections.
. Tuskawilla Trails Phase II
",m~...
" .~~
8.01 8" Compacted Subbase
8.02 6" Compacted Soil-Cement Base
8.03 1" FDOT Type I Asphaltic Concrete Surface
8.04 12" x 12" Conc. Ribbon Curb & Stab. Subgrade
4,208
4,208
4,208
3,654
SY
SY
SY
LF
. $2.25
$6.30
$3.50
$7.05
$9,468.00
$26,510.40
$14,728.00
$25,760.70
tJ.lllm
!I~lI', iJ
10.01 Remove/Relocate Natures Way Unpaved Roadway 692 SY $12.75 $8,823.00
10.02 Remove Fence & Install Knock-~own Fence LS . $1,400.00 $1,400.00
at southeast end of Mohawk Trail
1 0.03' Archite~tural Pavers Section (Curb, Concrete Base 2 EA $2,500.00 . $5,000.00
. . and BrIck) .
10.04 Street Signs and Pavement Striping LS $2,000.00 $2,000.00
Bid Estimate 3 of 3
FILE NUM 2003096856
OR BOOK 04855 PAGE 1228
ATTACHMENT A
Determination of Cost Sharing of Lift Station Construction
Based on Wastewater Flow
Tuskawilla Trails Phase II
Project No.: S2]-01.1
March II, 2003
gpm
COST SHARING
Total Flow
Percentage
of Total Flow
Prorated Fee for
L.S. Construction
TOTAL
* Items 5.01 and 5.03 on Bid Estimate assumes total cost of $73, 130.00 for Lift Station constr.
($61,850.00 + $11,280.00 = $73,130.00)
** Wastewater flows from FDEP Permit/Sanitary Sewer Report dated November 2002.
*** WW flow from Residential estimated from 16 - 1.43 acre lots and 300 gpd per lot.
**** Combined percentage of Phase I and II is 52.85% ($38,654.00). This value is split to items
5.01 and 5.03 on the "Bid Estimate and Schedule of Cost Sharing", sheet attached.
ATTACHMENT B
COMP ARISON OF SANITARY SEWER CHANGE WITHOUT COMMERCIAL
Tuskawilla Trails Phase II
March 11,2003
From MH Pipe Plan Depth Plan Depth without Commercial
toMH Dia. (feet) (feet)
(inches) 0'-6' 6'-8' 8'-10' 10'-12' 14'-16' 0'-6' 6'-8' 8'-10' 10'-12' 14'-16'
1~'1!i& ~"'i1i ~.~ ~~~=~~ ~~~il;_ ~"'""'"~ili lfi:~ lIf~1t_ ~ ~ 11IIII
,!:;"~S...-';i,J " ~'~~~~'J ' "~~ i1i\\'ir,~~~'~ ,-"..!fF""", .. SA,1f&" " .;. '",'!o I "clt'..,: ~~a
,,..,tt "'~,_ .'.,"_ .' - ~ -~ "." ""~..- ~"~.,,
WWto 1 10 48 48
1 to 2 8 272 51 272 51
2 to 3 8 388 175 213
.., to 9 8 17 133 148 85
.J
1 to 4 8 173 173
4 to 5 8 . '. 30 30
4to 6 8 252 252
6 to 7 8 288 288
7 to 8 8 50 46 50 46
50 739 405 654 48 310 547 272 506 48
Plan Depth Plan Depth without Commercial
Manhole (feet) (feet)
Number 0'-6' 6'-8' -~~~~~ 12'-14' ~ 0'-6' ~ 10'-12' 12'-.14' 14'-16'
i:1i.llfdtl JI.~ . ~~. :!o!";.;;J;" -~ ':J1' '~b 'Ii!:. - ~ "~t~ ~""~4
'.'~~~i !S'r'IfHit"~i lIlf:!iifl~ willi_ . . ""'~"'" ""~'''''<:;v ~
~' ~~~;;Zt:i' ~?....: '"'" .,VA;'~, .& ~. ,,: 1~ ~ ... -\i,',;,t'J};,"',;~ 'k;..~~J!' '~k' ", J.
1 1 1
2 1 1
3 1 1
4 1 1
5 1 1
6 1 I 1
7 1 , 1
8 1 1
9 1 1
1 2 1 1 1 3 1 3 1 1 0 3
0"
::tJ....
r
tr:S ITI .
o
oz
~c
3
S
~ro
IXlS
U1S
U1W
S
I.D
(7\
'01Xl
DUl
G)(7\
ITI
*
Note: By not serving the commercial area, manhole #9 is relocated to station 10+60 new Pawnee Trail.
This results, in a reduction in pipe length from 298 If to 85 If.
-
I'\)
I'\)
~
FILE NUM 2003096856
OR BOOK 04855 pAGE 1230
. BID ESTIMATE AND SCHEDULE OF COST SHARING
Tuskawilla Trails - Phase II
. ..
March I ], 2003
Item
No.,
Description
Quantity . Unit
Unit
Price
Total
Price
F!o" -i
!~~i!i&(~,.
4.01 8" PVC Gravity Sewer (0'-6' cut) (add Q60)
4.02 8" PVC Gravity Sewer (6'-8' cut) (deduct 192)
4.03 8" PVC Gravity Sewer (8'-10' cut) (deduct 133)
4.04~ 8" PVC Gravity Sewer (10'-12' cut) (deduct 148)
4.05 10" PVC Gravity Sewer (14'-16' cut)
4.06 4' Dia. Sanitary Manhole: 0' to 6' Deep
4.07 4' Dia. Sanitary Manhole: 6' to 8' Deep (add J)
4.08 4' Dia. San Manhole: 8' to 10' Deep.
4.09' 4' Dia. San Manhole: 10' to 12' Deep
4.10' 4' Dia. San Manhole: 12' to 14' Deep (deduct J)
4.11 , 4' Dia. San Manhole: 14' to 16' Deep,
4.12., Manhole Drop Connection
4.13 , Single Service ~onnection, Short
4.14 Double Service Connection, Short
4.1~ Double S'ervice Connection, Long
310
547
272
506
48
1
3
1
1
o
3
2
2
8
7
LF
LF
LF
LF
LF
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
$19.50
$21.50
$23.50
$27.00
$31.50
$2,175;00
$2,435.00
$2,850.00
$3,500.00
$3,755.00
$4,375.00
$400.00
$300.00
. $320.00
$360.00
$6,045.00
$11,760.50
$6,392.00
$13,662.00
$1,512.00
. $2,175.00
$7,305.00
$2,850.00
$3,500.00
$0.00
$13,125.00
$800.00
$600.00
$2,560.00
$2,520.00
Lift Station Complete in-Place (pumps, w{:twell,
5.01 hatch, piping, electrical, controls, site work, etc) LS $32,687.73 $32,687.73
(Phase 1& II part of Lift Station cost, see Attachment "A '~
4" PVC Force Main and Fittings including R/W
5.02 clearing, grubbing, connect to exist. MH,removal LS . $17,033.33 .$17,033.33
& replacement of pavers, paving, curb and fence).
(deduct 1/3, use 2-1/2" FM)
5.03 Lift Station Telemetry (SCADA) per City of Winter LS $5;966.27 $5,966.27
Springs Specifications (see Attachment "A"/
Schedu Ie of Cost Sharing I of 3
March 11, 2003
FILENUM 2003096856
OR BOOK. 04855 PAGE 1231
BID ESTIMATE AND SCHEDULE OF COST SHARING
Tuskawilla Trails - Phase II
'. ,
6.01 1-112" PVC Pipe and Fittings 250 LF $9.75 $2,437.50
6.02 8" PVC Pipe and Fittings 2,780 LF $14.25 $39,615.00
6.03 1-112" Gate Valve and Box 1 EA $350.00 $350.00
6.04 8" Gate Valve and Box 7 EA $880.00 $6,160.00
6.05 Blow Off Valve Assembly 2 EA $600.00 $1,200.00
6.06 Connect to Exist 12" Water Main on Tuskawilla Rd 1 LS $3,560.00 $3,560.00
6.07 Bore & Jack 18-inch Steel Casing with Carrier Pipe 1 LS $26,775.00 $26,775.00
under Tuskawilla Road
6.08 PE Single Service Connection, Short 3 EA $260.00 $780.00
6.09 PE Single Service Connection, Long . 5 EA $285.00 $1,425.00
6.10 PE DoubleSe~vice Connection, Short 4 EA $300.00 $1,200.00
6.11 PE Double Service Connection, Long 9 EA $325.00 $2,925.00
6.12 Fire Hydrant & Appurtenances 2 EA $2,375.00 $4,750.00
7.01 12" Perforated PVC Underdrain 254 LF $22.75 $5,778.50
7.02 12" Solid Wall PVC Underdrain Conveyance Pipe 165 LF $10.90 $1,798.50
7.03 Underdrain Cleanout Box 3 EA $215.00 $645.00
7.04 18" ADS N-12 HDPE Pipe 989 LF $25.50 $25,219.50
7.05 24" ADS N-12 HDPE Pipe 152 LF $32.50 $4,940.00
7.06 36" ADS N-12 HDPE Pipe 216 LF $48.50 $10,476.00
7.07 FDOT Modified Type "F" Inlet w/Grate - 5 EA $2,435.00 $12,175.00
7.08 FDOT Type "P" Manhole w/Cover 1 EA $1,850.00 $1,850.00
7 09 ' FDOT Modified Type "E" Inlet w/Bleeder, Grate EA . $3,295.00 $3,295.00
. and Skimmer
7.10 Mitered End Section for 12" Pipe 1 EA $380.00 $380.00 .
7.11 Mitered End Section for 18" Pipe 1 EA $625.00 $625.00
7.12 Mitered End Section for 36" Pipe 1 EA $1,515.00 $1,515.00
7.13 105' x 4' Spreader Swale with Erosion Control Mat 1 LS $5,150.00 $5,150..00
Schedule of Cost Sharing 2 of 3
March 1.1, 2003
FILE NUM 2003096856
OR BOOK 04855 PAGE 1232
BID ESTIMATEAND SCHEDULE OF COST SHARING
Tuskawilla Trails - Phase II
. '
. . .
8.01 8" Compacted Subbase 4,208 SY $2.25 $9,468.00
8.02 6" Compacted Soil-Cement Base 4,208 SY $6.30 $26,510 .40
8.03 1" FDOT Type I Asphaltic Concrete Surface 4,208 SY $3.50 $14,728.00
8.04. 12" x 12" Conc. Ribbon Curb & Stab. Subgrade 3,654 LF . $7.05 ~25,760.70
10.01 Remove/Relocate Natures Way Unpaved Roadway 692 SY $12.75 $8,823.00
1002 Remove Fence & Install Knock-Down Fence LS $1,400.00 $1,400.00
. . at southeast end of Mohawk Trail
1003' Architectural Pavers Section (Curb, Concrete Base 2 EA $2,500.00 $5,000.00
. and Brick) . .
10.04 Street Signs and Pavement Striping 1 LS $2,000.00 $2,000.00
Schedule of Cost Sharing 3 of 3
FILE NUM 2003096856
OR BOOK 04855 PAGE 1233
EXHIBIT "C;;
TREE PROTECTION GUIDELINES
1.. Prior to construction orduring site preparation, barricading suitable to the City's
arborist shall be erected and maintained around all trees to be preserved in order
to establish a tree protection area. All trees to be preserved shall be identified on-
site by harmless marking or banding.
2. Prior to construction, tree protection signs shall be posted and maintained at all
tree protection areas. The contractor shall make every effort to protect all existing
trees to be preserved during site preparation and construction. Placement of
material, machinery, utility lines, soil, hazardous liquids, or vehicles within the
tree protection area shall be strictly prohibited. Materials, wires, signs,. or nails
shall not be attached to any tree unless such materials are needed to preserve the
tree.
3. Unless another suitable technique is approved by the City's arborist, the tree
protection barriers shall be constructed as follows: Uprights - 4" x 4" lumber on
eight-foot (8) minimum centers; horizontals - the equivalent of one (1) course of
2" x 4" lumber.
4. Tree protection barriers shall remain in place until construction is fully completed
and all paving, construction, and heavy equipment is off the Property.
5. All trees to be preserved shall have their natural soil level maintained. All efforts
shall be made through the grading and drainage plan to ma,intain the natural
drainage to and from such trees.
. 6. Any tree that may need to be moved for any reason during the construction
process shall be relocated only under the direction and written approval of the
City's arborist.
7. Properly install and maintain siltration and sediment control barriers around trees.
8. Root and canopy pruning shall. be required by a qualified. ISA arborist. Any
damaged roots shall be clean cut and covered by clean fill.
9. Owner shall abide by the reforestation standards set forth in Ordinance 2002-08,
as amended, for all trees damaged or destroyed during construction.